Code | Scheme Name | District of Location | Commen. | Comple. | PC - I Status | Status Date |
Where Pending |
Cost Orignnal / Revised |
PFY Expenditure | Original Alloc. |
Revised Alloc. |
Releases | Expenditure | Acc. Expenditure | Throw Forward | Targets | Achievements | Remarks | Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1178 (OG) |
140723-F/S, Design and Construction of Bus Terminals in Mardan, Swat, Dir Upper and District Swabi including land cost. |
Dir Upper |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 103.681 | 0 | 5 | 5 | 5 | 0 | 0 | 98.681 | 5% |
- December - 2019 |
Work order issued. Site dispute. |
No Image |
Dir Upper | |||||||||||||||||||
1178 (OG) |
140723-F/S, Design and Construction of Bus Terminals in Mardan, Swat, Dir Upper and District Swabi including land cost. |
Dir Upper |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 103.681 | 0 | 5 | 5 | 5 | 0 | 0 | 98.681 | 5% |
- November - 2019 |
Work order issued. Site dispute. |
No Image |
Dir Upper | |||||||||||||||||||
1178 (OG) |
140723-F/S, Design and Construction of Bus Terminals in Mardan, Swat, Dir Upper and District Swabi including land cost. |
Dir Upper |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 103.681 | 0 | 0 | 0 | 0 | 0 | 0 | 103.681 | - |
- October - 2019 |
Work order issued. Site dispute. |
No Image |
Dir Upper | |||||||||||||||||||
1178 (OG) |
140723-F/S, Design and Construction of Bus Terminals in Mardan, Swat, Dir Upper and District Swabi including land cost. |
Dir Upper |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 103.681 | 0 | 0 | 0 | 0 | 0 | 0 | 103.681 | - |
- September - 2019 |
Work order issued. Site dispute. |
No Image |
Dir Upper | |||||||||||||||||||
1178 (OG) |
140723-F/S, Design and Construction of Bus Terminals in Mardan, Swat, Dir Upper and District Swabi including land cost. |
Dir Upper |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 103.681 | 0 | 0 | 0 | 0 | 0 | 0 | 103.681 | - |
- August - 2019 |
Work order issued. Site dispute. |
No Image |
Dir Upper | |||||||||||||||||||
1178 (OG) |
140723-F/S, Design and Construction of Bus Terminals in Mardan, Swat, Dir Upper and District Swabi including land cost. |
Dir Upper |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 103.681 | 0 | 5 | 5 | 5 | 0 | 0 | 98.681 | 5% |
- May - 2020 |
Work order issued. Site dispute. |
No Image |
Dir Upper | |||||||||||||||||||
1178 (OG) |
140723-F/S, Design and Construction of Bus Terminals in Mardan, Swat, Dir Upper and District Swabi including land cost. |
Dir Upper |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 103.681 | 0 | 5 | 5 | 5 | 0 | 0 | 98.681 | 5% |
- April - 2020 |
Work order issued. Site dispute. |
No Image |
Dir Upper | |||||||||||||||||||
1178 (OG) |
140723-F/S, Design and Construction of Bus Terminals in Mardan, Swat, Dir Upper and District Swabi including land cost. |
Dir Upper |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 103.681 | 0 | 5 | 5 | 5 | 0 | 0 | 98.681 | 5% |
- March - 2020 |
Work order issued. Site dispute. |
No Image |
Dir Upper | |||||||||||||||||||
1178 (OG) |
140723-F/S, Design and Construction of Bus Terminals in Mardan, Swat, Dir Upper and District Swabi including land cost. |
Dir Upper |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 103.681 | 0 | 5 | 5 | 5 | 0 | 0 | 98.681 | 5% |
- February - 2020 |
Work order issued. Site dispute. |
No Image |
Dir Upper | |||||||||||||||||||
1178 (OG) |
140723-F/S, Design and Construction of Bus Terminals in Mardan, Swat, Dir Upper and District Swabi including land cost. |
Dir Upper |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 103.681 | 0 | 5 | 5 | 5 | 0 | 0 | 98.681 | 5% |
- January - 2020 |
Work order issued. Site dispute. |
No Image |
Dir Upper | |||||||||||||||||||
1178 (OG) |
140707-F/S, Design and Improvement of Road from Khaki to Fazalabad, District Mansehra. |
Mansehra |
25-05-15 | 30-06-18 | - | 22-01-15 | - | 80 | 65.692 | 39.058 | 39.058 | 19.529 | 15.892 | 81.584 | 0 | 100% |
100% December - 2017 |
Length 6.7 Km - BT completed. |
No Image |
1178 (OG) |
140707-F/S, Design and Improvement of Road from Khaki to Fazalabad, District Mansehra. |
Mansehra |
25-05-15 | 30-06-18 | - | 22-01-15 | - | 80 | 65.692 | 39.058 | 39.058 | 19.529 | 12.228 | 77.92 | 0 | 100% |
97% September - 2017 |
Length 6.7 Km - BT completed. |
No Image |
1178 (OG) |
140707-F/S, Design and Improvement of Road from Khaki to Fazalabad, District Mansehra. |
Mansehra |
25-05-15 | 30-06-18 | - | 22-01-15 | - | 80 | 65.692 | 39.058 | 39.058 | 19.529 | 6.206 | 71.898 | 0 | 100% |
90% August - 2017 |
Length 6.7 Km - Complted. |
No Image |
1178 (OG) |
140707-F/S, Design and Improvement of Road from Khaki to Fazalabad, District Mansehra. |
Mansehra |
25-05-15 | 30-06-18 | - | 22-01-15 | - | 80 | 65.692 | 39.058 | 39.058 | 13.866 | 0 | 65.692 | 0 | 100% |
82% July - 2017 |
Length 6.7 Km - 4 Km BT. Earth work 90%, structure work 100%, sub-base 600 meter, base course 2.5 Km, RW completed. Locals of the ares blocked the Manshera Oghi road due to delay in the BT of the road. |
No Image |
1178 (OG) |
140723-F/S, Design and Construction of Bus Terminals in Mardan, Swat, Dir Upper and District Swabi including land cost. |
Mansehra |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- December - 2019 |
No Image | |
1178 (OG) |
140707-F/S, Design and Improvement of Road from Khaki to Fazalabad, District Mansehra. |
Mansehra |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 80 | 65.692 | 39.058 | 39.058 | 19.529 | 12.228 | 77.92 | 0 | 100% |
97% November - 2017 |
Length 6.7 Km - BT completed. |
No Image |
1178 (OG) |
140723-F/S, Design and Construction of Bus Terminals in Mardan, Swat, Dir Upper and District Swabi including land cost. |
Mansehra |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- November - 2019 |
No Image | |
1178 (OG) |
140707-F/S, Design and Improvement of Road from Khaki to Fazalabad, District Mansehra. |
Mansehra |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 80 | 65.692 | 39.058 | 39.058 | 19.529 | 12.228 | 77.92 | 0 | 100% |
97% October - 2017 |
Length 6.7 Km - BT completed. |
No Image |
1178 (OG) |
140723-F/S, Design and Construction of Bus Terminals in Mardan, Swat, Dir Upper and District Swabi including land cost. |
Mansehra |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- October - 2019 |
No Image | |
1178 (OG) |
140723-F/S, Design and Construction of Bus Terminals in Mardan, Swat, Dir Upper and District Swabi including land cost. |
Mansehra |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- September - 2019 |
No Image | |
1178 (OG) |
140723-F/S, Design and Construction of Bus Terminals in Mardan, Swat, Dir Upper and District Swabi including land cost. |
Mansehra |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- August - 2019 |
No Image | |
1178 (OG) |
140707-F/S, Design and Improvement of Road from Khaki to Fazalabad, District Mansehra. |
Mansehra |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 80 | 65.692 | 39.058 | 21.658 | 21.658 | 21.652 | 87.344 | 0 | 100% |
100% June - 2018 |
Length 6.7 Km (width 18 ft) - completed. |
No Image |
PK-55, Mansehra (6.70 Km) | |||||||||||||||||||
1178 (OG) |
140707-F/S, Design and Improvement of Road from Khaki to Fazalabad, District Mansehra. |
Mansehra |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 80 | 65.692 | 39.058 | 39.058 | 39.058 | 19.529 | 85.221 | 0 | 100% |
100% May - 2018 |
Length 6.7 Km (width 18 ft) - completed. |
No Image |
PK-55, Mansehra (6.70 Km) | |||||||||||||||||||
1178 (OG) |
140723-F/S, Design and Construction of Bus Terminals in Mardan, Swat, Dir Upper and District Swabi including land cost. |
Mansehra |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- May - 2020 |
No Image | |
1178 (OG) |
140707-F/S, Design and Improvement of Road from Khaki to Fazalabad, District Mansehra. |
Mansehra |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 80 | 65.692 | 39.058 | 39.058 | 39.058 | 19.529 | 85.221 | 0 | 100% |
100% April - 2018 |
Length 6.7 Km (width 18 ft) - BT completed. |
No Image |
PK-55, Mansehra (6.70 Km) | |||||||||||||||||||
1178 (OG) |
140723-F/S, Design and Construction of Bus Terminals in Mardan, Swat, Dir Upper and District Swabi including land cost. |
Mansehra |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- April - 2020 |
No Image | |
1178 (OG) |
140707-F/S, Design and Improvement of Road from Khaki to Fazalabad, District Mansehra. |
Mansehra |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 80 | 65.692 | 39.058 | 39.058 | 39.058 | 19.529 | 85.221 | 0 | 100% |
100% March - 2018 |
Length 6.7 Km (width 18 ft) - BT completed. |
No Image |
PK-55, Mansehra (6.70 Km) | |||||||||||||||||||
1178 (OG) |
140723-F/S, Design and Construction of Bus Terminals in Mardan, Swat, Dir Upper and District Swabi including land cost. |
Mansehra |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- March - 2020 |
No Image | |
1178 (OG) |
140707-F/S, Design and Improvement of Road from Khaki to Fazalabad, District Mansehra. |
Mansehra |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 80 | 65.692 | 39.058 | 39.058 | 19.529 | 19.529 | 85.221 | 0 | 100% |
100% February - 2018 |
Length 6.7 Km 9width 18 ft) - BT completed. |
No Image |
PK-55, Mansehra (6.70 Km) | |||||||||||||||||||
1178 (OG) |
140723-F/S, Design and Construction of Bus Terminals in Mardan, Swat, Dir Upper and District Swabi including land cost. |
Mansehra |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- February - 2020 |
No Image | |
1178 (OG) |
140707-F/S, Design and Improvement of Road from Khaki to Fazalabad, District Mansehra. |
Mansehra |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 80 | 65.692 | 39.058 | 39.058 | 19.529 | 19.529 | 85.221 | 0 | 100% |
100% January - 2018 |
Length 6.7 Km - BT completed. |
No Image |
1178 (OG) |
140723-F/S, Design and Construction of Bus Terminals in Mardan, Swat, Dir Upper and District Swabi including land cost. |
Mansehra |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- January - 2020 |
No Image | |
1178 (OG) |
140723-F/S, Design and Construction of Bus Terminals in Mardan, Swat, Dir Upper and District Swabi including land cost. |
Mardan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 180.237 | 81.381 | 10 | 10 | 10 | 10 | 91.381 | 88.856 | 51% |
51% December - 2019 |
Main building - plinth level. BW in progress. |
No Image |
Mardan | |||||||||||||||||||
1178 (OG) |
140723-F/S, Design and Construction of Bus Terminals in Mardan, Swat, Dir Upper and District Swabi including land cost. |
Mardan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 180.237 | 81.381 | 10 | 10 | 10 | 10 | 91.381 | 88.856 | 51% |
51% November - 2019 |
Main building - plinth level. BW in progress. |
No Image |
Mardan | |||||||||||||||||||
1178 (OG) |
140723-F/S, Design and Construction of Bus Terminals in Mardan, Swat, Dir Upper and District Swabi including land cost. |
Mardan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 180.237 | 81.381 | 10 | 10 | 10 | 10 | 91.381 | 88.856 | 51% |
51% October - 2019 |
Main building - plinth level. BW in progress. |
No Image |
Mardan | |||||||||||||||||||
1178 (OG) |
140723-F/S, Design and Construction of Bus Terminals in Mardan, Swat, Dir Upper and District Swabi including land cost. |
Mardan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 180.237 | 81.381 | 10 | 10 | 10 | 7.853 | 89.234 | 88.856 | 51% |
50% September - 2019 |
Main building - plinth level. BW in progress. |
No Image |
Mardan | |||||||||||||||||||
1178 (OG) |
140723-F/S, Design and Construction of Bus Terminals in Mardan, Swat, Dir Upper and District Swabi including land cost. |
Mardan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 180.237 | 81.381 | 10 | 10 | 10 | 0 | 81.381 | 88.856 | 51% |
45% August - 2019 |
Main building - plinth level. BW in progress. |
No Image |
Mardan | |||||||||||||||||||
1178 (OG) |
140723-F/S, Design and Construction of Bus Terminals in Mardan, Swat, Dir Upper and District Swabi including land cost. |
Mardan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 180.237 | 81.381 | 59.53 | 59.53 | 59.53 | 54.692 | 136.073 | 39.326 | 78% |
75% May - 2020 |
GF Finishing in progress.
FF plastering in progress. |
No Image |
1178 (OG) |
140723-F/S, Design and Construction of Bus Terminals in Mardan, Swat, Dir Upper and District Swabi including land cost. |
Mardan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 180.237 | 81.381 | 85 | 85 | 85 | 21.174 | 102.555 | 13.856 | 92% |
57% April - 2020 |
GF Finishing in progress.
FF plastering in progress. |
No Image |
1178 (OG) |
140723-F/S, Design and Construction of Bus Terminals in Mardan, Swat, Dir Upper and District Swabi including land cost. |
Mardan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 180.237 | 81.381 | 85 | 85 | 85 | 21.174 | 102.555 | 13.856 | 92% |
57% March - 2020 |
GF Finishing in progress.
FF plastering in progress. |
No Image |
1178 (OG) |
140723-F/S, Design and Construction of Bus Terminals in Mardan, Swat, Dir Upper and District Swabi including land cost. |
Mardan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 180.237 | 81.381 | 85 | 85 | 85 | 21.174 | 102.555 | 13.856 | 92% |
57% February - 2020 |
GF Finishing in progress.
FF plastering in progress. |
No Image |
1178 (OG) |
140723-F/S, Design and Construction of Bus Terminals in Mardan, Swat, Dir Upper and District Swabi including land cost. |
Mardan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 180.237 | 81.381 | 10 | 10 | 10 | 10 | 91.381 | 88.856 | 51% |
51% January - 2020 |
Main building - plinth level. BW in progress. |
No Image |
1178 (OG) |
140723-F/S, Design and Construction of Bus Terminals in Mardan, Swat, Dir Upper and District Swabi including land cost. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 966.17 | 564.293 | 100 | 100 | 0 | 0 | 564.293 | 0 | - |
- December - 2019 |
No Image | |
1178 (OG) |
140723-F/S, Design and Construction of Bus Terminals in Mardan, Swat, Dir Upper and District Swabi including land cost. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 966.17 | 564.293 | 100 | 100 | 0 | 0 | 564.293 | 0 | - |
- November - 2019 |
No Image | |
1178 (OG) |
140723-F/S, Design and Construction of Bus Terminals in Mardan, Swat, Dir Upper and District Swabi including land cost. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 966.17 | 564.293 | 100 | 100 | 0 | 0 | 564.293 | 0 | - |
- October - 2019 |
No Image | |
1178 (OG) |
140723-F/S, Design and Construction of Bus Terminals in Mardan, Swat, Dir Upper and District Swabi including land cost. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 966.17 | 564.293 | 100 | 100 | 0 | 0 | 564.293 | 0 | - |
- September - 2019 |
No Image | |
1178 (OG) |
140723-F/S, Design and Construction of Bus Terminals in Mardan, Swat, Dir Upper and District Swabi including land cost. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 966.17 | 564.293 | 100 | 100 | 0 | 0 | 564.293 | 0 | - |
- August - 2019 |
No Image | |
1178 (OG) |
140723-F/S, Design and Construction of Bus Terminals in Mardan, Swat, Dir Upper and District Swabi including land cost. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 966.17 | 564.293 | 100 | 100 | 0 | 0 | 564.293 | 0 | - |
- May - 2020 |
No Image | |
1178 (OG) |
140723-F/S, Design and Construction of Bus Terminals in Mardan, Swat, Dir Upper and District Swabi including land cost. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 966.17 | 564.293 | 100 | 100 | 0 | 0 | 564.293 | 0 | - |
- April - 2020 |
No Image | |
1178 (OG) |
140723-F/S, Design and Construction of Bus Terminals in Mardan, Swat, Dir Upper and District Swabi including land cost. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 966.17 | 564.293 | 100 | 100 | 0 | 0 | 564.293 | 0 | - |
- March - 2020 |
No Image | |
Pages : 1 2 |