Code | Scheme Name | District of Location | Commen. | Comple. | PC - I Status | Status Date |
Where Pending |
Cost Orignnal / Revised |
PFY Expenditure | Original Alloc. |
Revised Alloc. |
Releases | Expenditure | Acc. Expenditure | Throw Forward | Targets | Achievements | Remarks | Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
154 (OG) |
170207-Establishment of 100 Primary Schools (B&G 30:70) on need basis in Khyber Pakhtunkhwa. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 60.042 | 0 | 0 | 0 | 0 | 0 | 0 | 60.042 | - |
- September - 2018 |
Work order issued. |
No Image |
1) GGPS Seragran Aliabad PK-45 2) GGPS Kutla Jander BariPK-48 3) GGPS Sarian Bagh PK-48 | |||||||||||||||||||
154 (OG) |
170207-Establishment of 100 Primary Schools (B&G 30:70) on need basis in Khyber Pakhtunkhwa. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 60.042 | 0 | 0 | 0 | 0 | 0 | 0 | 60.042 | - |
- July - 2018 |
Approved. |
No Image |
1) GGPS Seragran Aliabad PK-45 2) GGPS Kutla Jander BariPK-48 3) GGPS Sarian Bagh PK-48 | |||||||||||||||||||
154 (OG) |
170207-Establishment of 100 Primary Schools (B&G 30:70) on need basis in Khyber Pakhtunkhwa. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 138.602 | 0 | 0 | 0 | 0 | 0 | 0 | 138.602 | - |
- September - 2018 |
5 units - 2 layout given, 3 waiting for site plan. |
No Image |
1) GGPS Ibrahim Utin Khel PK-71
2) GGPS Bhetani Koroona Sher Adam PK-72
3) GGPS Mir Sharoof Khan Baraim Khel PK-72
4) GGPS Fares Khan Kotka Nawrez Sardi Khel PK-72
5) GPS Gandairy Killa Armanullah PK-71
6) GPS Hawaid Landidak PK-72
7) GPS Nar Shukrullah PK-73
8) GGPS Sada Khel Nawali Khan PK-71 | |||||||||||||||||||
154 (OG) |
170207-Establishment of 100 Primary Schools (B&G 30:70) on need basis in Khyber Pakhtunkhwa. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 138.602 | 0 | 0 | 0 | 0 | 0 | 0 | 138.602 | - |
- July - 2018 |
Work order issued (4 units).Tender under procss (1 unit). |
No Image |
1) GGPS Ibrahim Utin Khel PK-71
2) GGPS Bhetani Koroona Sher Adam PK-72
3) GGPS Mir Sharoof Khan Baraim Khel PK-72
4) GGPS Fares Khan Kotka Nawrez Sardi Khel PK-72
5) GPS Gandairy Killa Armanullah PK-71
6) GPS Hawaid Landidak PK-72
7) GPS Nar Shukrullah PK-73
8) GGPS Sada Khel Nawali Khan PK-71 | |||||||||||||||||||
154 (OG) |
170207-Establishment of 100 Primary Schools (B&G 30:70) on need basis in Khyber Pakhtunkhwa. |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 34.565 | 0 | 0 | 0 | 0 | 0 | 0 | 34.565 | - |
- September - 2018 |
2 units - 1 work order issued, 1 tender approval under process (GPS Gul Kanda PK-78). |
No Image |
1) GPS Gul Kanda PK-78
2) GPS Baba Faiza PK-78 | |||||||||||||||||||
154 (OG) |
170207-Establishment of 100 Primary Schools (B&G 30:70) on need basis in Khyber Pakhtunkhwa. |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 34.565 | 0 | 0 | 0 | 0 | 0 | 0 | 34.565 | - |
- July - 2018 |
2 units - 1 work order issued, 1 tender approval under process (GPS Gul Kanda PK-78). |
No Image |
1) GPS Gul Kanda PK-78
2) GPS Baba Faiza PK-78 | |||||||||||||||||||
154 (OG) |
190075-Construction & Reconstruction of Masajids, Darul Ulooms & Deeni Madaris in Khyber Pakhtunkhwa |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 2.5 | 0 | 1.5 | 1.5 | 1.5 | 1.243 | 1.243 | 1 | 60% |
50% May - 2021 |
02- Units
1. Column footing in progress
2. Work Completed
Demand Rs: 2.50 |
No Image |
1. Const: of Masjid/Madrasa Almasoma Umar Farooq ? Rs; 1.0 M
2. Const: of Darul Uloom Islamia Said Aliya Pir Baba ? Rs; 1.5 M
Scope of work:
| |||||||||||||||||||
154 (OG) |
190075-Construction & Reconstruction of Masajids, Darul Ulooms & Deeni Madaris in Khyber Pakhtunkhwa |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 2.5 | 0 | 0 | 0 | 0 | 0 | 0 | 2.5 | - |
- April - 2021 |
02 units
1. Column footing in progress
2. shed in progress
Demand Rs: 2.50 |
No Image |
1. Const: of Masjid/Madrasa Almasoma Umar Farooq ? Rs; 1.0 M
2. Const: of Darul Uloom Islamia Said Aliya Pir Baba ? Rs; 1.5 M
| |||||||||||||||||||
154 (OG) |
190075-Construction & Reconstruction of Masajids, Darul Ulooms & Deeni Madaris in Khyber Pakhtunkhwa |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 2.5 | 0 | 0 | 0 | 0 | 0 | 0 | 2.5 | - |
- March - 2021 |
02 units
1. Column footing in progress
2. shed in progress
Demand Rs: 2.50 |
No Image |
1. Const: of Masjid/Madrasa Almasoma Umar Farooq ? Rs; 1.0 M
2. Const: of Darul Uloom Islamia Said Aliya Pir Baba ? Rs; 1.5 M
| |||||||||||||||||||
154 (OG) |
190075-Construction & Reconstruction of Masajids, Darul Ulooms & Deeni Madaris in Khyber Pakhtunkhwa |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 2.5 | 0 | 0 | 0 | 0 | 0 | 0 | 2.5 | - |
- February - 2021 |
02 units
1. Column footing in progress
2. shed in progress
Demand Rs: 2.50 |
No Image |
1. Const: of Masjid/Madrasa Almasoma Umar Farooq ? Rs; 1.0 M
2. Const: of Darul Uloom Islamia Said Aliya Pir Baba ? Rs; 1.5 M
| |||||||||||||||||||
154 (OG) |
190075-Construction & Reconstruction of Masajids, Darul Ulooms & Deeni Madaris in Khyber Pakhtunkhwa |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 2.5 | 0 | 0 | 0 | 0 | 0 | 0 | 2.5 | - |
- January - 2021 |
work in progress |
No Image |
1. Const: of Masjid/Madrasa Almasoma Umar Farooq
2. Const: of Darul Uloom Islamia Said Aliya Pir Baba
| |||||||||||||||||||
154 (OG) |
170207-Establishment of 100 Primary Schools (B&G 30:70) on need basis in Khyber Pakhtunkhwa. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 32.636 | 0 | 0 | 0 | 0 | 0 | 0 | 32.636 | - |
- September - 2018 |
4 units - 1 AA issued, 3 AA awaited. |
No Image |
1) GPS Darwazgai PK-20 2) GPS Sepal Koroona Matta Darya Koroona PK-22 | |||||||||||||||||||
154 (OG) |
170207-Establishment of 100 Primary Schools (B&G 30:70) on need basis in Khyber Pakhtunkhwa. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 32.636 | 0 | 0 | 0 | 0 | 0 | 0 | 32.636 | - |
- July - 2018 |
4 units - 1 AA issued, 3 AA awaited. |
No Image |
1) GPS Darwazgai PK-20 2) GPS Sepal Koroona Matta Darya Koroona PK-22 | |||||||||||||||||||
154 (OG) |
190075-Construction & Reconstruction of Masajids, Darul Ulooms & Deeni Madaris in Khyber Pakhtunkhwa |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 3 | 0 | 1 | 1 | 1 | 0.999 | 0.999 | 2 | 33% |
33% May - 2021 |
02- Units
1 Completed
2 Roofing in progress |
No Image |
1. Const: of Masjid Taufiq Abad Tangi.?. Rs: 1.00 M (TS 0.819 M)
2. Const: of Masjid at Tehsil Tangi.?. Rs: 2.00 M | |||||||||||||||||||
154 (OG) |
190075-Construction & Reconstruction of Masajids, Darul Ulooms & Deeni Madaris in Khyber Pakhtunkhwa |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 3 | 0 | 1 | 1 | 1 | 0.999 | 0.999 | 2 | 33% |
33% April - 2021 |
02 Units
1 Completed
2 Roofing in progress |
No Image |
1. Const: of Masjid Taufiq Abad Tangi.?. Rs: 1.00 M (TS 0.819 M)
2. Const: of Masjid at Tehsil Tangi.?. Rs: 2.00 M | |||||||||||||||||||
154 (OG) |
190075-Construction & Reconstruction of Masajids, Darul Ulooms & Deeni Madaris in Khyber Pakhtunkhwa |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 3 | 0 | 1 | 1 | 1 | 0.999 | 0.999 | 2 | 33% |
33% March - 2021 |
02 Units
1 Completed
2 Roofing in progress |
No Image |
1. Const: of Masjid Taufiq Abad Tangi.?. Rs: 1.00 M (TS 0.819 M)
2. Const: of Masjid at Tehsil Tangi.?. Rs: 2.00 M | |||||||||||||||||||
154 (OG) |
190075-Construction & Reconstruction of Masajids, Darul Ulooms & Deeni Madaris in Khyber Pakhtunkhwa |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 3 | 0 | 1 | 1 | 1 | 0.999 | 0.999 | 2 | 33% |
33% February - 2021 |
02 Units
1 Completed
2 Roofing in progress |
No Image |
1. Const: of Masjid Taufiq Abad Tangi.?. Rs: 1.00 M (TS 0.819 M)
2. Const: of Masjid at Tehsil Tangi.?. Rs: 2.00 M | |||||||||||||||||||
154 (OG) |
190075-Construction & Reconstruction of Masajids, Darul Ulooms & Deeni Madaris in Khyber Pakhtunkhwa |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 4 | 0 | 0 | 0 | 0 | 0 | 0 | 4 | - |
- January - 2021 |
02 Units
1 Completed
2 Roofing in progress |
No Image |
1. Const: of Masjid Taufiq Abad Tangi
2. Const: of Masjid at Tehsil Tangi | |||||||||||||||||||
154 (OG) |
170207-Establishment of 100 Primary Schools (B&G 30:70) on need basis in Khyber Pakhtunkhwa. |
Chitral |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 55.663 | 0 | 0 | 0 | 0 | 0 | 0 | 55.663 | - |
- September - 2018 |
Preparation of BOQ under process. |
No Image |
1) GPS Domelnisar PK-90 2) GGPS Rumboor PK-89 | |||||||||||||||||||
154 (OG) |
170207-Establishment of 100 Primary Schools (B&G 30:70) on need basis in Khyber Pakhtunkhwa. |
Chitral |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 55.663 | 0 | 0 | 0 | 0 | 0 | 0 | 55.663 | - |
- July - 2018 |
Preparation of BOQ under process. |
No Image |
1) GPS Domelnisar PK-90 2) GGPS Rumboor PK-89 | |||||||||||||||||||
154 (OG) |
190075-Construction & Reconstruction of Masajids, Darul Ulooms & Deeni Madaris in Khyber Pakhtunkhwa |
Chitral Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 22.5 | 0 | 11.5 | 11.5 | 11.5 | 2.5 | 2.5 | 11 | 51% |
11% May - 2021 |
23- Units
All work in progress |
No Image |
Scope of work:
| |||||||||||||||||||
154 (OG) |
190075-Construction & Reconstruction of Masajids, Darul Ulooms & Deeni Madaris in Khyber Pakhtunkhwa |
Chitral Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 22.5 | 0 | 11.5 | 11.5 | 11.5 | 2.5 | 2.5 | 11 | 51% |
11% April - 2021 |
23- unit work order issued and work started |
No Image |
| |||||||||||||||||||
154 (OG) |
190075-Construction & Reconstruction of Masajids, Darul Ulooms & Deeni Madaris in Khyber Pakhtunkhwa |
Chitral Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 22.5 | 0 | 2.5 | 2.5 | 2.5 | 2.5 | 2.5 | 20 | 11% |
11% March - 2021 |
23- unit work order issued and work started |
No Image |
| |||||||||||||||||||
154 (OG) |
190075-Construction & Reconstruction of Masajids, Darul Ulooms & Deeni Madaris in Khyber Pakhtunkhwa |
Chitral Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 22.5 | 0 | 2.5 | 2.5 | 2.5 | 2.5 | 2.5 | 20 | 11% |
11% February - 2021 |
23- unit work order issued and work started |
No Image |
| |||||||||||||||||||
154 (OG) |
190075-Construction & Reconstruction of Masajids, Darul Ulooms & Deeni Madaris in Khyber Pakhtunkhwa |
Chitral Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 14.5 | 0 | 2.5 | 2.5 | 2.5 | 2.5 | 2.5 | 12 | 17% |
17% January - 2021 |
work order issued work |
No Image |
23 units | |||||||||||||||||||
154 (OG) |
190075-Construction & Reconstruction of Masajids, Darul Ulooms & Deeni Madaris in Khyber Pakhtunkhwa |
Chitral Upper |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 4.643 | 0 | 0 | 0 | 0 | 0 | 0 | 4.643 | - |
- December - 2020 |
work order issued work will be started Rs.1.000 million is required. |
No Image |
154 (OG) |
190075-Construction & Reconstruction of Masajids, Darul Ulooms & Deeni Madaris in Khyber Pakhtunkhwa |
Chitral Upper |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 4.643 | 0 | 0 | 0 | 0 | 0 | 0 | 4.643 | - |
- December - 2020 |
work order issued work will be started Rs.1.000 million is required. |
No Image |
154 (OG) |
190075-Construction & Reconstruction of Masajids, Darul Ulooms & Deeni Madaris in Khyber Pakhtunkhwa |
Chitral Upper |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 4.643 | 0 | 0 | 0 | 0 | 0 | 0 | 4.643 | - |
- October - 2020 |
work order issued work will be started Rs.1.000 million is required. |
No Image |
154 (OG) |
190075-Construction & Reconstruction of Masajids, Darul Ulooms & Deeni Madaris in Khyber Pakhtunkhwa |
Chitral Upper |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 4.643 | 0 | 0 | 0 | 0 | 0 | 0 | 4.643 | - |
- September - 2020 |
work order issued work will be started Rs.1.000 million is required. |
No Image |
154 (OG) |
190075-Construction & Reconstruction of Masajids, Darul Ulooms & Deeni Madaris in Khyber Pakhtunkhwa |
Chitral Upper |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 4.643 | 0 | 0 | 0 | 0 | 0 | 0 | 4.643 | - |
- August - 2020 |
work order issued work will be started Rs.1.000 million is required. |
No Image |
154 (OG) |
190075-Construction & Reconstruction of Masajids, Darul Ulooms & Deeni Madaris in Khyber Pakhtunkhwa |
Chitral Upper |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 4.643 | 0 | 4.5 | 4.5 | 4.5 | 1.413 | 1.413 | 0.143 | 97% |
30% May - 2021 |
07 units
Finishing in progress |
No Image |
1 Jamia Masjid Zandglasht Torkhow
2 Jamia Masjid Torkhow
3 Jamia Masjid Kanan Lone
4 Jamia Masjid Faizul Uloom
5 Jamia Masjid Drassun
6 Jamia Masjid Taleemul Uran
7 Jamia Masjid Torkhow Shahgram | |||||||||||||||||||
154 (OG) |
190075-Construction & Reconstruction of Masajids, Darul Ulooms & Deeni Madaris in Khyber Pakhtunkhwa |
Chitral Upper |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 4.643 | 0 | 2.5 | 2.5 | 2.5 | 0.715 | 0.715 | 2.143 | 54% |
15% April - 2021 |
07 units
work stoped due to Cold weather |
No Image |
1 Jamia Masjid Zandglasht Torkhow
2 Jamia Masjid Torkhow
3 Jamia Masjid Kanan Lone
4 Jamia Masjid Faizul Uloom
5 Jamia Masjid Drassun
6 Jamia Masjid Taleemul Uran
7 Jamia Masjid Torkhow Shahgram | |||||||||||||||||||
154 (OG) |
190075-Construction & Reconstruction of Masajids, Darul Ulooms & Deeni Madaris in Khyber Pakhtunkhwa |
Chitral Upper |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 4.643 | 0 | 1.5 | 1.5 | 1.5 | 1.413 | 1.413 | 3.143 | 32% |
30% March - 2021 |
07 units
work stoped due to Cold weather |
No Image |
1 Jamia Masjid Zandglasht Torkhow
2 Jamia Masjid Torkhow
3 Jamia Masjid Kanan Lone
4 Jamia Masjid Faizul Uloom
5 Jamia Masjid Drassun
6 Jamia Masjid Taleemul Uran
7 Jamia Masjid Torkhow Shahgram | |||||||||||||||||||
154 (OG) |
190075-Construction & Reconstruction of Masajids, Darul Ulooms & Deeni Madaris in Khyber Pakhtunkhwa |
Chitral Upper |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 4.643 | 0 | 1.5 | 1.5 | 1.5 | 1.413 | 1.413 | 3.143 | 32% |
30% February - 2021 |
07 units
work stoped due to Cold weather |
No Image |
1 Jamia Masjid Zandglasht Torkhow
2 Jamia Masjid Torkhow
3 Jamia Masjid Kanan Lone
4 Jamia Masjid Faizul Uloom
5 Jamia Masjid Drassun
6 Jamia Masjid Taleemul Uran
7 Jamia Masjid Torkhow Shahgram | |||||||||||||||||||
154 (OG) |
190075-Construction & Reconstruction of Masajids, Darul Ulooms & Deeni Madaris in Khyber Pakhtunkhwa |
Chitral Upper |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 4.643 | 0 | 1.5 | 1.5 | 1.5 | 0 | 0 | 3.143 | 32% |
- January - 2021 |
work order issued work will be started Rs.1.000 million is required. |
No Image |
1 Jamia Masjid Zandglasht Torkhow
2 Jamia Masjid Torkhow
3 Jamia Masjid Kanan Lone
4 Jamia Masjid Faizul Uloom
5 Jamia Masjid Drassun
6 Jamia Masjid Taleemul Uran
7 Jamia Masjid Torkhow Shahgram | |||||||||||||||||||
154 (OG) |
170207-Establishment of 100 Primary Schools (B&G 30:70) on need basis in Khyber Pakhtunkhwa. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 86.202 | 0 | 0 | 0 | 0 | 0 | 0 | 86.202 | - |
- September - 2018 |
4 units - 2 work order issued, 1 site plan under process. |
No Image |
1) GPS Toda Talash PK-94
2) GGPS Kaga Chinargai PK-96
3) GPS Umary Kalay PK-97 | |||||||||||||||||||
154 (OG) |
170207-Establishment of 100 Primary Schools (B&G 30:70) on need basis in Khyber Pakhtunkhwa. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 59.859 | 0 | 0 | 0 | 0 | 0 | 0 | 59.859 | - |
- July - 2018 |
4 units - 2 work order issued, 1 site plan under process. |
No Image |
1) GPS Toda Talash PK-94
2) GGPS Kaga Chinargai PK-96
3) GPS Umary Kalay PK-97 | |||||||||||||||||||
154 (OG) |
190075-Construction & Reconstruction of Masajids, Darul Ulooms & Deeni Madaris in Khyber Pakhtunkhwa |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 12.559 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
May - 2021 |
No Image | ||
154 (OG) |
190075-Construction & Reconstruction of Masajids, Darul Ulooms & Deeni Madaris in Khyber Pakhtunkhwa |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 12.559 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
April - 2021 |
No Image | ||
154 (OG) |
190075-Construction & Reconstruction of Masajids, Darul Ulooms & Deeni Madaris in Khyber Pakhtunkhwa |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 12.559 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
March - 2021 |
No Image | ||
154 (OG) |
190075-Construction & Reconstruction of Masajids, Darul Ulooms & Deeni Madaris in Khyber Pakhtunkhwa |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 12.559 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
February - 2021 |
No Image | ||
154 (OG) |
190075-Construction & Reconstruction of Masajids, Darul Ulooms & Deeni Madaris in Khyber Pakhtunkhwa |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 12.559 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
January - 2021 |
No Image | ||
154 (OG) |
170207-Establishment of 100 Primary Schools (B&G 30:70) on need basis in Khyber Pakhtunkhwa. |
Dir Upper |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 84.762 | 0 | 0 | 0 | 0 | 0 | 0 | 84.762 | - |
- September - 2018 |
Approved. |
No Image |
1) GPS Pitaw Banda PK-91 2) GGPS Farid Khan Siasan Patrak PK-92 3) GGPS Guli Bagha Sunai Dara PK-91 4) GGPS Koto PK-91 | |||||||||||||||||||
154 (OG) |
170207-Establishment of 100 Primary Schools (B&G 30:70) on need basis in Khyber Pakhtunkhwa. |
Dir Upper |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 84.762 | 0 | 0 | 0 | 0 | 0 | 0 | 84.762 | - |
- July - 2018 |
Approved. |
No Image |
1) GPS Pitaw Banda PK-91 2) GGPS Farid Khan Siasan Patrak PK-92 3) GGPS Guli Bagha Sunai Dara PK-91 4) GGPS Koto PK-91 | |||||||||||||||||||
154 (OG) |
170207-Establishment of 100 Primary Schools (B&G 30:70) on need basis in Khyber Pakhtunkhwa. |
Karak |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 71.604 | 3 | 0 | 0 | 0 | 0 | 3 | 68.604 | - |
4% September - 2018 |
4 units - DPC level (GPS Braga Qilla). Technical evaluation under process (GPS Fazal Khan Koroona Alwar Payan PK-41, GGPS Habib Abad Sharif Wala Latamber PK-41 and GGPS Dabli Lawagher PK-41). |
No Image |
1) GPS Braga Qilla PK-41
2) GGPS Habib Abad Sharif Wala Latamber PK-41
3) GPS Fazal Khan Koroona Alwar Payan PK-41
4) GPS Dabli Lawaghar PK-41 | |||||||||||||||||||
154 (OG) |
170207-Establishment of 100 Primary Schools (B&G 30:70) on need basis in Khyber Pakhtunkhwa. |
Karak |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 71.604 | 3 | 0 | 0 | 0 | 0 | 3 | 68.604 | - |
4% July - 2018 |
4 units - DPC level (GPS Braga Qilla). Technical evaluation under process (GPS Fazal Khan Koroona Alwar Payan PK-41, GGPS Habib Abad Sharif Wala Latamber PK-41 and GGPS Dabli Lawagher PK-41). |
No Image |
1) GPS Braga Qilla PK-41
2) GGPS Habib Abad Sharif Wala Latamber PK-41
3) GPS Fazal Khan Koroona Alwar Payan PK-41
4) GPS Dabli Lawaghar PK-41 | |||||||||||||||||||
154 (OG) |
170207-Establishment of 100 Primary Schools (B&G 30:70) on need basis in Khyber Pakhtunkhwa. |
Kohat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 17.664 | 2 | 0 | 0 | 0 | 0 | 2 | 15.664 | - |
11% September - 2018 |
Work order issued. |
No Image |
1) GPS Mehtab Banda Mehmandi Lachi PK-39 | |||||||||||||||||||
154 (OG) |
170207-Establishment of 100 Primary Schools (B&G 30:70) on need basis in Khyber Pakhtunkhwa. |
Kohat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 17.664 | 2 | 0 | 0 | 0 | 0 | 2 | 15.664 | - |
11% July - 2018 |
Work order issued. |
No Image |
1) GPS Mehtab Banda Mehmandi Lachi PK-39 | |||||||||||||||||||
154 (OG) |
190075-Construction & Reconstruction of Masajids, Darul Ulooms & Deeni Madaris in Khyber Pakhtunkhwa |
Kohistan |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 4.95 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
May - 2021 |
13 units
work order issued |
No Image | |
| |||||||||||||||||||
154 (OG) |
190075-Construction & Reconstruction of Masajids, Darul Ulooms & Deeni Madaris in Khyber Pakhtunkhwa |
Kohistan |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 4.95 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
April - 2021 |
13 units
work order issued |
No Image | |
| |||||||||||||||||||
Pages : 1 2 3 |