Code | Scheme Name | District of Location | Commen. | Comple. | PC - I Status | Status Date |
Where Pending |
Cost Orignnal / Revised |
PFY Expenditure | Original Alloc. |
Revised Alloc. |
Releases | Expenditure | Acc. Expenditure | Throw Forward | Targets | Achievements | Remarks | Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 38.544 | 10.007 | 7.024 | 7.024 | 7.024 | 6.025 | 16.032 | 21.513 | 44% |
42% December - 2020 |
1 unit- Work in finishing stage.
Demand 24.387 M |
No Image |
GHSS Gardai | |||||||||||||||||||
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 38.544 | 10.007 | 7.024 | 7.024 | 7.024 | 6.025 | 16.032 | 21.513 | 44% |
42% December - 2020 |
1 unit- Work in finishing stage.
Demand 24.387 M |
No Image |
GHSS Gardai | |||||||||||||||||||
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 38.544 | 10.007 | 2.586 | 2.586 | 2.586 | 2.586 | 12.593 | 25.951 | 33% |
33% October - 2020 |
Work in finishing stage.
Demand 24.387 M |
No Image |
GHSS Gardai | |||||||||||||||||||
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 38.544 | 10.007 | 2.586 | 2.586 | 2.586 | 2.586 | 12.593 | 25.951 | 33% |
33% September - 2020 |
Work in finishing stage.
Demand 24.387 M |
No Image |
GHSS Gardai | |||||||||||||||||||
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 38.544 | 10.007 | 18.179 | 18.179 | 18.179 | 10.646 | 20.653 | 10.358 | 73% |
54% May - 2021 |
1 unit- Finihsing stage
P-II Demand 8.311 M to completed the schmee |
No Image |
GHSS Gardai | |||||||||||||||||||
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 38.544 | 10.007 | 11.149 | 11.149 | 11.149 | 7.024 | 17.031 | 17.388 | 55% |
44% April - 2021 |
1 unit- Finihsing stage
P-II Demand 8.311 M to completed the schmee |
No Image |
GHSS Gardai | |||||||||||||||||||
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 38.544 | 10.007 | 11.149 | 11.149 | 11.149 | 11.149 | 21.156 | 17.388 | 55% |
55% March - 2021 |
1 unit- Finihsing stage
P-II Demand 8.311 M to completed the schmee |
No Image |
GHSS Gardai | |||||||||||||||||||
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 38.544 | 10.007 | 7.024 | 7.024 | 7.024 | 7.024 | 17.031 | 21.513 | 44% |
44% February - 2021 |
1 unit- Finihsing stage
P-II Demand 8.311 M to completed the schmee |
No Image |
GHSS Gardai | |||||||||||||||||||
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 38.544 | 10.007 | 7.024 | 7.024 | 7.024 | 6.025 | 16.032 | 21.513 | 44% |
42% January - 2021 |
1 unit- Work in finishing stage.
Demand 24.387 M |
No Image |
GHSS Gardai | |||||||||||||||||||
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
FR Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 89.39 | 0 | 221.161 | 22.161 | 5.854 | 2.647 | 2.647 | 0 | 100% |
3% December - 2020 |
New building Exavation work in progress.
Existing building repair work in progress. |
No Image |
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
FR Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 89.39 | 0 | 221.161 | 22.161 | 5.854 | 2.647 | 2.647 | 0 | 100% |
3% December - 2020 |
New building Exavation work in progress.
Existing building repair work in progress. |
No Image |
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
FR Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 89.39 | 0 | 0 | 0 | 0 | 0 | 0 | 89.39 | - |
- October - 2020 |
New building Exavation work in progress.
Existing building repair work in progress. |
No Image |
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
FR Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 89.39 | 0 | 0 | 0 | 0 | 0 | 0 | 89.39 | - |
- September - 2020 |
New building Exavation work in progress.
Existing building repair work in progress. |
No Image |
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
FR Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 89.39 | 0 | 0 | 0 | 0 | 0 | 0 | 89.39 | - |
- August - 2020 |
Work started. |
No Image |
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
FR Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 500.714 | 0 | 0 | 0 | 0 | 500.714 | 0 | - |
July - 2020 |
No Image | |
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
FR Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 89.39 | 0 | 25 | 25 | 25 | 5.427 | 5.427 | 64.39 | 28% |
6% May - 2021 |
New building Exavation work in progress.
Existing building repair work in progress. |
No Image |
GHS Nader Bodin Khel FR Bannu | |||||||||||||||||||
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
FR Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 89.39 | 0 | 25 | 25 | 25 | 5.427 | 5.427 | 64.39 | 28% |
6% April - 2021 |
New building Exavation work in progress.
Existing building repair work in progress. |
No Image |
GHS Nader Bodin Khel FR Bannu | |||||||||||||||||||
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
FR Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 89.39 | 0 | 25 | 25 | 25 | 5.427 | 5.427 | 64.39 | 28% |
6% March - 2021 |
New building Exavation work in progress.
Existing building repair work in progress. |
No Image |
GHS Nader Bodin Khel FR Bannu | |||||||||||||||||||
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
FR Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 89.39 | 0 | 5.854 | 5.854 | 5.854 | 2.647 | 2.647 | 83.536 | 7% |
3% February - 2021 |
New building Exavation work in progress.
Existing building repair work in progress. |
No Image |
GHS Nader Bodin Khel FR Bannu | |||||||||||||||||||
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
FR Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 89.39 | 0 | 25 | 25 | 25 | 2.647 | 2.647 | 64.39 | 28% |
3% January - 2021 |
New building Exavation work in progress.
Existing building repair work in progress. |
No Image |
GHS Nader Bodin Khel FR Bannu | |||||||||||||||||||
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
Khyber |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 200.23 | 37.177 | 13.78 | 13.78 | 13.78 | 11.34 | 48.517 | 149.273 | 25% |
24% December - 2020 |
5- Nos Units
Work in progress on all units. |
No Image |
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
Khyber |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 200.23 | 37.177 | 13.78 | 13.78 | 13.78 | 11.34 | 48.517 | 149.273 | 25% |
24% December - 2020 |
5- Nos Units
Work in progress on all units. |
No Image |
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
Khyber |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 200.23 | 37.177 | 2.073 | 2.073 | 2.073 | 2.073 | 39.25 | 160.98 | 20% |
20% October - 2020 |
5- Nos Units
Work in progress on all units. |
No Image |
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
Khyber |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 200.23 | 37.177 | 2.073 | 2.073 | 2.073 | 2.073 | 39.25 | 160.98 | 20% |
20% September - 2020 |
5- Nos Units
Work in progress on all units. |
No Image |
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
Khyber |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 200.23 | 37.177 | 2.586 | 2.586 | 2.586 | 1.548 | 38.725 | 160.467 | 20% |
19% August - 2020 |
5- Nos Units
Work in progress on all units. |
No Image |
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
Khyber |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 200.23 | 37.177 | 0 | 0 | 0 | 0 | 37.177 | 163.053 | - |
19% July - 2020 |
5- Nos Units
Work in progress on all units. |
No Image |
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
Khyber |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 200.23 | 37.177 | 27.78 | 27.78 | 27.78 | 27.78 | 64.957 | 135.273 | 32% |
32% May - 2021 |
05- Nos Units
1. G/F roof laid
2. Civil work in progress
3. Repiar works in progress
4. G/F Plaster work in progress
5. Finishing stage |
No Image |
1. GHSS Spin Dhand
2. GHSS Jamrud
3. GGHSS Kalanga Bara
4. GGHS Landi Kotal
5. GHSS Paindi Lalma
| |||||||||||||||||||
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
Khyber |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 200.23 | 37.177 | 27.78 | 27.78 | 27.78 | 27.78 | 64.957 | 135.273 | 32% |
32% April - 2021 |
05- Nos Units
1. G/F roof laid
2. Civil work in progress
3. Repiar works in progress
4. G/F Plaster work in progress
5. Finishing stage |
No Image |
1. GHSS Spin Dhand
2. GHSS Jamrud
3. GGHSS Kalanga Bara
4. GGHS Landi Kotal
5. GHSS Paindi Lalma
| |||||||||||||||||||
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
Khyber |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 200.23 | 37.177 | 43.78 | 43.78 | 43.78 | 13.78 | 50.957 | 119.273 | 40% |
25% March - 2021 |
05- Nos Units
1. G/F roof laid
2. Civil work in progress
3. Repiar works in progress
4. G/F Plaster work in progress
5. Finishing stage |
No Image |
1. GHSS Spin Dhand
2. GHSS Jamrud
3. GGHSS Kalanga Bara
4. GGHS Landi Kotal
5. GHSS Paindi Lalma
| |||||||||||||||||||
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
Khyber |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 200.23 | 37.177 | 13.78 | 13.78 | 13.78 | 13.78 | 50.957 | 149.273 | 25% |
25% February - 2021 |
05- Nos Units
1. G/F roof laid
2. Civil work in progress
3. Repiar works in progress
4. G/F Plaster work in progress
5. Finishing stage |
No Image |
1. GHSS Spin Dhand
2. GHSS Jamrud
3. GGHSS Kalanga Bara
4. GGHS Landi Kotal
5. GHSS Paindi Lalma
| |||||||||||||||||||
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
Khyber |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 200.23 | 37.177 | 13.78 | 13.78 | 13.78 | 11.34 | 48.517 | 149.273 | 25% |
24% January - 2021 |
05- Nos Units
1. G/F roof laid
2. Civil work in progress
3. Repiar works in progress
4. G/F Plaster work in progress
5. Finishing stage |
No Image |
1. GHSS Spin Dhand
2. GHSS Jamrud
3. GGHSS Kalanga Bara
4. GGHS Landi Kotal
5. GHSS Paindi Lalma
| |||||||||||||||||||
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
Kurram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 141.5 | 0 | 8.465 | 8.465 | 8.465 | 8.465 | 8.465 | 133.035 | 6% |
6% December - 2020 |
4- Units
Work in progress on all units. |
No Image |
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
Kurram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 141.5 | 0 | 8.465 | 8.465 | 8.465 | 8.465 | 8.465 | 133.035 | 6% |
6% December - 2020 |
4- Units
Work in progress on all units. |
No Image |
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
Kurram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 141.5 | 0 | 1.831 | 1.831 | 1.831 | 0 | 0 | 139.669 | 1% |
- October - 2020 |
4- Units
Work in progress on all units. |
No Image |
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
Kurram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 141.5 | 0 | 1.831 | 1.831 | 1.831 | 0 | 0 | 139.669 | 1% |
- September - 2020 |
4- Units
Work in progress on all units. |
No Image |
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
Kurram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 141.5 | 0 | 0 | 0 | 0 | 0 | 0 | 141.5 | - |
- August - 2020 |
4- Units
Work in progress on all units. |
No Image |
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
Kurram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 141.5 | 500.714 | 0 | 0 | 0 | 0 | 500.714 | 0 | - |
100% July - 2020 |
4- Units
Work in progress on all units. |
No Image |
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
Kurram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 141.5 | 50.268 | 16.106 | 16.106 | 16.106 | 16.106 | 66.374 | 75.126 | 47% |
47% May - 2021 |
02- Units
1. GF Mansory, Paint of old building, library foundation in progress upto roof level.
2. Completed |
No Image |
1. GGHSS Luqman Khel UK .?. Rs: 56.00 M
2. GSNHHSS Shalozan UK .?. Rs: 12.00 M | |||||||||||||||||||
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
Kurram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 141.5 | 50.268 | 20 | 20 | 20 | 20 | 70.268 | 71.232 | 50% |
50% April - 2021 |
4- Units
1. GF Mansory, Paint of old building, library foundation in progress upto roof level.
2. finihsing is in progress
3. 1st floor roof in progress
4. Completed |
No Image |
1. GHSS Angori Central Kurram .?. Rs: 61.00 M
2. GHSS Alizai Lower Kurram .?. Rs: 12.500 M
3. GGHSS Luqman Khel UK .?. Rs: 56.00 M
4. GSNHHSS Shalozan UK .?. Rs: 12.00 M | |||||||||||||||||||
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
Kurram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 141.5 | 50.268 | 20 | 20 | 20 | 20 | 70.268 | 71.232 | 50% |
50% March - 2021 |
4- Units
1. GF Mansory, Paint of old building, library foundation in progress upto roof level.
2. finihsing is in progress
3. 1st floor roof in progress
4. Completed |
No Image |
1. GHSS Angori Central Kurram .?. Rs: 61.00 M
2. GHSS Alizai Lower Kurram .?. Rs: 12.500 M
3. GGHSS Luqman Khel UK .?. Rs: 56.00 M
4. GSNHHSS Shalozan UK .?. Rs: 12.00 M | |||||||||||||||||||
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
Kurram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 141.5 | 50.268 | 20 | 20 | 20 | 20 | 70.268 | 71.232 | 50% |
50% February - 2021 |
4- Units
1. GF Mansory, Paint of old building, library foundation in progress upto roof level.
2. finihsing is in progress
3. 1st floor roof in progress
4. Completed |
No Image |
1. GHSS Angori Central Kurram .?. Rs: 61.00 M
2. GHSS Alizai Lower Kurram .?. Rs: 12.500 M
3. GGHSS Luqman Khel UK .?. Rs: 56.00 M
4. GSNHHSS Shalozan UK .?. Rs: 12.00 M | |||||||||||||||||||
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
Kurram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 141.5 | 50.268 | 20 | 20 | 20 | 8.465 | 58.733 | 71.232 | 50% |
42% January - 2021 |
4- Units
1. GF Mansory, Paint of old building, library foundation in progress upto roof level.
2. finihsing is in progress
3. 1st floor roof in progress
4. Completed |
No Image |
1. GHSS Angori Central Kurram .?. Rs: 61.00 M
2. GHSS Alizai Lower Kurram .?. Rs: 12.500 M
3. GGHSS Luqman Khel UK .?. Rs: 56.00 M
4. GSNHHSS Shalozan UK .?. Rs: 12.00 M | |||||||||||||||||||
498 (OG) |
140294-Construction of Judicial Complex, Mardan. |
Mardan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1100 | 18.22 | 7.991 | 7.991 | 3.995 | 3.995 | 22.215 | 1073.789 | 2% |
2% September - 2018 |
LOA issued to M/S Allied Engineering Consultant for supervision. 1 package (dev work) tender approved. 1 package (main building) tendering stopped by orders of PHC. |
No Image |
Mardan | |||||||||||||||||||
498 (OG) |
140294-Construction of Judicial Complex, Mardan. |
Mardan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1100 | 18.22 | 7.991 | 7.991 | 0 | 0 | 18.22 | 1073.789 | 2% |
2% July - 2018 |
LOA issued to M/S Allied Engineering Consultant for supervision. 1 package (dev work) tender approved. 1 package (main building) tendering stopped by orders of PHC. |
No Image |
Mardan | |||||||||||||||||||
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
Mohmand |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 78.143 | 5.721 | 8.303 | 8.303 | 8.303 | 2.693 | 8.414 | 64.119 | 18% |
11% December - 2020 |
03- Units.
Unit -1 Upto roof level,
Unit -2 B/W & Main Building in progress. |
No Image |
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
Mohmand |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 78.143 | 5.721 | 8.303 | 8.303 | 8.303 | 2.693 | 8.414 | 64.119 | 18% |
11% December - 2020 |
03- Units.
Unit -1 Upto roof level,
Unit -2 B/W & Main Building in progress. |
No Image |
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
Mohmand |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 78.143 | 5.721 | 0.498 | 0.498 | 0.498 | 0.419 | 6.14 | 71.924 | 8% |
8% October - 2020 |
03- Units.
Unit -1 Upto roof level,
Unit -2 B/W & Main Building in progress. |
No Image |
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
Mohmand |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 78.143 | 5.721 | 0.498 | 0.498 | 0.498 | 0 | 5.721 | 71.924 | 8% |
7% September - 2020 |
03- Units.
Unit -1 Upto roof level,
Unit -2 B/W & Main Building in progress. |
No Image |
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
Mohmand |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 78.143 | 5.721 | 0.498 | 0.498 | 0.498 | 0 | 5.721 | 71.924 | 8% |
7% August - 2020 |
03- Units.
Unit -1 Upto roof level,
Unit -2 B/W & Main Building in progress. |
No Image |
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
Mohmand |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 78.143 | 5.721 | 23 | 23 | 23 | 14.354 | 20.075 | 49.422 | 37% |
26% May - 2021 |
03- Units
1. Flooring in progress, B/Wall 30% Completed
2. B/W & Main Building in progress.
3. Room upto intieal level, Hall layout given, Tube well completed |
No Image |
1. GHS Ghallani ? Rs: 29.374 M
2. GGHS Ghallani ? Rs: 16.729 M
3. GHS Prang Ghar ? Rs: 21.270 M | |||||||||||||||||||
Pages : 1 2 |