Code | Scheme Name | District of Location | Commen. | Comple. | PC - I Status | Status Date |
Where Pending |
Cost Orignnal / Revised |
PFY Expenditure | Original Alloc. |
Revised Alloc. |
Releases | Expenditure | Acc. Expenditure | Throw Forward | Targets | Achievements | Remarks | Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
393 (OG) |
170557-Reconstruction of 100 Primary Schools on need basis in Khyber Pakhtunkhwa (less 47 units). |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 20.369 | 0 | 8.839 | 8.565 | 8.839 | 0.15 | 0.15 | 11.53 | 43% |
1% March - 2021 |
Dev: work in progress, M/B layout given |
No Image | |
1) GPS Nar Asparli PK-74/93 .?.. Rs; 19.300 M
2) GPS Faqir Karhi Allah Yar .?.. Rs; 5.448 M
3. GPS tabbi Murad No. 1.?.. Rs; 6.011 M | |||||||||||||||||||
393 (OG) |
170557-Reconstruction of 100 Primary Schools on need basis in Khyber Pakhtunkhwa (less 47 units). |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 20.369 | 0 | 8.839 | 8.565 | 8.839 | 0.15 | 0.15 | 11.53 | 43% |
1% February - 2021 |
Dev: work in progress, M/B layout given |
No Image | |
1) GPS Nar Asparli PK-74/93 .?.. Rs; 19.300 M
2) GPS Faqir Karhi Allah Yar .?.. Rs; 5.448 M
3. GPS tabbi Murad No. 1.?.. Rs; 6.011 M | |||||||||||||||||||
393 (OG) |
170557-Reconstruction of 100 Primary Schools on need basis in Khyber Pakhtunkhwa (less 47 units). |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 20.369 | 0 | 8.839 | 8.565 | 8.839 | 0.15 | 0.15 | 11.53 | 43% |
1% January - 2021 |
Dev: work in progress, M/B layout given |
No Image | |
1) GPS Nar Asparli PK-74/93 .?.. Rs; 19.300 M
2) GPS Faqir Karhi Allah Yar .?.. Rs; 5.448 M
3. GPS tabbi Murad No. 1.?.. Rs; 6.011 M | |||||||||||||||||||
393 (OG) |
170557-Reconstruction of 100 Primary Schools on need basis in Khyber Pakhtunkhwa (less 47 units). |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 20.369 | 0 | 11.839 | 11.839 | 11.839 | 4.435 | 4.435 | 8.53 | 58% |
22% May - 2021 |
Developmental works in progress M/B layout given |
No Image |
GGPS Bagan Pk 37 | |||||||||||||||||||
393 (OG) |
170557-Reconstruction of 100 Primary Schools on need basis in Khyber Pakhtunkhwa (less 47 units). |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 20.369 | 0 | 11.839 | 11.839 | 11.839 | 4.435 | 4.435 | 8.53 | 58% |
22% April - 2021 |
Developmental works in progress M/B layout given |
No Image |
GGPS Bagan Pk 37 | |||||||||||||||||||
393 (OG) |
170557-Reconstruction of 100 Primary Schools on need basis in Khyber Pakhtunkhwa (less 47 units). |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 20.369 | 0 | 8.839 | 8.839 | 8.839 | 3.229 | 3.229 | 11.53 | 43% |
16% March - 2021 |
Developmental works in progress M/B layout given |
No Image |
GGPS Bagan Pk 37 | |||||||||||||||||||
393 (OG) |
170557-Reconstruction of 100 Primary Schools on need basis in Khyber Pakhtunkhwa (less 47 units). |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 20.369 | 0 | 8.839 | 8.839 | 8.839 | 0.15 | 0.15 | 11.53 | 43% |
1% February - 2021 |
Developmental works in progress M/B layout given |
No Image |
GGPS Bagan Pk 37 | |||||||||||||||||||
393 (OG) |
170557-Reconstruction of 100 Primary Schools on need basis in Khyber Pakhtunkhwa (less 47 units). |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 20.369 | 0 | 479.508 | 0 | 8.839 | 0.15 | 0.15 | 0 | 100% |
1% January - 2021 |
Developmental works in progress M/B layout given |
No Image |
GGPS Bagan Pk 37 | |||||||||||||||||||
393 (OG) |
170557-Reconstruction of 100 Primary Schools on need basis in Khyber Pakhtunkhwa (less 47 units). |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 85.771 | 36.807 | 11.166 | 11.166 | 11.166 | 11.166 | 47.973 | 37.798 | 56% |
56% December - 2020 |
6- Units
2- G/F roof laid
1 - G/Floor up to DPC |
No Image |
1) GGPS Khwajamad Landidak PK-72
| |||||||||||||||||||
393 (OG) |
170557-Reconstruction of 100 Primary Schools on need basis in Khyber Pakhtunkhwa (less 47 units). |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 85.771 | 36.807 | 11.166 | 11.166 | 11.166 | 11.166 | 47.973 | 37.798 | 56% |
56% December - 2020 |
6- Units
2- G/F roof laid
1 - G/Floor up to DPC |
No Image |
1) GGPS Khwajamad Landidak PK-72
| |||||||||||||||||||
393 (OG) |
170557-Reconstruction of 100 Primary Schools on need basis in Khyber Pakhtunkhwa (less 47 units). |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 85.771 | 0 | 10.845 | 10.845 | 10.845 | 10.845 | 10.845 | 74.926 | 13% |
13% October - 2020 |
6- Units
2- G/F roof laid
1 - G/Floor up to DPC |
No Image |
1) GGPS Khwajamad Landidak PK-72
| |||||||||||||||||||
393 (OG) |
170557-Reconstruction of 100 Primary Schools on need basis in Khyber Pakhtunkhwa (less 47 units). |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 85.771 | 0 | 10.845 | 10.845 | 10.845 | 10.845 | 10.845 | 74.926 | 13% |
13% September - 2020 |
6- Units
2- G/F roof laid
1 - G/Floor up to DPC |
No Image |
1) GGPS Khwajamad Landidak PK-72
| |||||||||||||||||||
393 (OG) |
170557-Reconstruction of 100 Primary Schools on need basis in Khyber Pakhtunkhwa (less 47 units). |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 85.771 | 0 | 10.845 | 10.845 | 10.845 | 10.172 | 10.172 | 74.926 | 13% |
12% August - 2020 |
6- Units
2- G/F roof laid
1 - G/Floor up to DPC |
No Image |
1) GGPS Khwajamad Landidak PK-72
| |||||||||||||||||||
393 (OG) |
170557-Reconstruction of 100 Primary Schools on need basis in Khyber Pakhtunkhwa (less 47 units). |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 85.771 | 0 | 0 | 0 | 0 | 0 | 0 | 85.771 | - |
- July - 2020 |
6- Units
2- G/F roof laid
1 - G/Floor up to DP |
No Image |
1) GGPS Khwajamad Landidak PK-72
| |||||||||||||||||||
393 (OG) |
170557-Reconstruction of 100 Primary Schools on need basis in Khyber Pakhtunkhwa (less 47 units). |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 85.771 | 36.807 | 75.424 | 75.424 | 75.424 | 32.417 | 69.224 | 0 | 100% |
81% May - 2021 |
07- Units
1 G/F roof laid
2 Finishing
3 G/F 1st floor roof laid
4 Tender called
5 Tender cancelled
6 1st floor roof laid
7 finishing stage |
No Image |
1) GGPS Khwajamad Landidak PK-72.?.?.?.. (TS 17.650)
2 GPS Farman Manzaga ?.?.?.. (TS 17.812)
3 GGPS Naqib Ullah ?.?.?.. (TS 17.00)
4 GGPS Tehsin Kot
5 GPS Mir Abbas Khan
6 GGPS Ghazi Baka ?.?.?.. (TS 18.56)
7 GGPS Jangi Killa Pirba Khel | |||||||||||||||||||
393 (OG) |
170557-Reconstruction of 100 Primary Schools on need basis in Khyber Pakhtunkhwa (less 47 units). |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 85.771 | 36.807 | 21.824 | 21.824 | 21.824 | 21.824 | 58.631 | 27.14 | 68% |
68% April - 2021 |
7- Units
1 G/F roof laid
2 Finishing
3 G/F 1st floor roof laid
4 Tender called
5 Tender cancelled
6 1st floor roof laid
7 finishing stage |
No Image |
1) GGPS Khwajamad Landidak PK-72.?.?.?.. (TS 17.650)
2 GPS Farman Manzaga ?.?.?.. (TS 17.812)
3 GGPS Naqib Ullah ?.?.?.. (TS 17.00)
4 GGPS Tehsin Kot
5 GPS Mir Abbas Khan
6 GGPS Ghazi Baka ?.?.?.. (TS 18.56)
7 GGPS Jangi Killa Pirba Khel | |||||||||||||||||||
393 (OG) |
170557-Reconstruction of 100 Primary Schools on need basis in Khyber Pakhtunkhwa (less 47 units). |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 85.771 | 36.807 | 21.824 | 21.824 | 21.824 | 21.824 | 58.631 | 27.14 | 68% |
68% March - 2021 |
7- Units
1 G/F roof laid
2 Finishing
3 G/F 1st floor roof laid
4 Tender called
5 Tender cancelled
6 1st floor roof laid
7 finishing stage |
No Image |
1) GGPS Khwajamad Landidak PK-72.?.?.?.. (TS 17.650)
2 GPS Farman Manzaga ?.?.?.. (TS 17.812)
3 GGPS Naqib Ullah ?.?.?.. (TS 17.00)
4 GGPS Tehsin Kot
5 GPS Mir Abbas Khan
6 GGPS Ghazi Baka ?.?.?.. (TS 18.56)
7 GGPS Jangi Killa Pirba Khel | |||||||||||||||||||
393 (OG) |
170557-Reconstruction of 100 Primary Schools on need basis in Khyber Pakhtunkhwa (less 47 units). |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 85.771 | 36.807 | 21.824 | 21.824 | 21.824 | 21.824 | 58.631 | 27.14 | 68% |
68% February - 2021 |
7- Units
1 G/F roof laid
2 Finishing
3 G/F 1st floor roof laid
4 Tender called
5 Tender cancelled
6 1st floor roof laid
7 finishing stage |
No Image |
1) GGPS Khwajamad Landidak PK-72.?.?.?.. (TS 17.650)
2 GPS Farman Manzaga ?.?.?.. (TS 17.812)
3 GGPS Naqib Ullah ?.?.?.. (TS 17.00)
4 GGPS Tehsin Kot
5 GPS Mir Abbas Khan
6 GGPS Ghazi Baka ?.?.?.. (TS 18.56)
7 GGPS Jangi Killa Pirba Khel | |||||||||||||||||||
393 (OG) |
170557-Reconstruction of 100 Primary Schools on need basis in Khyber Pakhtunkhwa (less 47 units). |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 85.771 | 36.807 | 21.824 | 21.824 | 21.824 | 18.817 | 55.624 | 27.14 | 68% |
65% January - 2021 |
6- Units
2- G/F roof laid
1 - G/Floor up to DPC |
No Image |
1) GGPS Khwajamad Landidak PK-72
| |||||||||||||||||||
393 (OG) |
160522-Establishment of 10 Govt Colleges in Khyber Pakhtunkhwa. |
Battagram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- September - 2018 |
PC-I/DCE for Rs.188.448 m submitted to CPO Higher Edu on 26/03/2018. |
No Image |
GDC Kuza Banda | |||||||||||||||||||
393 (OG) |
160522-Establishment of 10 Govt Colleges in Khyber Pakhtunkhwa. |
Battagram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- July - 2018 |
PC-I/DCE for Rs.188.448 m submitted to CPO Higher Edu on 26/03/2018. |
No Image |
GDC Kuza Banda | |||||||||||||||||||
393 (OG) |
170557-Reconstruction of 100 Primary Schools on need basis in Khyber Pakhtunkhwa (less 47 units). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- December - 2020 |
AA awaited. |
No Image |
1. GPS No.2 Charsadda PK-59? Rs: 18.926 M
2. GPS Matta Pk-60? Rs: 18.876 M
| |||||||||||||||||||
393 (OG) |
170557-Reconstruction of 100 Primary Schools on need basis in Khyber Pakhtunkhwa (less 47 units). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- December - 2020 |
AA awaited. |
No Image |
1. GPS No.2 Charsadda PK-59? Rs: 18.926 M
2. GPS Matta Pk-60? Rs: 18.876 M
| |||||||||||||||||||
393 (OG) |
170557-Reconstruction of 100 Primary Schools on need basis in Khyber Pakhtunkhwa (less 47 units). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- October - 2020 |
AA awaited. |
No Image |
1) GPS No.2 Charsadda
2) GPS Matta Pk-60
| |||||||||||||||||||
393 (OG) |
170557-Reconstruction of 100 Primary Schools on need basis in Khyber Pakhtunkhwa (less 47 units). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- September - 2020 |
AA awaited. |
No Image |
1) GPS No.2 Charsadda
2) GPS Matta Pk-60
| |||||||||||||||||||
393 (OG) |
170557-Reconstruction of 100 Primary Schools on need basis in Khyber Pakhtunkhwa (less 47 units). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- August - 2020 |
AA awaited. |
No Image |
1) GPS No.2 Charsadda
2) GPS Ma | |||||||||||||||||||
393 (OG) |
170557-Reconstruction of 100 Primary Schools on need basis in Khyber Pakhtunkhwa (less 47 units). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- July - 2020 |
AA awaited. |
No Image |
1) GPS No.2 Charsadda
2) GPS Ma | |||||||||||||||||||
393 (OG) |
170557-Reconstruction of 100 Primary Schools on need basis in Khyber Pakhtunkhwa (less 47 units). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- May - 2021 |
AA awaited. |
No Image |
1. GPS No.2 Charsadda PK-59? Rs: 18.926 M
2. GPS Matta Pk-60? Rs: 18.876 M
| |||||||||||||||||||
393 (OG) |
170557-Reconstruction of 100 Primary Schools on need basis in Khyber Pakhtunkhwa (less 47 units). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- April - 2021 |
AA awaited. |
No Image |
1. GPS No.2 Charsadda PK-59? Rs: 18.926 M
2. GPS Matta Pk-60? Rs: 18.876 M
| |||||||||||||||||||
393 (OG) |
170557-Reconstruction of 100 Primary Schools on need basis in Khyber Pakhtunkhwa (less 47 units). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- March - 2021 |
AA awaited. |
No Image |
1. GPS No.2 Charsadda PK-59? Rs: 18.926 M
2. GPS Matta Pk-60? Rs: 18.876 M
| |||||||||||||||||||
393 (OG) |
170557-Reconstruction of 100 Primary Schools on need basis in Khyber Pakhtunkhwa (less 47 units). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- February - 2021 |
AA awaited. |
No Image |
1. GPS No.2 Charsadda PK-59? Rs: 18.926 M
2. GPS Matta Pk-60? Rs: 18.876 M
| |||||||||||||||||||
393 (OG) |
170557-Reconstruction of 100 Primary Schools on need basis in Khyber Pakhtunkhwa (less 47 units). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- January - 2021 |
AA awaited. |
No Image |
1. GPS No.2 Charsadda PK-59? Rs: 18.926 M
2. GPS Matta Pk-60? Rs: 18.876 M
| |||||||||||||||||||
393 (OG) |
140813-Upgradation of Booni Hospital to Category-C Hospital, District Chitral. |
Chitral |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 397.83 | 79.251 | 50 | 50 | 30 | 29.505 | 108.756 | 268.579 | 32% |
27% December - 2018 |
OPD Block - raft in progress. 20 bedded wards - raft in Progress
External WS - started.
BW started. Land payment made. |
No Image |
Chitral | |||||||||||||||||||
393 (OG) |
140813-Upgradation of Booni Hospital to Category-C Hospital, District Chitral. |
Chitral |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 397.83 | 79.251 | 50 | 50 | 30 | 25.6 | 104.851 | 268.579 | 32% |
26% November - 2018 |
OPD Block - raft in progress. 20 bedded wards - raft in Progress
External WS - started.
BW started. Land payment made. |
No Image |
Chitral | |||||||||||||||||||
393 (OG) |
140813-Upgradation of Booni Hospital to Category-C Hospital, District Chitral. |
Chitral |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 397.83 | 79.251 | 50 | 50 | 30 | 25.6 | 104.851 | 268.579 | 32% |
26% November - 2018 |
OPD Block - raft in progress. 20 bedded wards - raft in Progress
External WS - started.
BW started. Land payment made. |
No Image |
Chitral | |||||||||||||||||||
393 (OG) |
140813-Upgradation of Booni Hospital to Category-C Hospital, District Chitral. |
Chitral |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 397.83 | 79.251 | 50 | 50 | 50 | 43.694 | 122.945 | 268.579 | 32% |
31% April - 2019 |
OPD Block - raft in progress. 20 bedded wards - raft in Progress
External WS - started.
BW started. Land payment made. Demand Rs.20 m. |
No Image |
Chitral | |||||||||||||||||||
393 (OG) |
140813-Upgradation of Booni Hospital to Category-C Hospital, District Chitral. |
Chitral |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 397.83 | 79.251 | 50 | 50 | 50 | 43.694 | 122.945 | 268.579 | 32% |
31% March - 2019 |
OPD Block - raft in progress. 20 bedded wards - raft in Progress
External WS - started.
BW started. Land payment made. Demand Rs.20 m. |
No Image |
Chitral | |||||||||||||||||||
393 (OG) |
140813-Upgradation of Booni Hospital to Category-C Hospital, District Chitral. |
Chitral |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 397.83 | 79.251 | 50 | 50 | 50 | 43.694 | 122.945 | 268.579 | 32% |
31% March - 2019 |
OPD Block - raft in progress. 20 bedded wards - raft in Progress
External WS - started.
BW started. Land payment made. Demand Rs.20 m. |
No Image |
Chitral | |||||||||||||||||||
393 (OG) |
140813-Upgradation of Booni Hospital to Category-C Hospital, District Chitral. |
Chitral |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 397.83 | 79.251 | 50 | 50 | 30 | 29.505 | 108.756 | 268.579 | 32% |
27% February - 2019 |
OPD Block - raft in progress. 20 bedded wards - raft in Progress
External WS - started.
BW started. Land payment made. Demand Rs. 20 M |
No Image |
Chitral | |||||||||||||||||||
393 (OG) |
140813-Upgradation of Booni Hospital to Category-C Hospital, District Chitral. |
Chitral |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 397.83 | 79.251 | 50 | 50 | 30 | 30 | 109.251 | 268.579 | 32% |
27% January - 2019 |
OPD Block - raft in progress. 20 bedded wards - raft in Progress
External WS - started.
BW started. Land payment made. |
No Image |
Chitral | |||||||||||||||||||
393 (OG) |
170557-Reconstruction of 100 Primary Schools on need basis in Khyber Pakhtunkhwa (less 47 units). |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 57.521 | 1.098 | 27.389 | 27.389 | 27.389 | 7.389 | 8.487 | 29.034 | 50% |
15% October - 2020 |
Ist Floor S/Structure in progress. |
No Image |
393 (OG) |
170557-Reconstruction of 100 Primary Schools on need basis in Khyber Pakhtunkhwa (less 47 units). |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 57.521 | 1.098 | 7.393 | 7.393 | 7.393 | 7.389 | 8.487 | 49.03 | 15% |
15% September - 2020 |
Ist Floor S/Structure in progress. |
No Image |
393 (OG) |
170557-Reconstruction of 100 Primary Schools on need basis in Khyber Pakhtunkhwa (less 47 units). |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 57.521 | 1.098 | 7.393 | 7.393 | 7.393 | 0 | 1.098 | 49.03 | 15% |
2% August - 2020 |
Ist Floor S/Structure in progress. |
No Image |
393 (OG) |
170557-Reconstruction of 100 Primary Schools on need basis in Khyber Pakhtunkhwa (less 47 units). |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 57.521 | 0 | 0 | 0 | 0 | 0 | 0 | 57.521 | - |
- July - 2020 |
Work order issued. |
No Image |
393 (OG) |
170557-Reconstruction of 100 Primary Schools on need basis in Khyber Pakhtunkhwa (less 47 units). |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 57.521 | 1.098 | 47.207 | 47.207 | 47.207 | 33.41 | 34.508 | 9.216 | 84% |
60% May - 2021 |
04- Units
1. Finishing in progress
2. Dev: work completed
3. The old building not yet dismantled
4. Excvation as in progress |
No Image |
1. GPS Dehrai Talash
2. GPS Likor
3. GPS Beshingram
4. GPS Asbanr | |||||||||||||||||||
393 (OG) |
170557-Reconstruction of 100 Primary Schools on need basis in Khyber Pakhtunkhwa (less 47 units). |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 57.521 | 1.098 | 18.904 | 18.904 | 18.904 | 16.047 | 17.145 | 37.519 | 35% |
30% April - 2021 |
04- Units
1. Finishing in progress
2. Dev: work completed
3. The old building not yet dismantled
4. Excvation as in progress |
No Image |
1. GPS Dehrai Talash
2. GPS Likor
3. GPS Beshingram
4. GPS Asbanr | |||||||||||||||||||
393 (OG) |
170557-Reconstruction of 100 Primary Schools on need basis in Khyber Pakhtunkhwa (less 47 units). |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 57.521 | 1.098 | 18.904 | 18.904 | 18.904 | 16.047 | 17.145 | 37.519 | 35% |
30% March - 2021 |
04- Units
1. Finishing in progress
2. Dev: work completed
3. The old building not yet dismantled
4. Excvation as in progress |
No Image |
1. GPS Dehrai Talash
2. GPS Likor
3. GPS Beshingram
4. GPS Asbanr | |||||||||||||||||||
393 (OG) |
170557-Reconstruction of 100 Primary Schools on need basis in Khyber Pakhtunkhwa (less 47 units). |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 57.521 | 1.098 | 18.904 | 18.904 | 18.904 | 16.047 | 17.145 | 37.519 | 35% |
30% February - 2021 |
04- Units
1. Finishing in progress
2. Dev: work completed
3. The old building not yet dismantled
4. Excvation as in progress |
No Image |
1. GPS Dehrai Talash
2. GPS Likor
3. GPS Beshingram
4. GPS Asbanr | |||||||||||||||||||
393 (OG) |
170557-Reconstruction of 100 Primary Schools on need basis in Khyber Pakhtunkhwa (less 47 units). |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 57.521 | 1.098 | 18.904 | 18.904 | 18.904 | 16.047 | 17.145 | 37.519 | 35% |
30% January - 2021 |
04- Units
1. Finishing in progress
2. Dev: work completed
3. The old building not yet dismantled
4. Excvation as in progress |
No Image |
1. GPS Dehrai Talash
2. GPS Likor
3. GPS Beshingram
4. GPS Asbanr | |||||||||||||||||||
393 (OG) |
170557-Reconstruction of 100 Primary Schools on need basis in Khyber Pakhtunkhwa (less 47 units). |
Dir Upper |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 62.375 | 9.256 | 8.805 | 8.805 | 8.805 | 3.03 | 12.286 | 44.314 | 29% |
20% December - 2020 |
3- Units
1 work order issued,
2 work in progress |
No Image |
1) GPS Nasrat PK-91
2) GPS Atir | |||||||||||||||||||
Pages : 1 2 3 4 5 |