Code | Scheme Name | District of Location | Commen. | Comple. | PC - I Status | Status Date |
Where Pending |
Cost Orignnal / Revised |
PFY Expenditure | Original Alloc. |
Revised Alloc. |
Releases | Expenditure | Acc. Expenditure | Throw Forward | Targets | Achievements | Remarks | Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
151 (OG) |
150549-Establishment of 50 Boys Primary Schools in Khyber Pakhtunkhwa. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 18.312 | 0 | 0 | 0 | 0 | 0 | 0 | 18.312 | - |
- September - 2018 |
Developmental work in progress. |
No Image |
1) GPS Jaswara PK-48 | |||||||||||||||||||
151 (OG) |
150549-Establishment of 50 Boys Primary Schools in Khyber Pakhtunkhwa. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 18.312 | 0 | 0 | 0 | 0 | 0 | 0 | 18.312 | - |
- July - 2018 |
Developmental work in progress. |
No Image |
1) GPS Jaswara PK-48 | |||||||||||||||||||
151 (OG) |
170064-Construction of Boundary Wall around Graveyards & Rehabilitation of Existing Graveyards in Khyber Pakhtunkhwa (Phase-III) |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 5.083 | 3 | 2.06 | 2.06 | 2.06 | 2.06 | 5.06 | 0.023 | 100% |
100% December - 2020 |
BB Super structure in progress.
P-II |
No Image |
151 (OG) |
170064-Construction of Boundary Wall around Graveyards & Rehabilitation of Existing Graveyards in Khyber Pakhtunkhwa (Phase-III) |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 5.083 | 3 | 2.06 | 2.06 | 2.06 | 2.06 | 5.06 | 0.023 | 100% |
100% December - 2020 |
BB Super structure in progress.
P-II |
No Image |
151 (OG) |
170064-Construction of Boundary Wall around Graveyards & Rehabilitation of Existing Graveyards in Khyber Pakhtunkhwa (Phase-III) |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 5.083 | 0 | 0 | 0 | 0 | 0 | 0 | 5.083 | - |
- October - 2020 |
BB Super structure in progress. |
No Image |
151 (OG) |
150549-Establishment of 50 Boys Primary Schools in Khyber Pakhtunkhwa. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 63.713 | 15.852 | 0 | 0 | 0 | 0 | 15.852 | 47.861 | - |
25% September - 2018 |
Out of 4 units, 3 in progress, 1 site not identified (GPS Mir Ali Narmi Khel PK-72). |
No Image |
1) GPS Nawab Khan Musa Khel PK-72
2) GPS Ghora Bakka Khel PK-72
3) GPS Mir Ali Narmi Khel PK-72
4) GPS Sokari Bahadar Khel PK-70 | |||||||||||||||||||
151 (OG) |
170064-Construction of Boundary Wall around Graveyards & Rehabilitation of Existing Graveyards in Khyber Pakhtunkhwa (Phase-III) |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 5.083 | 0 | 0 | 0 | 0 | 0 | 0 | 5.083 | - |
- September - 2020 |
BB Super structure in progress. |
No Image |
151 (OG) |
170064-Construction of Boundary Wall around Graveyards & Rehabilitation of Existing Graveyards in Khyber Pakhtunkhwa (Phase-III) |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 5.083 | 0 | 0 | 0 | 0 | 0 | 0 | 5.083 | - |
- August - 2020 |
BB Super structure in progress. |
No Image |
151 (OG) |
150549-Establishment of 50 Boys Primary Schools in Khyber Pakhtunkhwa. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 63.713 | 15.852 | 0 | 0 | 0 | 0 | 15.852 | 47.861 | - |
25% July - 2018 |
Out of 4 units, 3 in progress, 1 site not identified (GPS Mir Ali Narmi Khel PK-72). |
No Image |
1) GPS Nawab Khan Musa Khel PK-72
2) GPS Ghora Bakka Khel PK-72
3) GPS Mir Ali Narmi Khel PK-72
4) GPS Sokari Bahadar Khel PK-70 | |||||||||||||||||||
151 (OG) |
170064-Construction of Boundary Wall around Graveyards & Rehabilitation of Existing Graveyards in Khyber Pakhtunkhwa (Phase-III) |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 5.083 | 0 | 0 | 0 | 0 | 0 | 0 | 5.083 | - |
- July - 2020 |
BB Super structure in progress. |
No Image |
151 (OG) |
170064-Construction of Boundary Wall around Graveyards & Rehabilitation of Existing Graveyards in Khyber Pakhtunkhwa (Phase-III) |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 5.083 | 3 | 2.06 | 2.06 | 2.06 | 1.874 | 4.874 | 0.023 | 100% |
96% May - 2021 |
Roof laid |
No Image |
Const: of Funeral Place in Graveyards at Kotka Ghazi Baka Khel | |||||||||||||||||||
151 (OG) |
170064-Construction of Boundary Wall around Graveyards & Rehabilitation of Existing Graveyards in Khyber Pakhtunkhwa (Phase-III) |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 5.083 | 3 | 2.06 | 2.06 | 2.06 | 1.874 | 4.874 | 0.023 | 100% |
96% April - 2021 |
Roof laid |
No Image |
Const: of Funeral Place in Graveyards at Kotka Ghazi Baka Khel | |||||||||||||||||||
151 (OG) |
170064-Construction of Boundary Wall around Graveyards & Rehabilitation of Existing Graveyards in Khyber Pakhtunkhwa (Phase-III) |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 5.083 | 3 | 2.06 | 2.06 | 2.06 | 1.874 | 4.874 | 0.023 | 100% |
96% March - 2021 |
Roof laid |
No Image |
Const: of Funeral Place in Graveyards at Kotka Ghazi Baka Khel | |||||||||||||||||||
151 (OG) |
170064-Construction of Boundary Wall around Graveyards & Rehabilitation of Existing Graveyards in Khyber Pakhtunkhwa (Phase-III) |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 5.083 | 3 | 2.06 | 2.06 | 2.06 | 1.874 | 4.874 | 0.023 | 100% |
96% February - 2021 |
Roof laid |
No Image |
Const: of Funeral Place in Graveyards at Kotka Ghazi Baka Khel | |||||||||||||||||||
151 (OG) |
170064-Construction of Boundary Wall around Graveyards & Rehabilitation of Existing Graveyards in Khyber Pakhtunkhwa (Phase-III) |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 5.083 | 3 | 2.06 | 2.06 | 2.06 | 1.874 | 4.874 | 0.023 | 100% |
96% January - 2021 |
BB Super structure in progress.
P-II |
No Image |
151 (OG) |
170064-Construction of Boundary Wall around Graveyards & Rehabilitation of Existing Graveyards in Khyber Pakhtunkhwa (Phase-III) |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 17.31 | 9.3926 | 2.44 | 2.44 | 2.44 | 2.44 | 11.8326 | 5.477 | 68% |
68% December - 2020 |
Out of 6 units, 2 in progress 2 DPC level, 1 site |
No Image |
1) Construction of BW around graveyard, Babaj | |||||||||||||||||||
151 (OG) |
170064-Construction of Boundary Wall around Graveyards & Rehabilitation of Existing Graveyards in Khyber Pakhtunkhwa (Phase-III) |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 17.31 | 9.3926 | 2.44 | 2.44 | 2.44 | 2.44 | 11.8326 | 5.477 | 68% |
68% December - 2020 |
Out of 6 units, 2 in progress 2 DPC level, 1 site |
No Image |
1) Construction of BW around graveyard, Babaj | |||||||||||||||||||
151 (OG) |
170064-Construction of Boundary Wall around Graveyards & Rehabilitation of Existing Graveyards in Khyber Pakhtunkhwa (Phase-III) |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 17.31 | 0 | 0 | 0 | 0 | 0 | 0 | 17.31 | - |
- October - 2020 |
Out of 6 units, 2 in progress 2 DPC level, 1 site |
No Image |
1) Construction of BW around graveyard, Babaj | |||||||||||||||||||
151 (OG) |
150549-Establishment of 50 Boys Primary Schools in Khyber Pakhtunkhwa. |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 30.597 | 1.987 | 0 | 0 | 0 | 0 | 1.987 | 28.61 | - |
6% September - 2018 |
2 units - 1 DPC level, 1 technical bid opened and evaluation under process (GPS Ugda Khapa PK-79). |
No Image |
1) GPS Faizo Pander PK-78
2) GPS Ugda Khapa PK-79 | |||||||||||||||||||
151 (OG) |
170064-Construction of Boundary Wall around Graveyards & Rehabilitation of Existing Graveyards in Khyber Pakhtunkhwa (Phase-III) |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 17.31 | 0 | 0 | 0 | 0 | 0 | 0 | 17.31 | - |
- September - 2020 |
Out of 6 units, 2 in progress 2 DPC level, 1 site |
No Image |
1) Construction of BW around graveyard, Babaj | |||||||||||||||||||
151 (OG) |
170064-Construction of Boundary Wall around Graveyards & Rehabilitation of Existing Graveyards in Khyber Pakhtunkhwa (Phase-III) |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 17.31 | 0 | 0 | 0 | 0 | 0 | 0 | 17.31 | - |
- August - 2020 |
Out of 6 units, 2 in progress 2 DPC level, 1 site |
No Image |
1) Construction of BW around graveyard, Babaj | |||||||||||||||||||
151 (OG) |
150549-Establishment of 50 Boys Primary Schools in Khyber Pakhtunkhwa. |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 30.597 | 1.987 | 0 | 0 | 0 | 0 | 1.987 | 28.61 | - |
6% July - 2018 |
2 units - 1 DPC level, 1 technical bid opened and evaluation under process ( GPS Ugda Khapa PK-79). |
No Image |
1) GPS Faizo Pander PK-78
2) GPS Ugda Khapa PK-79 | |||||||||||||||||||
151 (OG) |
170064-Construction of Boundary Wall around Graveyards & Rehabilitation of Existing Graveyards in Khyber Pakhtunkhwa (Phase-III) |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 17.31 | 0 | 0 | 0 | 0 | 0 | 0 | 17.31 | - |
- July - 2020 |
Out of 6 units, 2 in progress 2 DPC level, 1 site |
No Image |
1) Construction of BW around graveyard, Babaj | |||||||||||||||||||
151 (OG) |
170064-Construction of Boundary Wall around Graveyards & Rehabilitation of Existing Graveyards in Khyber Pakhtunkhwa (Phase-III) |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 17.31 | 7.377 | 2.44 | 2.44 | 2.44 | 2.439 | 9.816 | 7.493 | 57% |
57% May - 2021 |
06- Units
1. R/W Completed up plinth level
2. Work in progress on wall
3. DPC level
4. Completed
5. W/O issed & Site cleared in March 2020 layout given
6. Completed |
No Image |
1) Construction of BW around graveyard, Babaji village Bajkata ? Rs; 6.8 M
2. Const: of Boundary Wall around Graveyard Sher Kala Baba village Kalpani ? Rs; 3.7 M
3. Const: of boundary wall around graveyard Nawakaly ? Rs; 1.990 M
4. Const: of protecion wall for graveyard kot sori Chagharzai ? Rs; 2.218 M
5. Const: of boundary wall around graveyard Dambara Jabagai ? Rs; 1.313 M
6. Const: of boundary wall around graveyard baba Sairi Chamla ? Rs; 1.289 M | |||||||||||||||||||
151 (OG) |
170064-Construction of Boundary Wall around Graveyards & Rehabilitation of Existing Graveyards in Khyber Pakhtunkhwa (Phase-III) |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 17.31 | 7.377 | 2.44 | 2.44 | 2.44 | 2.439 | 9.816 | 7.493 | 57% |
57% April - 2021 |
06 units,
1 R/W Completed up plinth level
2 Work in progress on wall
3 DPC level
4 Completed
5 W/O issed & Site cleared in March 2020 layout given
6 completed |
No Image |
1) Construction of BW around graveyard, Babaji village Bajkata ? Rs; 6.8 M
2. Const: of Boundary Wall around Graveyard Sher Kala Baba village Kalpani ? Rs; 3.7 M
3. Const: of boundary wall around graveyard Nawakaly ? Rs; 1.990 M
4. Const: of protecion wall for graveyard kot sori Chagharzai ? Rs; 2.218 M
5. Const: of boundary wall around graveyard Dambara Jabagai ? Rs; 1.313 M
6. Const: of boundary wall around graveyard baba Sairi Chamla ? Rs; 1.289 M | |||||||||||||||||||
151 (OG) |
170064-Construction of Boundary Wall around Graveyards & Rehabilitation of Existing Graveyards in Khyber Pakhtunkhwa (Phase-III) |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 17.31 | 7.377 | 2.44 | 2.44 | 2.44 | 2.439 | 9.816 | 7.493 | 57% |
57% March - 2021 |
06 units,
1 R/W Completed up plinth level
2 Work in progress on wall
3 DPC level
4 Completed
5 W/O issed & Site cleared in March 2020 layout given
6 completed |
No Image |
1) Construction of BW around graveyard, Babaji village Bajkata ? Rs; 6.8 M
2. Const: of Boundary Wall around Graveyard Sher Kala Baba village Kalpani ? Rs; 3.7 M
3. Const: of boundary wall around graveyard Nawakaly ? Rs; 1.990 M
4. Const: of protecion wall for graveyard kot sori Chagharzai ? Rs; 2.218 M
5. Const: of boundary wall around graveyard Dambara Jabagai ? Rs; 1.313 M
6. Const: of boundary wall around graveyard baba Sairi Chamla ? Rs; 1.289 M | |||||||||||||||||||
151 (OG) |
170064-Construction of Boundary Wall around Graveyards & Rehabilitation of Existing Graveyards in Khyber Pakhtunkhwa (Phase-III) |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 17.31 | 7.377 | 2.44 | 2.44 | 2.44 | 2.439 | 9.816 | 7.493 | 57% |
57% February - 2021 |
06 units,
1 R/W Completed up plinth level
2 Work in progress on wall
3 DPC level
4 Completed
5 W/O issed & Site cleared in March 2020 layout given
6 completed |
No Image |
1) Construction of BW around graveyard, Babaji village Bajkata ? Rs; 6.8 M
2. Const: of Boundary Wall around Graveyard Sher Kala Baba village Kalpani ? Rs; 3.7 M
3. Const: of boundary wall around graveyard Nawakaly ? Rs; 1.990 M
4. Const: of protecion wall for graveyard kot sori Chagharzai ? Rs; 2.218 M
5. Const: of boundary wall around graveyard Dambara Jabagai ? Rs; 1.313 M
6. Const: of boundary wall around graveyard baba Sairi Chamla ? Rs; 1.289 M | |||||||||||||||||||
151 (OG) |
170064-Construction of Boundary Wall around Graveyards & Rehabilitation of Existing Graveyards in Khyber Pakhtunkhwa (Phase-III) |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 17.31 | 7.377 | 2.44 | 2.44 | 2.44 | 2.244 | 9.621 | 7.493 | 57% |
56% January - 2021 |
Out of 6 units, 03 units completed, 03 in progress |
No Image |
1) Construction of BW around graveyard, Babaji village Bajkata
2. Const: of Boundary Wall around Graveyard Sher Kala Baba village Kalpani
3. Const: of boundary wall around graveyard Nawakaly
4. Const: of protecion wall for graveyard kot sori Chagharzai
5. Const: of boundary wall around graveyard Dambara Jabagai
6. Const: of boundary wall around graveyard baba Sairi Chamla | |||||||||||||||||||
151 (OG) |
170064-Construction of Boundary Wall around Graveyards & Rehabilitation of Existing Graveyards in Khyber Pakhtunkhwa (Phase-III) |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1.2 | 0.791 | 0.5 | 0.5 | 0.5 | 0 | 0.791 | 0 | 100% |
66% December - 2020 |
Completed & H/O. |
No Image |
1. Leveling of paths, white washing, plantati | |||||||||||||||||||
151 (OG) |
170064-Construction of Boundary Wall around Graveyards & Rehabilitation of Existing Graveyards in Khyber Pakhtunkhwa (Phase-III) |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1.2 | 0.791 | 0.5 | 0.5 | 0.5 | 0 | 0.791 | 0 | 100% |
66% December - 2020 |
Completed & H/O. |
No Image |
1. Leveling of paths, white washing, plantati | |||||||||||||||||||
151 (OG) |
170064-Construction of Boundary Wall around Graveyards & Rehabilitation of Existing Graveyards in Khyber Pakhtunkhwa (Phase-III) |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1.2 | 0 | 0 | 0 | 0 | 0 | 0 | 1.2 | - |
- October - 2020 |
Completed & H/O. |
No Image |
1) Leveling of paths, white washing, plantati | |||||||||||||||||||
151 (OG) |
150549-Establishment of 50 Boys Primary Schools in Khyber Pakhtunkhwa. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 33.098 | 6.376 | 0 | 0 | 0 | 0 | 6.376 | 26.722 | - |
19% September - 2018 |
3 units - 1 in progress, 1 site not H/O (GPS Ismail Qalla PK-22), 1 AA awaited. |
No Image |
1) GPS for Boys at Hisara Yaseen Zai Village Sher Dil Khah Koroona PK-19
2) GPS for Boys at Maira Umarzai Village Jafar Khan Koroona PK-19
3) GPS Ismail Qalla PK-22 | |||||||||||||||||||
151 (OG) |
170064-Construction of Boundary Wall around Graveyards & Rehabilitation of Existing Graveyards in Khyber Pakhtunkhwa (Phase-III) |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1.2 | 0 | 0 | 0 | 0 | 0 | 0 | 1.2 | - |
- September - 2020 |
Completed & H/O. |
No Image |
1) Leveling of paths, white washing, plantati | |||||||||||||||||||
151 (OG) |
170064-Construction of Boundary Wall around Graveyards & Rehabilitation of Existing Graveyards in Khyber Pakhtunkhwa (Phase-III) |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1.2 | 0 | 0 | 0 | 0 | 0 | 0 | 1.2 | - |
- August - 2020 |
Completed & H/O. |
No Image |
1) Leveling of paths, white washing, plantati | |||||||||||||||||||
151 (OG) |
150549-Establishment of 50 Boys Primary Schools in Khyber Pakhtunkhwa. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 33.098 | 6.376 | 0 | 0 | 0 | 0 | 6.376 | 26.722 | - |
19% July - 2018 |
3 units - 1 in progress, 1 site not H/O (GPS Ismail Qalla PK-22), 1 AA awaited. |
No Image |
1) GPS for Boys at Hisara Yaseen Zai Village Sher Dil Khah Koroona PK-19
2) GPS for Boys at Maira Umarzai Village Jafar Khan Koroona PK-19
3) GPS Ismail Qalla PK-22 | |||||||||||||||||||
151 (OG) |
170064-Construction of Boundary Wall around Graveyards & Rehabilitation of Existing Graveyards in Khyber Pakhtunkhwa (Phase-III) |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1.2 | 0 | 0 | 0 | 0 | 0 | 0 | 1.2 | - |
- July - 2020 |
Completed & H/O. |
No Image |
1) Leveling of paths, white washing, plantati | |||||||||||||||||||
151 (OG) |
170064-Construction of Boundary Wall around Graveyards & Rehabilitation of Existing Graveyards in Khyber Pakhtunkhwa (Phase-III) |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1.2 | 0.791 | 0.5 | 0.5 | 0.5 | 0 | 0.791 | 0 | 100% |
66% May - 2021 |
01- Unit
Completed & H/O. |
No Image |
1. Leveling of paths, white washing, plantati | |||||||||||||||||||
151 (OG) |
170064-Construction of Boundary Wall around Graveyards & Rehabilitation of Existing Graveyards in Khyber Pakhtunkhwa (Phase-III) |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1.2 | 0.791 | 0.5 | 0.5 | 0.5 | 0 | 0.791 | 0 | 100% |
66% April - 2021 |
Completed & H/O. |
No Image |
1. Leveling of paths, white washing, plantati | |||||||||||||||||||
151 (OG) |
170064-Construction of Boundary Wall around Graveyards & Rehabilitation of Existing Graveyards in Khyber Pakhtunkhwa (Phase-III) |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1.2 | 0.791 | 0.5 | 0.5 | 0.5 | 0 | 0.791 | 0 | 100% |
66% March - 2021 |
Completed & H/O. |
No Image |
1. Leveling of paths, white washing, plantati | |||||||||||||||||||
151 (OG) |
170064-Construction of Boundary Wall around Graveyards & Rehabilitation of Existing Graveyards in Khyber Pakhtunkhwa (Phase-III) |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1.2 | 0.791 | 0.5 | 0.5 | 0.5 | 0 | 0.791 | 0 | 100% |
66% February - 2021 |
Completed & H/O. |
No Image |
1. Leveling of paths, white washing, plantati | |||||||||||||||||||
151 (OG) |
170064-Construction of Boundary Wall around Graveyards & Rehabilitation of Existing Graveyards in Khyber Pakhtunkhwa (Phase-III) |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1.2 | 0.791 | 0.5 | 0.5 | 0.5 | 0 | 0.791 | 0 | 100% |
66% January - 2021 |
Completed & H/O. |
No Image |
1. Leveling of paths, white washing, plantati | |||||||||||||||||||
151 (OG) |
150549-Establishment of 50 Boys Primary Schools in Khyber Pakhtunkhwa. |
Chitral |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 18.6 | 0 | 0 | 0 | 0 | 0 | 0 | 18.6 | - |
- September - 2018 |
Site selected. Work started. |
No Image |
GPS Phargram Lashpur PK-90 | |||||||||||||||||||
151 (OG) |
150549-Establishment of 50 Boys Primary Schools in Khyber Pakhtunkhwa. |
Chitral |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 18.6 | 0 | 0 | 0 | 0 | 0 | 0 | 18.6 | - |
- July - 2018 |
Site selected. Work started. |
No Image |
GPS Phargram Lashpur PK-90 | |||||||||||||||||||
151 (OG) |
150549-Establishment of 50 Boys Primary Schools in Khyber Pakhtunkhwa. |
D.I.Khan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 70.536 | 3.91 | 0 | 0 | 0 | 0 | 3.91 | 66.626 | - |
6% September - 2018 |
Out of 4 units, 1 in progress, 2 layout given, 1 work order issued, site not handed over. |
No Image |
1) GPS Hayat Jarrh PK-66
2) GPS Jeevan Abad PK-65
3) GPS Gara Hayat Kulachi PK-67
4) GPS Jhangi Khel PK-68 | |||||||||||||||||||
151 (OG) |
150549-Establishment of 50 Boys Primary Schools in Khyber Pakhtunkhwa. |
D.I.Khan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 70.536 | 3.91 | 0 | 0 | 0 | 0 | 3.91 | 66.626 | - |
6% July - 2018 |
Out of 4 units, 1 in progress, 2 layout given, 1 work order issued, site not handed over. |
No Image |
1) GPS Hayat Jarrh PK-66
2) GPS Jeevan Abad PK-65
3) GPS Gara Hayat Kulachi PK-67
4) GPS Jhangi Khel PK-68 | |||||||||||||||||||
151 (OG) |
170064-Construction of Boundary Wall around Graveyards & Rehabilitation of Existing Graveyards in Khyber Pakhtunkhwa (Phase-III) |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 5 | 4.103 | 0 | 0 | 0 | 0 | 4.103 | 0.897 | - |
82% December - 2020 |
Completed & H/O. |
No Image |
Construction of BW around adjoining graveyard | |||||||||||||||||||
151 (OG) |
170064-Construction of Boundary Wall around Graveyards & Rehabilitation of Existing Graveyards in Khyber Pakhtunkhwa (Phase-III) |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 5 | 4.103 | 0 | 0 | 0 | 0 | 4.103 | 0.897 | - |
82% December - 2020 |
Completed & H/O. |
No Image |
Construction of BW around adjoining graveyard | |||||||||||||||||||
151 (OG) |
170064-Construction of Boundary Wall around Graveyards & Rehabilitation of Existing Graveyards in Khyber Pakhtunkhwa (Phase-III) |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 5 | - |
- October - 2020 |
Completed & H/O. |
No Image |
Construction of BW around adjoining graveyard | |||||||||||||||||||
151 (OG) |
150549-Establishment of 50 Boys Primary Schools in Khyber Pakhtunkhwa. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 18.15 | 10.186 | 0 | 0 | 0 | 0 | 10.186 | 7.964 | - |
56% September - 2018 |
Finishing in progress. |
No Image |
1) GPS Khwar Kashmir PK-97 | |||||||||||||||||||
151 (OG) |
170064-Construction of Boundary Wall around Graveyards & Rehabilitation of Existing Graveyards in Khyber Pakhtunkhwa (Phase-III) |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 5 | - |
- September - 2020 |
Completed & H/O. |
No Image |
Construction of BW around adjoining graveyard | |||||||||||||||||||