Code | Scheme Name | District of Location | Commen. | Comple. | PC - I Status | Status Date |
Where Pending |
Cost Orignnal / Revised |
PFY Expenditure | Original Alloc. |
Revised Alloc. |
Releases | Expenditure | Acc. Expenditure | Throw Forward | Targets | Achievements | Remarks | Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
445 (OG) |
170006-Provision of additional/missing facilities in Govt. Colleges of Khyber Pakhtunkhwa (Phase-II). |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 153.487 | 0 | 48 | 48 | 48 | 46 | 46 | 105.487 | 31% |
30% December - 2019 |
Work in progress on 4/5 units . 1 completed. |
No Image |
1) GPGC NO. 1 Abbottabad (Academic Block, Computer block) 2) GGPGC NO. 1 Abbottabad (Admin Block) 3) GGDC Qalandarabad (BW) 4) GPGC Mandian (BW) 5) GGDC Malikpura Abbottabad (Academic Block, BW, Water Supply) | |||||||||||||||||||
445 (OG) |
170006-Provision of additional/missing facilities in Govt. Colleges of Khyber Pakhtunkhwa (Phase-II). |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 153.487 | 0 | 39 | 39 | 39 | 22.025 | 22.025 | 114.487 | 25% |
14% November - 2019 |
Work in progress on 4/5 units . 1 completed. |
No Image |
1) GPGC NO. 1 Abbottabad (Academic Block, Computer block) 2) GGPGC NO. 1 Abbottabad (Admin Block) 3) GGDC Qalandarabad (BW) 4) GPGC Mandian (BW) 5) GGDC Malikpura Abbottabad (Academic Block, BW, Water Supply) | |||||||||||||||||||
445 (OG) |
170006-Provision of additional/missing facilities in Govt. Colleges of Khyber Pakhtunkhwa (Phase-II). |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 153.487 | 0 | 39 | 39 | 39 | 22.025 | 22.025 | 114.487 | 25% |
14% October - 2019 |
Work in progress on 4/5 units . 1 completed. |
No Image |
1) GPGC NO. 1 Abbottabad (Academic Block, Computer block) 2) GGPGC NO. 1 Abbottabad (Admin Block) 3) GGDC Qalandarabad (BW) 4) GPGC Mandian (BW) 5) GGDC Malikpura Abbottabad (Academic Block, BW, Water Supply) | |||||||||||||||||||
445 (OG) |
170006-Provision of additional/missing facilities in Govt. Colleges of Khyber Pakhtunkhwa (Phase-II). |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 153.487 | 0 | 0 | 0 | 0 | 0 | 0 | 153.487 | - |
- September - 2019 |
Work order issued (5 Units) |
No Image |
1) GPGC NO. 1 Abbottabad (Academic Block, Computer block) 2) GGPGC NO. 1 Abbottabad (Admin Block) 3) GGDC Qalandarabad (BW) 4) GPGC Mandian (BW) 5) GGDC Malikpura Abbottabad (Academic Block, BW, Water Supply) | |||||||||||||||||||
445 (OG) |
170006-Provision of additional/missing facilities in Govt. Colleges of Khyber Pakhtunkhwa (Phase-II). |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 153.487 | 0 | 0 | 0 | 0 | 0 | 0 | 153.487 | - |
- August - 2019 |
Work order issued (5 Units) |
No Image |
1) GPGC NO. 1 Abbottabad (Academic Block, Computer block) 2) GGPGC NO. 1 Abbottabad (Admin Block) 3) GGDC Qalandarabad (BW) 4) GPGC Mandian (BW) 5) GGDC Malikpura Abbottabad (Academic Block, BW, Water Supply) | |||||||||||||||||||
445 (OG) |
170006-Provision of additional/missing facilities in Govt. Colleges of Khyber Pakhtunkhwa (Phase-II). |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 153.487 | 0 | 49 | 49 | 49 | 48.909 | 48.909 | 104.487 | 32% |
32% May - 2020 |
Work in progress on 4/5 units . 1 completed. |
No Image |
1) GPGC NO. 1 Abbottabad (Academic Block, Computer block) 2) GGPGC NO. 1 Abbottabad (Admin Block) 3) GGDC Qalandarabad (BW) 4) GPGC Mandian (BW) 5) GGDC Malikpura Abbottabad (Academic Block, BW, Water Supply) | |||||||||||||||||||
445 (OG) |
170006-Provision of additional/missing facilities in Govt. Colleges of Khyber Pakhtunkhwa (Phase-II). |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 153.487 | 0 | 49 | 49 | 49 | 48.909 | 48.909 | 104.487 | 32% |
32% April - 2020 |
Work in progress on 4/5 units . 1 completed. |
No Image |
1) GPGC NO. 1 Abbottabad (Academic Block, Computer block) 2) GGPGC NO. 1 Abbottabad (Admin Block) 3) GGDC Qalandarabad (BW) 4) GPGC Mandian (BW) 5) GGDC Malikpura Abbottabad (Academic Block, BW, Water Supply) | |||||||||||||||||||
445 (OG) |
170006-Provision of additional/missing facilities in Govt. Colleges of Khyber Pakhtunkhwa (Phase-II). |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 153.487 | 0 | 49 | 49 | 49 | 48.909 | 48.909 | 104.487 | 32% |
32% March - 2020 |
Work in progress on 4/5 units . 1 completed. |
No Image |
1) GPGC NO. 1 Abbottabad (Academic Block, Computer block) 2) GGPGC NO. 1 Abbottabad (Admin Block) 3) GGDC Qalandarabad (BW) 4) GPGC Mandian (BW) 5) GGDC Malikpura Abbottabad (Academic Block, BW, Water Supply) | |||||||||||||||||||
445 (OG) |
170006-Provision of additional/missing facilities in Govt. Colleges of Khyber Pakhtunkhwa (Phase-II). |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 153.487 | 0 | 49 | 49 | 49 | 48.909 | 48.909 | 104.487 | 32% |
32% February - 2020 |
Work in progress on 4/5 units . 1 completed. |
No Image |
1) GPGC NO. 1 Abbottabad (Academic Block, Computer block) 2) GGPGC NO. 1 Abbottabad (Admin Block) 3) GGDC Qalandarabad (BW) 4) GPGC Mandian (BW) 5) GGDC Malikpura Abbottabad (Academic Block, BW, Water Supply) | |||||||||||||||||||
445 (OG) |
170006-Provision of additional/missing facilities in Govt. Colleges of Khyber Pakhtunkhwa (Phase-II). |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 153.487 | 0 | 49 | 49 | 49 | 48.909 | 48.909 | 104.487 | 32% |
32% January - 2020 |
Work in progress on 4/5 units . 1 completed. |
No Image |
1) GPGC NO. 1 Abbottabad (Academic Block, Computer block) 2) GGPGC NO. 1 Abbottabad (Admin Block) 3) GGDC Qalandarabad (BW) 4) GPGC Mandian (BW) 5) GGDC Malikpura Abbottabad (Academic Block, BW, Water Supply) | |||||||||||||||||||
445 (OG) |
170006-Provision of additional/missing facilities in Govt. Colleges of Khyber Pakhtunkhwa (Phase-II). |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 77.596 | 0 | 0 | 0 | 0 | 0 | 0 | 77.596 | - |
- December - 2019 |
3 Units - 1- Work order issued. 2 work in progress. |
No Image |
445 (OG) |
170006-Provision of additional/missing facilities in Govt. Colleges of Khyber Pakhtunkhwa (Phase-II). |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 77.596 | 0 | 0 | 0 | 0 | 0 | 0 | 77.596 | - |
- November - 2019 |
Work order issued. |
No Image |
445 (OG) |
170006-Provision of additional/missing facilities in Govt. Colleges of Khyber Pakhtunkhwa (Phase-II). |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 77.596 | 0 | 0 | 0 | 0 | 0 | 0 | 77.596 | - |
- October - 2019 |
Work order issued. |
No Image |
445 (OG) |
170006-Provision of additional/missing facilities in Govt. Colleges of Khyber Pakhtunkhwa (Phase-II). |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 77.596 | 0 | 15 | 15 | 15 | 4.014 | 4.014 | 62.596 | 19% |
5% May - 2020 |
3 Units - 1- Work order issued. 2 work in progress. |
No Image |
445 (OG) |
170006-Provision of additional/missing facilities in Govt. Colleges of Khyber Pakhtunkhwa (Phase-II). |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 77.596 | 0 | 15 | 15 | 15 | 4.014 | 4.014 | 62.596 | 19% |
5% April - 2020 |
3 Units - 1- Work order issued. 2 work in progress. |
No Image |
445 (OG) |
170006-Provision of additional/missing facilities in Govt. Colleges of Khyber Pakhtunkhwa (Phase-II). |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 77.596 | 0 | 15 | 15 | 15 | 4.014 | 4.014 | 62.596 | 19% |
5% March - 2020 |
3 Units - 1- Work order issued. 2 work in progress. |
No Image |
445 (OG) |
170006-Provision of additional/missing facilities in Govt. Colleges of Khyber Pakhtunkhwa (Phase-II). |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 77.596 | 0 | 15 | 15 | 15 | 4.014 | 4.014 | 62.596 | 19% |
5% February - 2020 |
3 Units - 1- Work order issued. 2 work in progress. |
No Image |
445 (OG) |
170006-Provision of additional/missing facilities in Govt. Colleges of Khyber Pakhtunkhwa (Phase-II). |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 77.596 | 0 | 15 | 15 | 15 | 4.014 | 4.014 | 62.596 | 19% |
5% January - 2020 |
3 Units - 1- Work order issued. 2 work in progress. |
No Image |
445 (OG) |
170006-Provision of additional/missing facilities in Govt. Colleges of Khyber Pakhtunkhwa (Phase-II). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 90 | 0 | 5 | 5 | 5 | 5 | 5 | 85 | 6% |
6% December - 2019 |
Excavation for foundation in progress. |
No Image |
GPGC Charsadda | |||||||||||||||||||
445 (OG) |
170006-Provision of additional/missing facilities in Govt. Colleges of Khyber Pakhtunkhwa (Phase-II). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 90 | 0 | 5 | 5 | 5 | 5 | 5 | 85 | 6% |
6% November - 2019 |
Excavation for foundation in progress. |
No Image |
GPGC Charsadda | |||||||||||||||||||
445 (OG) |
170006-Provision of additional/missing facilities in Govt. Colleges of Khyber Pakhtunkhwa (Phase-II). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 90 | 0 | 0 | 0 | 0 | 0 | 0 | 90 | - |
- October - 2019 |
Excavation for foundation in progress. |
No Image |
GPGC Charsadda | |||||||||||||||||||
445 (OG) |
170006-Provision of additional/missing facilities in Govt. Colleges of Khyber Pakhtunkhwa (Phase-II). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 90 | 0 | 30 | 30 | 30 | 20.94 | 20.94 | 60 | 33% |
23% May - 2020 |
Excavation for foundation in progress. |
No Image |
GPGC Charsadda | |||||||||||||||||||
445 (OG) |
170006-Provision of additional/missing facilities in Govt. Colleges of Khyber Pakhtunkhwa (Phase-II). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 90 | 0 | 30 | 30 | 30 | 17.808 | 17.808 | 60 | 33% |
20% April - 2020 |
Excavation for foundation in progress. |
No Image |
GPGC Charsadda | |||||||||||||||||||
445 (OG) |
170006-Provision of additional/missing facilities in Govt. Colleges of Khyber Pakhtunkhwa (Phase-II). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 90 | 0 | 30 | 30 | 30 | 17.808 | 17.808 | 60 | 33% |
20% March - 2020 |
Excavation for foundation in progress. |
No Image |
GPGC Charsadda | |||||||||||||||||||
445 (OG) |
170006-Provision of additional/missing facilities in Govt. Colleges of Khyber Pakhtunkhwa (Phase-II). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 90 | 0 | 30 | 30 | 30 | 17.808 | 17.808 | 60 | 33% |
20% February - 2020 |
Excavation for foundation in progress. |
No Image |
GPGC Charsadda | |||||||||||||||||||
445 (OG) |
170006-Provision of additional/missing facilities in Govt. Colleges of Khyber Pakhtunkhwa (Phase-II). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 90 | 0 | 30 | 30 | 30 | 13.286 | 13.286 | 60 | 33% |
15% January - 2020 |
Excavation for foundation in progress. |
No Image |
GPGC Charsadda | |||||||||||||||||||
445 (OG) |
170006-Provision of additional/missing facilities in Govt. Colleges of Khyber Pakhtunkhwa (Phase-II). |
D.I.Khan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 126.323 | 0 | 17.5 | 17.5 | 17.5 | 0 | 0 | 108.823 | 14% |
- December - 2019 |
Work order issued. |
No Image |
1) GDC No.2 DI.Khan
2) BS Block in GDC No.1 DI.Khan and Science Block in GGDC No.1 DI.Khan
3) GDC Paharpur
4) GDC Paniala | |||||||||||||||||||
445 (OG) |
170006-Provision of additional/missing facilities in Govt. Colleges of Khyber Pakhtunkhwa (Phase-II). |
D.I.Khan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 126.323 | 0 | 17.5 | 17.5 | 17.5 | 0 | 0 | 108.823 | 14% |
- November - 2019 |
Work order issued. |
No Image |
1) GDC No.2 DI.Khan
2) BS Block in GDC No.1 DI.Khan and Science Block in GGDC No.1 DI.Khan
3) GDC Paharpur
4) GDC Paniala | |||||||||||||||||||
445 (OG) |
170006-Provision of additional/missing facilities in Govt. Colleges of Khyber Pakhtunkhwa (Phase-II). |
D.I.Khan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 126.323 | 0 | 17.5 | 17.5 | 17.5 | 0 | 0 | 108.823 | 14% |
- October - 2019 |
Work order issued. |
No Image |
1) GDC No.2 DI.Khan
2) BS Block in GDC No.1 DI.Khan and Science Block in GGDC No.1 DI.Khan
3) GDC Paharpur
4) GDC Paniala | |||||||||||||||||||
445 (OG) |
170006-Provision of additional/missing facilities in Govt. Colleges of Khyber Pakhtunkhwa (Phase-II). |
D.I.Khan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- September - 2019 |
Approved on 20-03-2019. AA awaited. |
No Image |
1) GDC No.2 DI.Khan
2) BS Block in GDC No.1 DI.Khan and Science Block in GGDC No.1 DI.Khan
3) GDC Paharpur
4) GDC Paniala | |||||||||||||||||||
445 (OG) |
170006-Provision of additional/missing facilities in Govt. Colleges of Khyber Pakhtunkhwa (Phase-II). |
D.I.Khan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- August - 2019 |
Approved on 20-03-2019. AA awaited. |
No Image |
1) GDC No.2 DI.Khan
2) BS Block in GDC No.1 DI.Khan and Science Block in GGDC No.1 DI.Khan
3) GDC Paharpur
4) GDC Paniala | |||||||||||||||||||
445 (OG) |
170006-Provision of additional/missing facilities in Govt. Colleges of Khyber Pakhtunkhwa (Phase-II). |
D.I.Khan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 126.323 | 0 | 17.5 | 17.5 | 17.5 | 5 | 5 | 108.823 | 14% |
4% May - 2020 |
1- Unit work in progress.
1- Work order issued. |
No Image |
1) GDC No.2 DI.Khan
2) BS Block in GDC No.1 DI.Khan and Science Block in GGDC No.1 DI.Khan
3) GDC Paharpur
4) GDC Paniala | |||||||||||||||||||
445 (OG) |
170006-Provision of additional/missing facilities in Govt. Colleges of Khyber Pakhtunkhwa (Phase-II). |
D.I.Khan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 126.323 | 0 | 17.5 | 17.5 | 17.5 | 5 | 5 | 108.823 | 14% |
4% April - 2020 |
1- Unit work in progress.
1- Work order issued. |
No Image |
1) GDC No.2 DI.Khan
2) BS Block in GDC No.1 DI.Khan and Science Block in GGDC No.1 DI.Khan
3) GDC Paharpur
4) GDC Paniala | |||||||||||||||||||
445 (OG) |
170006-Provision of additional/missing facilities in Govt. Colleges of Khyber Pakhtunkhwa (Phase-II). |
D.I.Khan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 126.323 | 0 | 17.5 | 17.5 | 17.5 | 5 | 5 | 108.823 | 14% |
4% March - 2020 |
1- Unit work in progress.
1- Work order issued. |
No Image |
1) GDC No.2 DI.Khan
2) BS Block in GDC No.1 DI.Khan and Science Block in GGDC No.1 DI.Khan
3) GDC Paharpur
4) GDC Paniala | |||||||||||||||||||
445 (OG) |
170006-Provision of additional/missing facilities in Govt. Colleges of Khyber Pakhtunkhwa (Phase-II). |
D.I.Khan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 126.323 | 0 | 17.5 | 17.5 | 17.5 | 5 | 5 | 108.823 | 14% |
4% February - 2020 |
1- Unit work in progress.
1- Work order issued. |
No Image |
1) GDC No.2 DI.Khan
2) BS Block in GDC No.1 DI.Khan and Science Block in GGDC No.1 DI.Khan
3) GDC Paharpur
4) GDC Paniala | |||||||||||||||||||
445 (OG) |
170006-Provision of additional/missing facilities in Govt. Colleges of Khyber Pakhtunkhwa (Phase-II). |
D.I.Khan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 126.323 | 0 | 17.5 | 17.5 | 17.5 | 0 | 0 | 108.823 | 14% |
- January - 2020 |
1- Unit work in progress.
1- Work order issued. |
No Image |
1) GDC No.2 DI.Khan
2) BS Block in GDC No.1 DI.Khan and Science Block in GGDC No.1 DI.Khan
3) GDC Paharpur
4) GDC Paniala | |||||||||||||||||||
445 (OG) |
170006-Provision of additional/missing facilities in Govt. Colleges of Khyber Pakhtunkhwa (Phase-II). |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 65 | 0 | 0 | 0 | 0 | 0 | 0 | 65 | - |
- December - 2019 |
Tender approval under process. |
No Image |
445 (OG) |
170006-Provision of additional/missing facilities in Govt. Colleges of Khyber Pakhtunkhwa (Phase-II). |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 65 | 0 | 0 | 0 | 0 | 0 | 0 | 65 | - |
- November - 2019 |
Tender approval under process. |
No Image |
445 (OG) |
170006-Provision of additional/missing facilities in Govt. Colleges of Khyber Pakhtunkhwa (Phase-II). |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 65 | 0 | 0 | 0 | 0 | 0 | 0 | 65 | - |
- October - 2019 |
Tender approval under process. |
No Image |
445 (OG) |
170006-Provision of additional/missing facilities in Govt. Colleges of Khyber Pakhtunkhwa (Phase-II). |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 65 | 0 | 0 | 0 | 0 | 0 | 0 | 65 | - |
- September - 2019 |
Tender approval under process. |
No Image |
445 (OG) |
170006-Provision of additional/missing facilities in Govt. Colleges of Khyber Pakhtunkhwa (Phase-II). |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 65 | 0 | 0 | 0 | 0 | 0 | 0 | 65 | - |
- August - 2019 |
Tender approval under process. |
No Image |
445 (OG) |
170006-Provision of additional/missing facilities in Govt. Colleges of Khyber Pakhtunkhwa (Phase-II). |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 65 | 0 | 10 | 10 | 10 | 0 | 0 | 55 | 15% |
- May - 2020 |
GF SS in progress. |
No Image |
445 (OG) |
170006-Provision of additional/missing facilities in Govt. Colleges of Khyber Pakhtunkhwa (Phase-II). |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 65 | 0 | 10 | 10 | 10 | 0 | 0 | 55 | 15% |
- April - 2020 |
GF SS in progress. |
No Image |
445 (OG) |
170006-Provision of additional/missing facilities in Govt. Colleges of Khyber Pakhtunkhwa (Phase-II). |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 65 | 0 | 10 | 10 | 10 | 0 | 0 | 55 | 15% |
- March - 2020 |
GF SS in progress. |
No Image |
445 (OG) |
170006-Provision of additional/missing facilities in Govt. Colleges of Khyber Pakhtunkhwa (Phase-II). |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 65 | 0 | 10 | 10 | 10 | 0 | 0 | 55 | 15% |
- February - 2020 |
GF SS in progress. |
No Image |
445 (OG) |
170006-Provision of additional/missing facilities in Govt. Colleges of Khyber Pakhtunkhwa (Phase-II). |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 65 | 0 | 0 | 0 | 0 | 0 | 0 | 65 | - |
- January - 2020 |
Tender approval under process. |
No Image |
445 (OG) |
170006-Provision of additional/missing facilities in Govt. Colleges of Khyber Pakhtunkhwa (Phase-II). |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 82.93 | 0 | 10 | 10 | 10 | 10 | 10 | 72.93 | 12% |
12% December - 2019 |
Work in progress.
Demand Rs. 20 M.
Foundation in progress. |
No Image |
GDC Khanpur | |||||||||||||||||||
445 (OG) |
170006-Provision of additional/missing facilities in Govt. Colleges of Khyber Pakhtunkhwa (Phase-II). |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 82.93 | 0 | 0 | 0 | 0 | 0 | 0 | 82.93 | - |
- November - 2019 |
Work in progress.
Demand Rs. 20 M.
Foundation in progress. |
No Image |
GDC Khanpur | |||||||||||||||||||
445 (OG) |
170006-Provision of additional/missing facilities in Govt. Colleges of Khyber Pakhtunkhwa (Phase-II). |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 82.93 | 0 | 0 | 0 | 0 | 0 | 0 | 82.93 | - |
- October - 2019 |
Work in progress.
Demand Rs. 20 M |
No Image |
GDC Khanpur | |||||||||||||||||||
445 (OG) |
170006-Provision of additional/missing facilities in Govt. Colleges of Khyber Pakhtunkhwa (Phase-II). |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 82.93 | 0 | 0 | 0 | 0 | 0 | 0 | 82.93 | - |
- September - 2019 |
Work order issued. |
No Image |
GDC Khanpur | |||||||||||||||||||
Pages : 1 2 3 4 |