Code | Scheme Name | District of Location | Commen. | Comple. | PC - I Status | Status Date |
Where Pending |
Cost Orignnal / Revised |
PFY Expenditure | Original Alloc. |
Revised Alloc. |
Releases | Expenditure | Acc. Expenditure | Throw Forward | Targets | Achievements | Remarks | Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
106 (OG) |
160499-Provision for rehabilitation of Disaster Affected Government Buildings. |
Kohistan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 42.475 | 0 | 0 | 0 | 0 | 0 | 0 | 42.475 | - |
- December - 2018 |
Work started. |
No Image |
Construction of the Sereatriat Tehsil Building, Pattan Lower Kohistan | |||||||||||||||||||
106 (OG) |
160499-Provision for rehabilitation of Disaster Affected Government Buildings. |
Kohistan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 42.475 | 0 | 0 | 0 | 0 | 0 | 0 | 42.475 | - |
- November - 2018 |
Work started. |
No Image |
Construction of the Sereatriat Tehsil Building, Pattan Lower Kohistan | |||||||||||||||||||
106 (OG) |
160499-Provision for rehabilitation of Disaster Affected Government Buildings. |
Kohistan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 42.475 | 0 | 0 | 0 | 0 | 0 | 0 | 42.475 | - |
- November - 2018 |
Work started. |
No Image |
Construction of the Sereatriat Tehsil Building, Pattan Lower Kohistan | |||||||||||||||||||
106 (OG) |
160499-Provision for rehabilitation of Disaster Affected Government Buildings. |
Kohistan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 42.475 | 0 | 20 | 20 | 20 | 2.2 | 2.2 | 22.475 | 47% |
5% April - 2019 |
Work started. Redesigning of foundation /structure based on secretary CWD instructions. Cannot be completed. |
No Image |
Construction of the Sereatriat Tehsil Building, Pattan Lower Kohistan | |||||||||||||||||||
106 (OG) |
160499-Provision for rehabilitation of Disaster Affected Government Buildings. |
Kohistan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 42.475 | 0 | 20 | 20 | 20 | 2 | 2 | 22.475 | 47% |
5% March - 2019 |
Work started. Redesigning of foundation /structure based on secretary CWD instructions. Cannot be completed. |
No Image |
Construction of the Sereatriat Tehsil Building, Pattan Lower Kohistan | |||||||||||||||||||
106 (OG) |
160499-Provision for rehabilitation of Disaster Affected Government Buildings. |
Kohistan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 42.475 | 0 | 20 | 20 | 20 | 2 | 2 | 22.475 | 47% |
5% March - 2019 |
Work started. Redesigning of foundation /structure based on secretary CWD instructions. Cannot be completed. |
No Image |
Construction of the Sereatriat Tehsil Building, Pattan Lower Kohistan | |||||||||||||||||||
106 (OG) |
160499-Provision for rehabilitation of Disaster Affected Government Buildings. |
Kohistan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 42.475 | 0 | 20 | 20 | 20 | 2 | 2 | 22.475 | 47% |
5% February - 2019 |
Work started. Redesigning of foundation /structure based on secretary CWD instructions. Cannot be completed. |
No Image |
Construction of the Sereatriat Tehsil Building, Pattan Lower Kohistan | |||||||||||||||||||
106 (OG) |
160499-Provision for rehabilitation of Disaster Affected Government Buildings. |
Kohistan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 42.475 | 0 | 20 | 20 | 20 | 0 | 0 | 22.475 | 47% |
- January - 2019 |
Work started. Redesigning of foundation /structure based on secretary CWD instructions. Cannot be complted. |
No Image |
Construction of the Sereatriat Tehsil Building, Pattan Lower Kohistan | |||||||||||||||||||
106 (OG) |
160530-Provision for Design of Structural / Plumbing / Elect/ Air Conditioning various Buildings in KPK |
Peshawar BD-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 19.977 | 7.516 | 12.461 | 9.346 | 9.346 | 0 | 7.516 | 0 | 100% |
38% December - 2019 |
Structure design of GDC (boys/girls). Primary and seconadry schools, BHU, RHCs, Zone 2B (0.75 bearing capacity) completed. Plumbing design in progress. |
No Image |
Peshawar | |||||||||||||||||||
106 (OG) |
160530-Provision for Design of Structural / Plumbing / Elect/ Air Conditioning various Buildings in KPK |
Peshawar BD-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 19.977 | 7.516 | 12.461 | 9.346 | 0 | 0 | 7.516 | 0 | 100% |
38% November - 2019 |
Structure design of GDC (boys/girls). Primary and seconadry schools, BHU, RHCs, Zone 2B (0.75 bearing capacity) completed. Plumbing design in progress. |
No Image |
Peshawar | |||||||||||||||||||
106 (OG) |
160530-Provision for Design of Structural / Plumbing / Elect/ Air Conditioning various Buildings in KPK |
Peshawar BD-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 19.977 | 7.516 | 12.461 | 9.346 | 0 | 0 | 7.516 | 0 | 100% |
38% October - 2019 |
Structure design of GDC (boys/girls). Primary and seconadry schools, BHU, RHCs, Zone 2B (0.75 bearing capacity) completed. Plumbing design in progress. |
No Image |
Peshawar | |||||||||||||||||||
106 (OG) |
160530-Provision for Design of Structural / Plumbing / Elect/ Air Conditioning various Buildings in KPK |
Peshawar BD-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 19.977 | 7.516 | 12.461 | 12.461 | 3.115 | 0 | 7.516 | 0 | 100% |
38% September - 2019 |
Structure design of GDC (boys/girls). Primary and seconadry schools, BHU, RHCs, Zone 2B (0.75 bearing capacity) completed. Plumbing design in progress. |
No Image |
Peshawar | |||||||||||||||||||
106 (OG) |
160530-Provision for Design of Structural / Plumbing / Elect/ Air Conditioning various Buildings in KPK |
Peshawar BD-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 19.977 | 7.516 | 12.461 | 9.346 | 3 | 1 | 8.516 | 0 | 100% |
43% May - 2020 |
Structure design of GDC (boys/girls). Primary and seconadry schools, BHU, RHCs, Zone 2B (0.75 bearing capacity) completed. Plumbing design in progress.
Cannot be completed. |
No Image |
Peshawar | |||||||||||||||||||
106 (OG) |
160530-Provision for Design of Structural / Plumbing / Elect/ Air Conditioning various Buildings in KPK |
Peshawar BD-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 19.977 | 7.516 | 12.461 | 9.346 | 3 | 1 | 8.516 | 0 | 100% |
43% April - 2020 |
Structure design of GDC (boys/girls). Primary and seconadry schools, BHU, RHCs, Zone 2B (0.75 bearing capacity) completed. Plumbing design in progress.
Cannot be completed. |
No Image |
Peshawar | |||||||||||||||||||
106 (OG) |
160530-Provision for Design of Structural / Plumbing / Elect/ Air Conditioning various Buildings in KPK |
Peshawar BD-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 19.977 | 7.516 | 12.461 | 9.346 | 3 | 1 | 8.516 | 0 | 100% |
43% March - 2020 |
Structure design of GDC (boys/girls). Primary and seconadry schools, BHU, RHCs, Zone 2B (0.75 bearing capacity) completed. Plumbing design in progress.
Cannot be completed. |
No Image |
Peshawar | |||||||||||||||||||
106 (OG) |
160530-Provision for Design of Structural / Plumbing / Elect/ Air Conditioning various Buildings in KPK |
Peshawar BD-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 19.977 | 7.516 | 12.461 | 9.346 | 3 | 1 | 8.516 | 0 | 100% |
43% February - 2020 |
Structure design of GDC (boys/girls). Primary and seconadry schools, BHU, RHCs, Zone 2B (0.75 bearing capacity) completed. Plumbing design in progress.
Cannot be completed. |
No Image |
Peshawar | |||||||||||||||||||
106 (OG) |
160530-Provision for Design of Structural / Plumbing / Elect/ Air Conditioning various Buildings in KPK |
Peshawar BD-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 19.977 | 7.516 | 12.461 | 9.346 | 9.346 | 0 | 7.516 | 0 | 100% |
38% January - 2020 |
Structure design of GDC (boys/girls). Primary and seconadry schools, BHU, RHCs, Zone 2B (0.75 bearing capacity) completed. Plumbing design in progress. |
No Image |
Peshawar | |||||||||||||||||||
106 (OG) |
140839-Strengthening & Capacity Building of Estate Office/Transport Section, Administration Department. |
Peshawar PBC-2 |
- | 30-06-18 | - | 13-01-16 | - | 18.302 | 0.124 | 13.5 | 8.5 | 1.075 | 0 | 0.124 | 4.678 | 74% |
1% December - 2017 |
Plans approved. Layout given. Revised DCE for Rs.15.570 submitted to Admin Deptt for changed scope. |
No Image |
106 (OG) |
160499-Provision for rehabilitation of Disaster Affected Government Buildings. |
Peshawar PBC-2 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 30.346 | 0 | 5 | 5 | 5 | 0 | 0 | 25.346 | 16% |
- December - 2018 |
NOC from Admin Deptt awaited for demolishing of old building. |
No Image |
Re-construction of Mosque | |||||||||||||||||||
106 (OG) |
140839-Strengthening & Capacity Building of Estate Office/Transport Section, Administration Department. |
Peshawar PBC-2 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 18.302 | 0.124 | 13.5 | 13.5 | 6.075 | 0 | 0.124 | 4.678 | 74% |
1% November - 2017 |
Plans approved. Layout given. Revised DCE for Rs.15.570 submitted to Admin Deptt for changed scope. |
No Image |
106 (OG) |
160499-Provision for rehabilitation of Disaster Affected Government Buildings. |
Peshawar PBC-2 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 30.346 | 0 | 5 | 5 | 5 | 0 | 0 | 25.346 | 16% |
- November - 2018 |
NOC from Admin Deptt awaited for demolishing of old building. |
No Image |
Re-construction of Mosque | |||||||||||||||||||
106 (OG) |
160499-Provision for rehabilitation of Disaster Affected Government Buildings. |
Peshawar PBC-2 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 30.346 | 0 | 5 | 5 | 5 | 0 | 0 | 25.346 | 16% |
- November - 2018 |
NOC from Admin Deptt awaited for demolishing of old building. |
No Image |
Re-construction of Mosque | |||||||||||||||||||
106 (OG) |
140839-Strengthening & Capacity Building of Estate Office/Transport Section, Administration Department. |
Peshawar PBC-2 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 18.302 | 0.124 | 13.5 | 13.5 | 6.075 | 0 | 0.124 | 4.678 | 74% |
1% October - 2017 |
Plans approved. Layout given. Revised DCE for Rs.15.570 submitted to Admin Deptt for changed scope. |
No Image |
106 (OG) |
140839-Strengthening & Capacity Building of Estate Office/Transport Section, Administration Department. |
Peshawar PBC-2 |
- | 30-06-18 | - | 13-01-16 | - | 18.302 | 0.124 | 13.5 | 13.5 | 6.075 | 0 | 0.124 | 4.678 | 74% |
1% September - 2017 |
Plans approved. Layout given. Revised DCE for Rs.15.570 submitted to Admin Deptt for changed scope. |
No Image |
106 (OG) |
140839-Strengthening & Capacity Building of Estate Office/Transport Section, Administration Department. |
Peshawar PBC-2 |
- | 30-06-18 | - | 13-01-16 | - | 18.302 | 0.124 | 13.5 | 13.5 | 6.075 | 0 | 0.124 | 4.678 | 74% |
1% August - 2017 |
Plans approved. Layout given. Revised DCE for Rs.15.57 submitted to Admins Deptt. |
No Image |
106 (OG) |
140839-Strengthening & Capacity Building of Estate Office/Transport Section, Administration Department. |
Peshawar PBC-2 |
- | 30-06-18 | - | 13-01-16 | - | 18.302 | 0.124 | 13.5 | 13.5 | 6.075 | 0 | 0.124 | 4.678 | 74% |
1% July - 2017 |
Plans approved. Layout given. Revised DCE for Rs.15.57 submitted to Admins Deptt. |
No Image |
106 (OG) |
140839-Strengthening & Capacity Building of Estate Office/Transport Section, Administration Department. |
Peshawar PBC-2 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 18.302 | 0.125 | 13.5 | 8.5 | 0 | 0 | 0.125 | 4.677 | 74% |
1% June - 2018 |
Plans approved. Layout given. Revised DCE for Rs.15.570 submitted to Admin Deptt for changed scope. |
No Image |
Peshawar | |||||||||||||||||||
106 (OG) |
140839-Strengthening & Capacity Building of Estate Office/Transport Section, Administration Department. |
Peshawar PBC-2 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 18.302 | 0.125 | 13.5 | 8.5 | 0 | 0 | 0.125 | 4.677 | 74% |
1% May - 2018 |
Plans approved. Layout given. Revised DCE for Rs.15.570 submitted to Admin Deptt for changed scope. |
No Image |
Peshawar | |||||||||||||||||||
106 (OG) |
140839-Strengthening & Capacity Building of Estate Office/Transport Section, Administration Department. |
Peshawar PBC-2 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 18.302 | 0.125 | 13.5 | 8.5 | 0 | 0 | 0.125 | 4.677 | 74% |
1% April - 2018 |
Plans approved. Layout given. Revised DCE for Rs.15.570 submitted to Admin Deptt for changed scope. |
No Image |
Peshawar | |||||||||||||||||||
106 (OG) |
160499-Provision for rehabilitation of Disaster Affected Government Buildings. |
Peshawar PBC-2 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 30.346 | 0 | 5 | 5 | 5 | 0 | 0 | 25.346 | 16% |
- April - 2019 |
NOC from Admin Deptt awaited for demolishing of old building. |
No Image |
Re-construction of Mosque | |||||||||||||||||||
106 (OG) |
140839-Strengthening & Capacity Building of Estate Office/Transport Section, Administration Department. |
Peshawar PBC-2 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 18.302 | 0.125 | 13.5 | 8.5 | 0 | 0 | 0.125 | 4.677 | 74% |
1% March - 2018 |
Plans approved. Layout given. Revised DCE for Rs.15.570 submitted to Admin Deptt for changed scope. |
No Image |
Peshawar | |||||||||||||||||||
106 (OG) |
160499-Provision for rehabilitation of Disaster Affected Government Buildings. |
Peshawar PBC-2 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 30.346 | 0 | 5 | 5 | 5 | 0 | 0 | 25.346 | 16% |
- March - 2019 |
NOC from Admin Deptt awaited for demolishing of old building. |
No Image |
Re-construction of Mosque | |||||||||||||||||||
106 (OG) |
160499-Provision for rehabilitation of Disaster Affected Government Buildings. |
Peshawar PBC-2 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 30.346 | 0 | 5 | 5 | 5 | 0 | 0 | 25.346 | 16% |
- March - 2019 |
NOC from Admin Deptt awaited for demolishing of old building. |
No Image |
Re-construction of Mosque | |||||||||||||||||||
106 (OG) |
140839-Strengthening & Capacity Building of Estate Office/Transport Section, Administration Department. |
Peshawar PBC-2 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 18.302 | 0.125 | 13.5 | 8.5 | 1.075 | 0 | 0.125 | 4.677 | 74% |
1% February - 2018 |
Plans approved. Layout given. Revised DCE for Rs.15.570 submitted to Admin Deptt for changed scope. |
No Image |
Peshawar | |||||||||||||||||||
106 (OG) |
160499-Provision for rehabilitation of Disaster Affected Government Buildings. |
Peshawar PBC-2 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 30.346 | 0 | 5 | 5 | 5 | 0 | 0 | 25.346 | 16% |
- February - 2019 |
NOC from Admin Deptt awaited for demolishing of old building. |
No Image |
Re-construction of Mosque | |||||||||||||||||||
106 (OG) |
140839-Strengthening & Capacity Building of Estate Office/Transport Section, Administration Department. |
Peshawar PBC-2 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 18.302 | 0.124 | 13.5 | 8.5 | 1.075 | 0 | 0.124 | 4.678 | 74% |
1% January - 2018 |
Plans approved. Layout given. Revised DCE for Rs.15.570 submitted to Admin Deptt for changed scope. |
No Image |
106 (OG) |
160499-Provision for rehabilitation of Disaster Affected Government Buildings. |
Peshawar PBC-2 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 30.346 | 0 | 5 | 5 | 5 | 0 | 0 | 25.346 | 16% |
- January - 2019 |
NOC from Admin Deptt awaited for demolishing of old building. |
No Image |
Re-construction of Mosque | |||||||||||||||||||
106 (OG) |
160499-Provision for rehabilitation of Disaster Affected Government Buildings. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 42 | 0 | 40 | 40 | 20 | 0 | 0 | 0 | - |
- December - 2018 |
No Image | |
106 (OG) |
191087-170352-Strengthening of Artificial Insemination / Veterinay Aid Services & Disease Reporting System L&DD in FATA. [MA] |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 166.265 | 156.265 | 0 | 0 | 0 | 0 | 156.265 | 0 | - |
- December - 2020 |
No Image | |
106 (OG) |
191087-170352-Strengthening of Artificial Insemination / Veterinay Aid Services & Disease Reporting System L&DD in FATA. [MA] |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 166.265 | 156.265 | 0 | 0 | 0 | 0 | 156.265 | 0 | - |
- December - 2020 |
No Image | |
106 (OG) |
160499-Provision for rehabilitation of Disaster Affected Government Buildings. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 42 | 0 | 40 | 40 | 20 | 0 | 0 | 0 | - |
- November - 2018 |
No Image | |
106 (OG) |
160499-Provision for rehabilitation of Disaster Affected Government Buildings. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 42 | 0 | 40 | 40 | 20 | 0 | 0 | 0 | - |
- November - 2018 |
No Image | |
106 (OG) |
191087-170352-Strengthening of Artificial Insemination / Veterinay Aid Services & Disease Reporting System L&DD in FATA. [MA] |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 166.265 | 156.265 | 0 | 0 | 0 | 0 | 156.265 | 0 | - |
- October - 2020 |
No Image | |
106 (OG) |
191087-170352-Strengthening of Artificial Insemination / Veterinay Aid Services & Disease Reporting System L&DD in FATA. [MA] |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 166.265 | 156.265 | 0 | 0 | 0 | 0 | 156.265 | 0 | - |
- September - 2020 |
No Image | |
106 (OG) |
191087-170352-Strengthening of Artificial Insemination / Veterinay Aid Services & Disease Reporting System L&DD in FATA. [MA] |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 166.265 | 156.265 | 0 | 0 | 0 | 0 | 156.265 | 0 | - |
- August - 2020 |
No Image | |
106 (OG) |
191087-170352-Strengthening of Artificial Insemination / Veterinay Aid Services & Disease Reporting System L&DD in FATA. [MA] |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 166.265 | 156.265 | 0 | 0 | 0 | 0 | 156.265 | 0 | - |
July - 2020 |
No Image | |
106 (OG) |
191087-170352-Strengthening of Artificial Insemination / Veterinay Aid Services & Disease Reporting System L&DD in FATA. [MA] |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 166.265 | 156.265 | 0 | 0 | 0 | 0 | 156.265 | 0 | - |
- May - 2021 |
No Image | |
106 (OG) |
160499-Provision for rehabilitation of Disaster Affected Government Buildings. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 42 | 0 | 40 | 40 | 40 | 0 | 0 | 0 | - |
- April - 2019 |
Kohitan: Work started. Redesigning of foundation /structure based on secretary CWD instructions. Cannot be completed. |
No Image |
106 (OG) |
191087-170352-Strengthening of Artificial Insemination / Veterinay Aid Services & Disease Reporting System L&DD in FATA. [MA] |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 166.265 | 156.265 | 0 | 0 | 0 | 0 | 156.265 | 0 | - |
- April - 2021 |
No Image | |
106 (OG) |
160499-Provision for rehabilitation of Disaster Affected Government Buildings. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 42 | 0 | 40 | 40 | 40 | 0 | 0 | 0 | - |
- March - 2019 |
Kohitan: Work started. Redesigning of foundation /structure based on secretary CWD instructions. Cannot be completed. |
No Image |
Pages : 1 2 |