Code | Scheme Name | District of Location | Commen. | Comple. | PC - I Status | Status Date |
Where Pending |
Cost Orignnal / Revised |
PFY Expenditure | Original Alloc. |
Revised Alloc. |
Releases | Expenditure | Acc. Expenditure | Throw Forward | Targets | Achievements | Remarks | Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1027 (OG) |
150825-Construction and Blacktopping of roads (a) Shabqadar Chowk to Matta including Bridge, (b) Haji Zai to Yaqhi Band via Tarkha and Masal Qila to road via Mian Essa, District Charsadda. |
Charsadda |
- | - | - | 26-09-17 | - | 350 | 40 | 60 | 133.064 | 118.064 | 22.324 | 62.324 | 250 | 29% |
18% December - 2017 |
Length 7 Km - 2 Km asphalt completed. |
No Image |
1027 (OG) |
150825-Construction and Blacktopping of roads (a) Shabqadar Chowk to Matta including Bridge, (b) Haji Zai to Yaqhi Band via Tarkha and Masal Qila to road via Mian Essa, District Charsadda. |
Charsadda |
- | - | - | 03-11-16 | - | 150 | 40 | 60 | 60 | 21.3 | 0.642 | 40.642 | 50 | 67% |
27% September - 2017 |
Length 7 Km - 2 Km asphalt completed. Revised PC-I/DCE for Rs.350 m approved. AA awaited. |
No Image |
1027 (OG) |
150825-Construction and Blacktopping of roads (a) Shabqadar Chowk to Matta including Bridge, (b) Haji Zai to Yaqhi Band via Tarkha and Masal Qila to road via Mian Essa, District Charsadda. |
Charsadda |
- | - | - | 03-11-16 | - | 150 | 40 | 60 | 60 | 21.3 | 0 | 40 | 50 | 67% |
27% August - 2017 |
Length 7 Km - 2 Km asphalt completed. Revised PC-I/DCE for Rs.350 m submitted to SE Peshawar on 20/07/2017. |
No Image |
1027 (OG) |
150825-Construction and Blacktopping of roads (a) Shabqadar Chowk to Matta including Bridge, (b) Haji Zai to Yaqhi Band via Tarkha and Masal Qila to road via Mian Essa, District Charsadda. |
Charsadda |
- | - | - | 03-11-16 | - | 150 | 40 | 60 | 60 | 21.3 | 0 | 40 | 50 | 67% |
27% July - 2017 |
Length 7 Km - 2 Km asphalt completed. Revised PC-I/DCE for Rs.350 m submitted to SE Peshawar on 20/07/2017. |
No Image |
1027 (OG) |
150825-Construction and Blacktopping of roads (a) Shabqadar Chowk to Matta including Bridge, (b) Haji Zai to Yaqhi Band via Tarkha and Masal Qila to road via Mian Essa, District Charsadda. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 350 | 40 | 60 | 60 | 30 | 21.3 | 61.3 | 250 | 29% |
18% November - 2017 |
Length 7 Km - 2 Km asphalt completed. |
No Image |
1027 (OG) |
150825-Construction and Blacktopping of roads (a) Shabqadar Chowk to Matta including Bridge, (b) Haji Zai to Yaqhi Band via Tarkha and Masal Qila to road via Mian Essa, District Charsadda. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 350 | 40 | 60 | 60 | 21.3 | 0.642 | 40.642 | 250 | 29% |
12% October - 2017 |
Length 7 Km - 2 Km asphalt completed. |
No Image |
1027 (OG) |
150825-Construction and Blacktopping of roads (a) Shabqadar Chowk to Matta including Bridge, (b) Haji Zai to Yaqhi Band via Tarkha and Masal Qila to road via Mian Essa, District Charsadda. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 350 | 40 | 60 | 153.564 | 153.064 | 144.364 | 184.364 | 250 | 29% |
53% June - 2018 |
Length 7 Km - 2 Km asphalt completed. |
No Image |
1. Shabqadar Chowk to Mtta ( L 7m ) (W-24 ft )
2. Mirzai to Nusarat Zai ( L- 3 km ) ( w- 12 ft )
3. Haji Zai to Tarkha (2.5 km ) (12 ft )
4. Haji Zai to Gundha ( 6.5 km ) ( 12 ft )
5. Shab qaadr Matt aroad to Khair aabd ( 1.5 km ) ( 12 ft )
| |||||||||||||||||||
1027 (OG) |
150825-Construction and Blacktopping of roads (a) Shabqadar Chowk to Matta including Bridge, (b) Haji Zai to Yaqhi Band via Tarkha and Masal Qila to road via Mian Essa, District Charsadda. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 350 | 40 | 60 | 153.064 | 153.064 | 123.256 | 163.256 | 250 | 29% |
47% May - 2018 |
Length 7 Km - 2 Km asphalt completed. |
No Image |
1. Shabqadar Chowk to Mtta ( L 7m ) (W-24 ft )
2. Mirzai to Nusarat Zai ( L- 3 km ) ( w- 12 ft )
3. Haji Zai to Tarkha (2.5 km ) (12 ft )
4. Haji Zai to Gundha ( 6.5 km ) ( 12 ft )
5. Shab qaadr Matt aroad to Khair aabd ( 1.5 km ) ( 12 ft )
| |||||||||||||||||||
1027 (OG) |
150825-Construction and Blacktopping of roads (a) Shabqadar Chowk to Matta including Bridge, (b) Haji Zai to Yaqhi Band via Tarkha and Masal Qila to road via Mian Essa, District Charsadda. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 350 | 40 | 60 | 153.064 | 153.064 | 124.364 | 164.364 | 250 | 29% |
47% April - 2018 |
Length 7 Km - 2 Km asphalt completed. |
No Image |
1. Shabqadar Chowk to Mtta ( L 7m ) (W-24 ft )
2. Mirzai to Nusarat Zai ( L- 3 km ) ( w- 12 ft )
3. Haji Zai to Tarkha (2.5 km ) (12 ft )
4. Haji Zai to Gundha ( 6.5 km ) ( 12 ft )
5. Shab qaadr Matt aroad to Khair aabd ( 1.5 km ) ( 12 ft )
| |||||||||||||||||||
1027 (OG) |
150825-Construction and Blacktopping of roads (a) Shabqadar Chowk to Matta including Bridge, (b) Haji Zai to Yaqhi Band via Tarkha and Masal Qila to road via Mian Essa, District Charsadda. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 350 | 40 | 60 | 133.064 | 138.064 | 106.708 | 146.708 | 250 | 29% |
42% March - 2018 |
Length 7 Km - 2 Km asphalt completed. |
No Image |
1. Shabqadar Chowk to Mtta ( L 7m ) (W-24 ft )
2. Mirzai to Nusarat Zai ( L- 3 km ) ( w- 12 ft )
3. Haji Zai to Tarkha (2.5 km ) (12 ft )
4. Haji Zai to Gundha ( 6.5 km ) ( 12 ft )
5. Shab qaadr Matt aroad to Khair aabd ( 1.5 km ) ( 12 ft )
| |||||||||||||||||||
1027 (OG) |
150825-Construction and Blacktopping of roads (a) Shabqadar Chowk to Matta including Bridge, (b) Haji Zai to Yaqhi Band via Tarkha and Masal Qila to road via Mian Essa, District Charsadda. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 350 | 40 | 60 | 133.064 | 118.064 | 67.137 | 107.137 | 250 | 29% |
31% February - 2018 |
Length 7 Km - 2 Km asphalt completed. |
No Image |
1. Shabqadar Chowk to Mtta ( L 7m ) (W-24 ft )
2. Mirzai to Nusarat Zai ( L- 3 km ) ( w- 12 ft )
3. Haji Zai to Tarkha (2.5 km ) (12 ft )
4. Haji Zai to Gundha ( 6.5 km ) ( 12 ft )
5. Shab qaadr Matt aroad to Khair aabd ( 1.5 km ) ( 12 ft )
| |||||||||||||||||||
1027 (OG) |
150825-Construction and Blacktopping of roads (a) Shabqadar Chowk to Matta including Bridge, (b) Haji Zai to Yaqhi Band via Tarkha and Masal Qila to road via Mian Essa, District Charsadda. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 350 | 40 | 60 | 133.064 | 118.064 | 43.595 | 83.595 | 250 | 29% |
24% January - 2018 |
Length 7 Km - 2 Km asphalt completed. |
No Image |
Charsadda | |||||||||||||||||||
1027 (OG) |
90397-F/S and Construction of road from Chukiathan to Sheringal and Patrak by FHA (36 Km) Dir Upper. |
Dir Upper PKHA |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1798.521 | 1683.287 | 25 | 25 | 25 | 25 | 1708.287 | 90.234 | 95% |
95% December - 2018 |
Length 32 Km - earth work 70%, sub-base 50%, WBM 50% completed, asphalt wearing course 1 Km completed. |
No Image |
1) Package-1 Km-0 to 9 (9 Km)
2) Package-2 Km-9 to 16 (7 Km)
3) Package-3 Km-17 to 24 (7 Km)
4) Package-4 Km-24 to 31+797 m (7.8 Km)
5) Package-5 3 Nos bridges | |||||||||||||||||||
1027 (OG) |
90397-F/S and Construction of road from Chukiathan to Sheringal and Patrak by FHA (36 Km) Dir Upper. |
Dir Upper PKHA |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1798.521 | 1683.287 | 25 | 25 | 25 | 25 | 1708.287 | 90.234 | 95% |
95% November - 2018 |
Length 32 Km - earth work 70%, sub-base 50%, WBM 50% completed, asphalt wearing course 1 Km completed. |
No Image |
1) Package-1 Km-0 to 9 (9 Km)
2) Package-2 Km-9 to 16 (7 Km)
3) Package-3 Km-17 to 24 (7 Km)
4) Package-4 Km-24 to 31+797 m (7.8 Km)
5) Package-5 3 Nos bridges | |||||||||||||||||||
1027 (OG) |
90397-F/S and Construction of road from Chukiathan to Sheringal and Patrak by FHA (36 Km) Dir Upper. |
Dir Upper PKHA |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1798.521 | 1683.287 | 25 | 25 | 25 | 25 | 1708.287 | 90.234 | 95% |
95% November - 2018 |
Length 32 Km - earth work 70%, sub-base 50%, WBM 50% completed, asphalt wearing course 1 Km completed. |
No Image |
1) Package-1 Km-0 to 9 (9 Km)
2) Package-2 Km-9 to 16 (7 Km)
3) Package-3 Km-17 to 24 (7 Km)
4) Package-4 Km-24 to 31+797 m (7.8 Km)
5) Package-5 3 Nos bridges | |||||||||||||||||||
1027 (OG) |
90397-F/S and Construction of road from Chukiathan to Sheringal and Patrak by FHA (36 Km) Dir Upper. |
Dir Upper PKHA |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1798.521 | 1683.287 | 25 | 25 | 25 | 25 | 1708.287 | 90.234 | 95% |
95% April - 2019 |
Length 32 Km - subtantially completed. |
No Image |
1) Package-1 Km-0 to 9 (9 Km)
2) Package-2 Km-9 to 16 (7 Km)
3) Package-3 Km-17 to 24 (7 Km)
4) Package-4 Km-24 to 31+797 m (7.8 Km)
5) Package-5 3 Nos bridges | |||||||||||||||||||
1027 (OG) |
90397-F/S and Construction of road from Chukiathan to Sheringal and Patrak by FHA (36 Km) Dir Upper. |
Dir Upper PKHA |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1798.521 | 1683.287 | 25 | 25 | 25 | 25 | 1708.287 | 90.234 | 95% |
95% March - 2019 |
Length 32 Km - subtanially completed. |
No Image |
1) Package-1 Km-0 to 9 (9 Km)
2) Package-2 Km-9 to 16 (7 Km)
3) Package-3 Km-17 to 24 (7 Km)
4) Package-4 Km-24 to 31+797 m (7.8 Km)
5) Package-5 3 Nos bridges | |||||||||||||||||||
1027 (OG) |
90397-F/S and Construction of road from Chukiathan to Sheringal and Patrak by FHA (36 Km) Dir Upper. |
Dir Upper PKHA |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1798.521 | 1683.287 | 25 | 25 | 25 | 25 | 1708.287 | 90.234 | 95% |
95% March - 2019 |
Length 32 Km - subtanially completed. |
No Image |
1) Package-1 Km-0 to 9 (9 Km)
2) Package-2 Km-9 to 16 (7 Km)
3) Package-3 Km-17 to 24 (7 Km)
4) Package-4 Km-24 to 31+797 m (7.8 Km)
5) Package-5 3 Nos bridges | |||||||||||||||||||
1027 (OG) |
90397-F/S and Construction of road from Chukiathan to Sheringal and Patrak by FHA (36 Km) Dir Upper. |
Dir Upper PKHA |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1798.521 | 1683.287 | 25 | 25 | 25 | 25 | 1708.287 | 90.234 | 95% |
95% February - 2019 |
Length 32 Km - subtanially completed. |
No Image |
1) Package-1 Km-0 to 9 (9 Km)
2) Package-2 Km-9 to 16 (7 Km)
3) Package-3 Km-17 to 24 (7 Km)
4) Package-4 Km-24 to 31+797 m (7.8 Km)
5) Package-5 3 Nos bridges | |||||||||||||||||||
1027 (OG) |
90397-F/S and Construction of road from Chukiathan to Sheringal and Patrak by FHA (36 Km) Dir Upper. |
Dir Upper PKHA |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1798.521 | 1683.287 | 25 | 25 | 25 | 25 | 1708.287 | 90.234 | 95% |
95% January - 2019 |
Length 32 Km - Subtanially complted. |
No Image |
1) Package-1 Km-0 to 9 (9 Km)
2) Package-2 Km-9 to 16 (7 Km)
3) Package-3 Km-17 to 24 (7 Km)
4) Package-4 Km-24 to 31+797 m (7.8 Km)
5) Package-5 3 Nos bridges | |||||||||||||||||||
1027 (New) |
170039-Feasibility Study, Planning, Designing and Construction of Central Prison Peshawar (Phase-II).(PC-II approved on 24-08-2017) |
Peshawar |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 50 | 0 | 0.001 | 0 | 0 | 0 | 0 | 0 |
- May - 2021 |
PC-II for Rs.50 M approved on 12/09/2017 . Revised PC-I/DCE on MRS-2020 sent to IG Prison KP on 19/08/20.
A.A awaited |
No Image | |
Peshawar | |||||||||||||||||||
1027 (New) |
170039-Feasibility Study, Planning, Designing and Construction of Central Prison Peshawar (Phase-II).(PC-II approved on 24-08-2017) |
Peshawar |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 50 | 0 | 0.001 | 0 | 0 | 0 | 0 | 0 |
- April - 2021 |
PC-II for Rs.50 m approved on 12/09/2017 . Revised PC-I/DCE on MRS-2020 sent to IG Prison KP on 19/08/20.
A.A awaited |
No Image | |
Peshawar | |||||||||||||||||||
1027 (New) |
170039-Feasibility Study, Planning, Designing and Construction of Central Prison Peshawar (Phase-II).(PC-II approved on 24-08-2017) |
Peshawar PBC-2 |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 50 | 0 | 0.001 | 0.001 | 0 | 0 | 0 | 49.999 | 0% |
- December - 2020 |
PC-II for Rs.50 m approved on 12/09/2017 . Revised PC-I/DCE on MRS-2020 sent to IG Prison KP on 19/08/20. |
No Image |
Peshawar | |||||||||||||||||||
1027 (New) |
170039-Feasibility Study, Planning, Designing and Construction of Central Prison Peshawar (Phase-II).(PC-II approved on 24-08-2017) |
Peshawar PBC-2 |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 50 | 0 | 0.001 | 0.001 | 0 | 0 | 0 | 49.999 | 0% |
- December - 2020 |
PC-II for Rs.50 m approved on 12/09/2017 . Revised PC-I/DCE on MRS-2020 sent to IG Prison KP on 19/08/20. |
No Image |
Peshawar | |||||||||||||||||||
1027 (New) |
170039-Feasibility Study, Planning, Designing and Construction of Central Prison Peshawar (Phase-II).(PC-II approved on 24-08-2017) |
Peshawar PBC-2 |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 50 | 0 | 0.001 | 0.001 | 0 | 0 | 0 | 49.999 | 0% |
- October - 2020 |
PC-II for Rs.50 m approved on 12/09/2017 . Revised PC-I/DCE on MRS-2020 sent to IG Prison KP on 19/08/20. |
No Image |
Peshawar | |||||||||||||||||||
1027 (New) |
170039-Feasibility Study, Planning, Designing and Construction of Central Prison Peshawar (Phase-II).(PC-II approved on 24-08-2017) |
Peshawar PBC-2 |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 50 | 0 | 0.001 | 0.001 | 0 | 0 | 0 | 49.999 | 0% |
- September - 2020 |
PC-II for Rs.50 m approved on 12/09/2017 . Revised PC-I/DCE on MRS-2020 sent to IG Prison KP on 19/08/20. |
No Image |
Peshawar | |||||||||||||||||||
1027 (New) |
170039-Feasibility Study, Planning, Designing and Construction of Central Prison Peshawar (Phase-II).(PC-II approved on 24-08-2017) |
Peshawar PBC-2 |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 50 | 0 | 0.001 | 0.001 | 0 | 0 | 0 | 49.999 | 0% |
- August - 2020 |
PC-II for Rs.50 m approved on 12/09/2017 . Revised PC-I/DCE on MRS-2020 sent to IG Prison KP on 19/08/20. |
No Image |
Peshawar | |||||||||||||||||||
1027 (New) |
170039-Feasibility Study, Planning, Designing and Construction of Central Prison Peshawar (Phase-II).(PC-II approved on 24-08-2017) |
Peshawar PBC-2 |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 50 | 0 | 0.001 | 0 | 0 | 0 | 0 | 0 | - |
- July - 2020 |
PC-II for Rs.50 m approved on 12/09/2017 . PC-I/DCE submitted . Pe PDWP held on 7/8/20. |
No Image |
Peshawar | |||||||||||||||||||
1027 (New) |
170039-Feasibility Study, Planning, Designing and Construction of Central Prison Peshawar (Phase-II).(PC-II approved on 24-08-2017) |
Peshawar PBC-2 |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 50 | 0 | 0.001 | 0 | 0 | 0 | 0 | 49.999 | 0% |
- March - 2021 |
PC-II for Rs.50 m approved on 12/09/2017 . Revised PC-I/DCE on MRS-2020 sent to IG Prison KP on 19/08/20. |
No Image |
Peshawar | |||||||||||||||||||
1027 (New) |
170039-Feasibility Study, Planning, Designing and Construction of Central Prison Peshawar (Phase-II).(PC-II approved on 24-08-2017) |
Peshawar PBC-2 |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 50 | 0 | 0.001 | 0 | 0 | 0 | 0 | 49.999 | 0% |
- February - 2021 |
PC-II for Rs.50 m approved on 12/09/2017 . Revised PC-I/DCE on MRS-2020 sent to IG Prison KP on 19/08/20. |
No Image |
Peshawar | |||||||||||||||||||
1027 (New) |
170039-Feasibility Study, Planning, Designing and Construction of Central Prison Peshawar (Phase-II).(PC-II approved on 24-08-2017) |
Peshawar PBC-2 |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 50 | 0 | 0.001 | 0 | 0 | 0 | 0 | 49.999 | 0% |
- January - 2021 |
PC-II for Rs.50 m approved on 12/09/2017 . Revised PC-I/DCE on MRS-2020 sent to IG Prison KP on 19/08/20. |
No Image |
Peshawar | |||||||||||||||||||
1027 (OG) |
130391-F/S, Detailed Design and Supervision for RCC Bridges in Khyber Pakhtunkhwa. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 100 | 10.27 | 15 | -0.00025 | 0 | 0 | 10.27 | 0 | - |
- December - 2019 |
PC-II approved. |
No Image |
1027 (OG) |
130391-F/S, Detailed Design and Supervision for RCC Bridges in Khyber Pakhtunkhwa. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 100 | 10.27 | 15 | 15 | 3.75 | 0 | 10.27 | 0 | - |
- November - 2019 |
PC-II approved. |
No Image |
1027 (OG) |
130391-F/S, Detailed Design and Supervision for RCC Bridges in Khyber Pakhtunkhwa. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 100 | 10.27 | 15 | 15 | 3.75 | 0 | 10.27 | 0 | - |
- October - 2019 |
PC-II approved. |
No Image |
1027 (OG) |
130391-F/S, Detailed Design and Supervision for RCC Bridges in Khyber Pakhtunkhwa. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 100 | 10.27 | 15 | 15 | 3.75 | 0 | 10.27 | 0 | - |
- September - 2019 |
PC-II approved. |
No Image |
1027 (OG) |
130391-F/S, Detailed Design and Supervision for RCC Bridges in Khyber Pakhtunkhwa. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 100 | 10.27 | 15 | 15 | 3.75 | 0 | 10.27 | 0 | - |
- August - 2019 |
PC-II approved. |
No Image |
1027 (OG) |
130391-F/S, Detailed Design and Supervision for RCC Bridges in Khyber Pakhtunkhwa. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 100 | 10.27 | 15 | -0.00025 | 0 | 0 | 10.27 | 0 | - |
- May - 2020 |
PC-II approved. |
No Image |
1027 (OG) |
130391-F/S, Detailed Design and Supervision for RCC Bridges in Khyber Pakhtunkhwa. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 100 | 10.27 | 15 | -0.00025 | 0 | 0 | 10.27 | 0 | - |
- April - 2020 |
PC-II approved. |
No Image |
1027 (OG) |
130391-F/S, Detailed Design and Supervision for RCC Bridges in Khyber Pakhtunkhwa. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 100 | 10.27 | 15 | -0.00025 | 0 | 0 | 10.27 | 0 | - |
- March - 2020 |
PC-II approved. |
No Image |
1027 (OG) |
130391-F/S, Detailed Design and Supervision for RCC Bridges in Khyber Pakhtunkhwa. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 100 | 10.27 | 15 | -0.00025 | 0 | 0 | 10.27 | 0 | - |
- February - 2020 |
PC-II approved. |
No Image |
1027 (OG) |
130391-F/S, Detailed Design and Supervision for RCC Bridges in Khyber Pakhtunkhwa. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 100 | 10.27 | 15 | -0.00025 | 0 | 0 | 10.27 | 0 | - |
- January - 2020 |
PC-II approved. |
No Image |
Pages : 1 |