Code | Scheme Name | District of Location | Commen. | Comple. | PC - I Status | Status Date |
Where Pending |
Cost Orignnal / Revised |
PFY Expenditure | Original Alloc. |
Revised Alloc. |
Releases | Expenditure | Acc. Expenditure | Throw Forward | Targets | Achievements | Remarks | Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1759 (OG) |
170587-Upgradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 84.84 | 0 | 0 | 0 | 0 | 0 | 0 | 84.84 | - |
- October - 2020 |
Work in progress
Demand Rs. 5 M |
No Image |
1759 (OG) |
170587-Upgradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 84.84 | 0 | 0 | 0 | 0 | 0 | 0 | 84.84 | - |
- September - 2020 |
Work in progress
Demand Rs. 5 M |
No Image |
1759 (OG) |
170587-Upgradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 84.84 | 0 | 0 | 0 | 0 | 0 | 0 | 84.84 | - |
- August - 2020 |
Work in progress
Demand Rs. 5 M |
No Image |
1759 (OG) |
170587-Upgradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 84.84 | 0 | 0 | 0 | 0 | 0 | 0 | 84.84 | - |
- July - 2020 |
Work in progress |
No Image |
1759 (OG) |
170587-Upgradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 89.81 | 11.41 | 3.279 | 3.279 | 3.279 | 1 | 12.41 | 75.121 | 16% |
14% March - 2021 |
Work in progress
Demand Rs. 5 M |
No Image |
1 Kaseel Batoini via Sareela 3 KM
2 Makool Danan to Kagian Danna road, Tatreela road, Kholianroad and BT of Chanmari Tajwal road
3 Barbeen (Boi) AJK (Gotha Suspension Bridge) link road 0.5 KM | |||||||||||||||||||
1759 (OG) |
170587-Upgradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 89.81 | 11.41 | 3.279 | 3.279 | 3.279 | 1 | 12.41 | 75.121 | 16% |
14% February - 2021 |
Work in progress
Demand Rs. 5 M |
No Image |
1 Kaseel Batoini via Sareela 3 KM
2 Makool Danan to Kagian Danna road, Tatreela road, Kholianroad and BT of Chanmari Tajwal road
3 Barbeen (Boi) AJK (Gotha Suspension Bridge) link road 0.5 KM | |||||||||||||||||||
1759 (OG) |
170587-Upgradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 84.84 | 0 | 1 | 1 | 1 | 1 | 1 | 83.84 | 1% |
1% January - 2021 |
Work in progress
Demand Rs. 5 M |
No Image |
1 Kaseel Batoini via Sareela 3 KM
2 Makool Danan to Kagian Danna road, Tatreela road, Kholianroad and BT of Chanmari Tajwal road
3 Barbeen (Boi) AJK (Gotha Suspension Bridge) link road 0.5 KM | |||||||||||||||||||
1759 (OG) |
170587-Upgradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa |
Abbottabad HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 89.81 | 11.41 | 3.279 | 3.279 | 3.279 | 3.279 | 14.689 | 75.121 | 16% |
16% May - 2021 |
Work in progress
Demand Rs. 5 M |
No Image |
1 Kaseel Batoini via Sareela 3 KM
2 Makool Danan to Kagian Danna road, Tatreela road, Kholianroad and BT of Chanmari Tajwal road
3 Barbeen (Boi) AJK (Gotha Suspension Bridge) link road 0.5 KM | |||||||||||||||||||
1759 (OG) |
170587-Upgradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa |
Abbottabad HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 89.81 | 11.41 | 3.279 | 3.279 | 3.279 | 3.279 | 14.689 | 75.121 | 16% |
16% April - 2021 |
Work in progress
Demand Rs. 5 M |
No Image |
1 Kaseel Batoini via Sareela 3 KM
2 Makool Danan to Kagian Danna road, Tatreela road, Kholianroad and BT of Chanmari Tajwal road
3 Barbeen (Boi) AJK (Gotha Suspension Bridge) link road 0.5 KM | |||||||||||||||||||
1759 (OG) |
170587-Upgradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 135.48 | 0 | 0 | 0 | 1 | 1 | 1 | 135.48 | - |
1% December - 2020 |
Work started.
Demand Rs. 30 M |
No Image |
Marwat Canal to Ghazi House PK-72 Bannu | |||||||||||||||||||
1759 (OG) |
170587-Upgradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 135.48 | 0 | 0 | 0 | 1 | 1 | 1 | 135.48 | - |
1% December - 2020 |
Work started.
Demand Rs. 30 M |
No Image |
Marwat Canal to Ghazi House PK-72 Bannu | |||||||||||||||||||
1759 (OG) |
170587-Upgradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 135.48 | 0 | 0 | 0 | 0 | 0 | 0 | 135.48 | - |
- October - 2020 |
Work started.
Demand Rs. 30 M |
No Image |
Marwat Canal to Ghazi House PK-72 Bannu | |||||||||||||||||||
1759 (OG) |
170587-Upgradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 135.48 | 0 | 0 | 0 | 0 | 0 | 0 | 135.48 | - |
- September - 2020 |
Work started.
Demand Rs. 30 M |
No Image |
Marwat Canal to Ghazi House PK-72 Bannu | |||||||||||||||||||
1759 (OG) |
170587-Upgradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 135.48 | 0 | 0 | 0 | 0 | 0 | 0 | 135.48 | - |
- August - 2020 |
Work started.
Demand Rs. 30 M |
No Image |
Marwat Canal to Ghazi House PK-72 Bannu | |||||||||||||||||||
1759 (OG) |
170587-Upgradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 135.48 | 0 | 0 | 0 | 0 | 0 | 0 | 135.48 | - |
- July - 2020 |
Work started. |
No Image |
Marwat Canal to Ghazi House PK-72 Bannu | |||||||||||||||||||
1759 (OG) |
170587-Upgradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 18.609 | 38.2 | 0 | 0 | 1 | 1 | 39.2 | 0 | - |
100% March - 2021 |
Work started.
Demand Rs. 30 M |
No Image |
i. Kotka Ibrahim Khel via Samanda Kala 1.4 KM
ii. Kotka Purana Shikhan via Sarwarngi Aada 1.4 KM
iii. Samdri road
iv. Kotka Musa Khan Yark Khel Mandan road 0.33 KM | |||||||||||||||||||
1759 (OG) |
170587-Upgradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 18.609 | 38.2 | 0 | 0 | 1 | 1 | 39.2 | 0 | - |
100% February - 2021 |
Work started.
Demand Rs. 30 M |
No Image |
i. Kotka Ibrahim Khel via Samanda Kala 1.4 KM
ii. Kotka Purana Shikhan via Sarwarngi Aada 1.4 KM
iii. Samdri road
iv. Kotka Musa Khan Yark Khel Mandan road 0.33 KM | |||||||||||||||||||
1759 (OG) |
170587-Upgradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 135.48 | 0 | 0 | 0 | 1 | 1 | 1 | 135.48 | - |
1% January - 2021 |
Work started.
Demand Rs. 30 M |
No Image |
Marwat Canal to Ghazi House PK-72 Bannu | |||||||||||||||||||
1759 (OG) |
170587-Upgradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa |
Bannu HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 18.609 | 38.2 | 12 | 12 | 12 | 12 | 50.2 | 0 | 100% |
100% May - 2021 |
Work started.
Demand Rs. 30 M |
No Image |
i. Kotka Ibrahim Khel via Samanda Kala 1.4 KM
ii. Kotka Purana Shikhan via Sarwarngi Aada 1.4 KM
iii. Samdri road
iv. Kotka Musa Khan Yark Khel Mandan road 0.33 KM | |||||||||||||||||||
1759 (OG) |
170587-Upgradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa |
Bannu HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 18.609 | 38.2 | 12 | 12 | 12 | 12 | 50.2 | 0 | 100% |
100% April - 2021 |
Work started.
Demand Rs. 30 M |
No Image |
i. Kotka Ibrahim Khel via Samanda Kala 1.4 KM
ii. Kotka Purana Shikhan via Sarwarngi Aada 1.4 KM
iii. Samdri road
iv. Kotka Musa Khan Yark Khel Mandan road 0.33 KM | |||||||||||||||||||
1759 (OG) |
170587-Upgradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 209.5 | 0 | 30.072 | 30.072 | 30.072 | 26.781 | 26.781 | 179.428 | 14% |
13% December - 2020 |
Work in progress.
Demand Rs. 30 M |
No Image |
Buner | |||||||||||||||||||
1759 (OG) |
170587-Upgradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 209.5 | 0 | 30.072 | 30.072 | 30.072 | 26.781 | 26.781 | 179.428 | 14% |
13% December - 2020 |
Work in progress.
Demand Rs. 30 M |
No Image |
Buner | |||||||||||||||||||
1759 (OG) |
170587-Upgradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 209.5 | 0 | 1 | 1 | 1 | 1 | 1 | 208.5 | 0% |
0% October - 2020 |
Work in progress.
Demand Rs. 30 M |
No Image |
Buner | |||||||||||||||||||
1759 (OG) |
170587-Upgradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 209.5 | 0 | 1 | 1 | 1 | 1 | 1 | 208.5 | 0% |
0% September - 2020 |
Work in progress.
Demand Rs. 30 M |
No Image |
Buner | |||||||||||||||||||
1759 (OG) |
170587-Upgradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 209.5 | 0 | 1 | 1 | 1 | 0 | 0 | 208.5 | 0% |
- August - 2020 |
Work in progress.
Demand Rs. 30 M |
No Image |
Buner | |||||||||||||||||||
1759 (OG) |
170587-Upgradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 209.5 | 0 | 0 | 0 | 0 | 0 | 0 | 209.5 | - |
- July - 2020 |
Work in progress.
Demand Rs. 30 M |
No Image |
Buner | |||||||||||||||||||
1759 (OG) |
170587-Upgradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 209.5 | 14.937 | 32.072 | 32.072 | 32.072 | 32.072 | 47.009 | 162.491 | 22% |
22% March - 2021 |
Work in progress.
Demand Rs. 30 M |
No Image |
1. Construction /Improvement/Widening of Road from Char to Elum (PK-20) District Buner
2.
i. Construction , Improvement , Up-gradation, Strengthening and Blacktopping of Tera to Pyaz road 02-KM PK-21
ii. Construction , Improvement , Up-gradation, Strengthening and Blacktopping of Parshalay Road 1.70-KM PK-21
iii. Construction , Improvement , Up-gradation, Strengthening and Blacktopping of Ladwan to Dagrai road 01-KM PK-21
| |||||||||||||||||||
1759 (OG) |
170587-Upgradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 209.5 | 14.937 | 32.072 | 32.072 | 32.072 | 32.072 | 47.009 | 162.491 | 22% |
22% February - 2021 |
Work in progress.
Demand Rs. 30 M |
No Image |
1. Construction /Improvement/Widening of Road from Char to Elum (PK-20) District Buner
2.
i. Construction , Improvement , Up-gradation, Strengthening and Blacktopping of Tera to Pyaz road 02-KM PK-21
ii. Construction , Improvement , Up-gradation, Strengthening and Blacktopping of Parshalay Road 1.70-KM PK-21
iii. Construction , Improvement , Up-gradation, Strengthening and Blacktopping of Ladwan to Dagrai road 01-KM PK-21
| |||||||||||||||||||
1759 (OG) |
170587-Upgradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 209.5 | 0 | 32.072 | 32.072 | 32.072 | 30.072 | 30.072 | 177.428 | 15% |
14% January - 2021 |
Work in progress.
Demand Rs. 30 M |
No Image |
Buner | |||||||||||||||||||
1759 (OG) |
170587-Upgradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa |
Buner HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 209.5 | 14.937 | 81.072 | 81.072 | 81.072 | 51.308 | 66.245 | 113.491 | 46% |
32% May - 2021 |
Work in progress.
Revised Dce submiotted to SOR |
No Image |
1. Construction /Improvement/Widening of Road from Char to Elum (PK-20) District Buner
2.
i. Construction , Improvement , Up-gradation, Strengthening and Blacktopping of Tera to Pyaz road 02-KM PK-21
ii. Construction , Improvement , Up-gradation, Strengthening and Blacktopping of Parshalay Road 1.70-KM PK-21
iii. Construction , Improvement , Up-gradation, Strengthening and Blacktopping of Ladwan to Dagrai road 01-KM PK-21
| |||||||||||||||||||
1759 (OG) |
170587-Upgradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa |
Buner HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 209.5 | 14.937 | 81.072 | 81.072 | 81.072 | 51.308 | 66.245 | 113.491 | 46% |
32% April - 2021 |
Work in progress.
Revised Dce submiotted to SOR |
No Image |
1. Construction /Improvement/Widening of Road from Char to Elum (PK-20) District Buner
2.
i. Construction , Improvement , Up-gradation, Strengthening and Blacktopping of Tera to Pyaz road 02-KM PK-21
ii. Construction , Improvement , Up-gradation, Strengthening and Blacktopping of Parshalay Road 1.70-KM PK-21
iii. Construction , Improvement , Up-gradation, Strengthening and Blacktopping of Ladwan to Dagrai road 01-KM PK-21
| |||||||||||||||||||
1759 (OG) |
170587-Upgradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa |
Chitral Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 35.521 | 0 | 3.53 | 3.53 | 3.53 | 0 | 0 | 31.991 | 10% |
- December - 2020 |
bridge work completed, work on approach road under progress. |
No Image |
RCC bridgeMori PK-89 | |||||||||||||||||||
1759 (OG) |
170587-Upgradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa |
Chitral Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 35.521 | 0 | 3.53 | 3.53 | 3.53 | 0 | 0 | 31.991 | 10% |
- December - 2020 |
bridge work completed, work on approach road under progress. |
No Image |
RCC bridgeMori PK-89 | |||||||||||||||||||
1759 (OG) |
170587-Upgradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa |
Chitral Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 35.521 | 0 | 0 | 0 | 0 | 0 | 0 | 35.521 | - |
- October - 2020 |
bridge work completed, work on approach road under progress. |
No Image |
RCC bridgeMori PK-89 | |||||||||||||||||||
1759 (OG) |
170587-Upgradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa |
Chitral Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 35.521 | 0 | 0 | 0 | 0 | 0 | 0 | 35.521 | - |
- September - 2020 |
bridge work completed, work on approach road under progress. |
No Image |
RCC bridgeMori PK-89 | |||||||||||||||||||
1759 (OG) |
170587-Upgradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa |
Chitral Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 35.521 | 0 | 0 | 0 | 0 | 0 | 0 | 35.521 | - |
- August - 2020 |
Work in progress.
Demand Rs. 10 M |
No Image |
RCC bridgeMori PK-89 | |||||||||||||||||||
1759 (OG) |
170587-Upgradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa |
Chitral Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 35.521 | 0 | 0 | 0 | 0 | 0 | 0 | 35.521 | - |
- July - 2020 |
Work in progress.
Demand Rs. 10 M |
No Image |
RCC bridgeMori PK-89 | |||||||||||||||||||
1759 (OG) |
170587-Upgradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa |
Chitral Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 35.521 | 25.8 | 4.53 | 4.53 | 4.53 | 1.57 | 27.37 | 5.191 | 85% |
77% May - 2021 |
bridge work completed, work on approach road under progress. |
No Image |
RCC bridge Mori PK-89 | |||||||||||||||||||
1759 (OG) |
170587-Upgradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa |
Chitral Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 35.521 | 25.8 | 4.53 | 4.53 | 4.53 | 1.57 | 27.37 | 5.191 | 85% |
77% April - 2021 |
bridge work completed, work on approach road under progress. |
No Image |
RCC bridge Mori PK-89 | |||||||||||||||||||
1759 (OG) |
170587-Upgradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa |
Chitral Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 35.521 | 25.8 | 3.53 | 3.53 | 3.53 | 1.57 | 27.37 | 6.191 | 83% |
77% March - 2021 |
bridge work completed, work on approach road under progress. |
No Image |
RCC bridgeMori PK-89 | |||||||||||||||||||
1759 (OG) |
170587-Upgradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa |
Chitral Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 35.521 | 25.8 | 3.53 | 3.53 | 3.53 | 1.57 | 27.37 | 6.191 | 83% |
77% February - 2021 |
bridge work completed, work on approach road under progress. |
No Image |
RCC bridgeMori PK-89 | |||||||||||||||||||
1759 (OG) |
170587-Upgradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa |
Chitral Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 35.521 | 0 | 3.53 | 3.53 | 3.53 | 1.57 | 1.57 | 31.991 | 10% |
4% January - 2021 |
bridge work completed, work on approach road under progress. |
No Image |
RCC bridgeMori PK-89 | |||||||||||||||||||
1759 (OG) |
170587-Upgradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa |
D.I.Khan HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 30 | 0 | 1 | 1 | 1 | 1 | 1 | 29 | 3% |
3% December - 2020 |
Length 2.5 km - E/W, Sub base,B/C & Asphalt completed.
Liability 18 m |
No Image |
Construction of Various Road in Pk-96 D.I Kha | |||||||||||||||||||
1759 (OG) |
170587-Upgradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa |
D.I.Khan HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 30 | 0 | 1 | 1 | 1 | 1 | 1 | 29 | 3% |
3% December - 2020 |
Length 2.5 km - E/W, Sub base,B/C & Asphalt completed.
Liability 18 m |
No Image |
Construction of Various Road in Pk-96 D.I Kha | |||||||||||||||||||
1759 (OG) |
170587-Upgradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa |
D.I.Khan HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 30 | 0 | 1 | 1 | 1 | 0 | 0 | 29 | 3% |
- October - 2020 |
Length 2.5 km - E/W, Sub base,B/C & Asphalt completed.
Liability 18 m |
No Image |
Construction of Various Road in Pk-96 D.I Kha | |||||||||||||||||||
1759 (OG) |
170587-Upgradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa |
D.I.Khan HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 30 | 0 | 1 | 1 | 1 | 0 | 0 | 29 | 3% |
- September - 2020 |
Length 2.5 km - E/W, Sub base,B/C & Asphalt completed.
Liability 18 m |
No Image |
Construction of Various Road in Pk-96 D.I Kha | |||||||||||||||||||
1759 (OG) |
170587-Upgradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa |
D.I.Khan HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 30 | 0 | 1 | 1 | 1 | 0 | 0 | 29 | 3% |
- August - 2020 |
Length 2.5 km - WBM in progress.
Liability 18 m |
No Image |
Construction of Various Road in Pk-96 D.I Kha | |||||||||||||||||||
1759 (OG) |
170587-Upgradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa |
D.I.Khan HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 30 | 0 | 0 | 0 | 0 | 0 | 0 | 30 | - |
- July - 2020 |
Length 2.5 km - WBM in progress.
Liability 18 m |
No Image |
Construction of Various Road in Pk-96 D.I Kha | |||||||||||||||||||
1759 (OG) |
170587-Upgradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa |
D.I.Khan HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 30 | 0 | 1 | 1 | 1 | 1 | 1 | 29 | 3% |
3% May - 2021 |
Length 2.5 km - Physically completed.
Liability 7 M |
No Image |
Construction of Various Road in Pk-96 D.I Kha | |||||||||||||||||||
1759 (OG) |
170587-Upgradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa |
D.I.Khan HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 30 | 0 | 1 | 1 | 1 | 1 | 1 | 29 | 3% |
3% April - 2021 |
Length 2.5 km - Physically completed.
Liability 7 M |
No Image |
Construction of Various Road in Pk-96 D.I Kha | |||||||||||||||||||