Communication and Works Department

Annual Development Review


Search With ADP Advance Search
Home Page


Progressive Review for the month(s) of : January - 2020, February - 2020, March - 2020, April - 2020, May - 2020, July - 2018, August - 2019, September - 2018, September - 2019, October - 2019, November - 2019, December - 2019,

Showing Page Number : 1 of 3

Code Scheme Name District of Location Commen. Comple. PC - I Status Status
Date
Where
Pending
Cost
Orignnal / Revised
PFY Expenditure Original
Alloc.
Revised
Alloc.
Releases Expenditure Acc. Expenditure Throw Forward Targets Achievements Remarks Images
593
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
Bannu
30-11--1 30-11--1 - 30-11--1 - 20 0 0 0 0 0 0 20 - -
December - 2019
Revenue
No Image
Purchase of furniture and equipment for Judicial Complex Bannu
593
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
Bannu
30-11--1 30-11--1 - 30-11--1 - 20 0 0 0 0 0 0 20 - -
November - 2019
Revenue
No Image
Purchase of furniture and equipment for Judicial Complex Bannu
593
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
Bannu
30-11--1 30-11--1 - 30-11--1 - 20 0 0 0 0 0 0 20 - -
October - 2019
Revenue
No Image
Purchase of furniture and equipment for Judicial Complex Bannu
593
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
Bannu
30-11--1 30-11--1 - 30-11--1 - 20 0 0 0 0 0 0 20 - -
September - 2019
Approved.
No Image
Purchase of furniture and equipment for Judicial Complex Bannu
593
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
Bannu
30-11--1 30-11--1 - 30-11--1 - 20 0 0 0 0 0 0 20 - -
August - 2019
Approved.
No Image
Purchase of furniture and equipment for Judicial Complex Bannu
593
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
Bannu
30-11--1 30-11--1 - 30-11--1 - 20 0 0 0 0 0 0 20 - -
May - 2020
Revenue
No Image
Purchase of furniture and equipment for Judicial Complex Bannu
593
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
Bannu
30-11--1 30-11--1 - 30-11--1 - 20 0 0 0 0 0 0 20 - -
April - 2020
Revenue
No Image
Purchase of furniture and equipment for Judicial Complex Bannu
593
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
Bannu
30-11--1 30-11--1 - 30-11--1 - 20 0 0 0 0 0 0 20 - -
March - 2020
Revenue
No Image
Purchase of furniture and equipment for Judicial Complex Bannu
593
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
Bannu
30-11--1 30-11--1 - 30-11--1 - 20 0 0 0 0 0 0 20 - -
February - 2020
Revenue
No Image
Purchase of furniture and equipment for Judicial Complex Bannu
593
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
Bannu
30-11--1 30-11--1 - 30-11--1 - 20 0 0 0 0 0 0 20 - -
January - 2020
Revenue
No Image
Purchase of furniture and equipment for Judicial Complex Bannu
593
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
Battagram
30-11--1 30-11--1 - 30-11--1 - 4 1 3 3 3 0.537 1.537 0 100% 38%
December - 2019
Bar room - roof level. Litigant shed - DPC level.
No Image
Construction of Bar Room and Litigant Sheds at Judicial Complex Allai
593
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
Battagram
30-11--1 30-11--1 - 30-11--1 - 4 1 3 3 3 0 1 0 100% 25%
November - 2019
Bar room - roof level. Litigant shed - DPC level.
No Image
Construction of Bar Room and Litigant Sheds at Judicial Complex Allai
593
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
Battagram
30-11--1 30-11--1 - 30-11--1 - 4 1 3 3 3 0 1 0 100% 25%
October - 2019
Bar room - roof level. Litigant shed - DPC level.
No Image
Construction of Bar Room and Litigant Sheds at Judicial Complex Allai
593
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
Battagram
30-11--1 30-11--1 - 30-11--1 - 4 1 0 0 0 0 1 3 - 25%
September - 2019
Bar room - roof level. Litigant shed - DPC level.
No Image
Construction of Bar Room and Litigant Sheds at Judicial Complex Allai
593
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
Battagram
30-11--1 30-11--1 - 30-11--1 - 4 1 0 0 0 0 1 3 - 25%
August - 2019
Bar room - roof level. Litigant shed - DPC level.
No Image
Construction of Bar Room and Litigant Sheds at Judicial Complex Allai
593
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
Battagram
30-11--1 30-11--1 - 30-11--1 - 4 1 3 3 3 2.416 3.416 0 100% 85%
May - 2020
Bar room - roof level. Litigant shed - DPC level.
No Image
Construction of Bar Room and Litigant Sheds at Judicial Complex Allai
593
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
Battagram
30-11--1 30-11--1 - 30-11--1 - 4 1 3 3 3 1.894 2.894 0 100% 72%
April - 2020
Bar room - roof level. Litigant shed - DPC level.
No Image
Construction of Bar Room and Litigant Sheds at Judicial Complex Allai
593
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
Battagram
30-11--1 30-11--1 - 30-11--1 - 4 1 3 3 3 1.894 2.894 0 100% 72%
March - 2020
Bar room - roof level. Litigant shed - DPC level.
No Image
Construction of Bar Room and Litigant Sheds at Judicial Complex Allai
593
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
Battagram
30-11--1 30-11--1 - 30-11--1 - 4 1 3 3 3 1.894 2.894 0 100% 72%
February - 2020
Bar room - roof level. Litigant shed - DPC level.
No Image
Construction of Bar Room and Litigant Sheds at Judicial Complex Allai
593
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
Battagram
30-11--1 30-11--1 - 30-11--1 - 4 1 3 3 3 1.894 2.894 0 100% 72%
January - 2020
Bar room - roof level. Litigant shed - DPC level.
No Image
Construction of Bar Room and Litigant Sheds at Judicial Complex Allai
593
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
Charsadda
30-11--1 30-11--1 - 30-11--1 - 28.903 23.431 4.25 4.25 4.25 4.25 27.681 1.222 96% 96%
December - 2019
Completed.
No Image
Construction of Lawyer Shed in newly constructed Judicial Complex at Charsadda.
593
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
Charsadda
30-11--1 30-11--1 - 30-11--1 - 28.903 23.431 4.25 4.25 4.25 4.25 27.681 1.222 96% 96%
November - 2019
Completed.
No Image
Construction of Lawyer Shed in newly constructed Judicial Complex at Charsadda.
593
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
Charsadda
30-11--1 30-11--1 - 30-11--1 - 28.903 23.431 4.25 4.25 4.25 1.25 24.681 1.222 96% 85%
October - 2019
Completed.
No Image
Construction of Lawyer Shed in newly constructed Judicial Complex at Charsadda
593
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
Charsadda
30-11--1 30-11--1 - 30-11--1 - 28.903 23.431 1.25 1.25 1.25 1.25 24.681 4.222 85% 85%
September - 2019
Completed.
No Image
Construction of Lawyer Shed in newly constructed Judicial Complex at Charsadda
593
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
Charsadda
30-11--1 30-11--1 - 30-11--1 - 28.903 23.431 0 0 0 0 23.431 5.472 - 81%
August - 2019
Completed.
No Image
Construction of Lawyer Shed in newly constructed Judicial Complex at Charsadda
593
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
Charsadda
30-11--1 30-11--1 - 30-11--1 - 28.903 23.431 4.25 4.25 4.25 4.25 27.681 1.222 96% 96%
May - 2020
Completed & H/O.
No Image
Construction of Lawyer Shed in newly constructed Judicial Complex at Charsadda.
593
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
Charsadda
30-11--1 30-11--1 - 30-11--1 - 28.903 23.431 4.25 4.25 4.25 4.25 27.681 1.222 96% 96%
April - 2020
Completed & H/O.
No Image
Construction of Lawyer Shed in newly constructed Judicial Complex at Charsadda.
593
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
Charsadda
30-11--1 30-11--1 - 30-11--1 - 28.903 23.431 4.25 4.25 4.25 4.25 27.681 1.222 96% 96%
March - 2020
Completed & H/O.
No Image
Construction of Lawyer Shed in newly constructed Judicial Complex at Charsadda.
593
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
Charsadda
30-11--1 30-11--1 - 30-11--1 - 28.903 23.431 4.25 4.25 4.25 4.25 27.681 1.222 96% 96%
February - 2020
Completed & H/O.
No Image
Construction of Lawyer Shed in newly constructed Judicial Complex at Charsadda.
593
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
Charsadda
30-11--1 30-11--1 - 30-11--1 - 28.903 23.431 4.25 4.25 4.25 4.25 27.681 1.222 96% 96%
January - 2020
Completed.
No Image
Construction of Lawyer Shed in newly constructed Judicial Complex at Charsadda.
593
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
D.I.Khan
30-11--1 30-11--1 - 30-11--1 - 21.068 0 0 0 0 0 0 21.068 - -
December - 2019
Work order issued
No Image
Construction of Single Storey residential apartment at Tehsil Complex Paharpur
593
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
D.I.Khan
30-11--1 30-11--1 - 30-11--1 - 21.068 0 0 0 0 0 0 21.068 - -
November - 2019
Work order issued
No Image
Construction of Single Storey residential apartment at Tehsil Complex Paharpur
593
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
D.I.Khan
30-11--1 30-11--1 - 30-11--1 - 21.068 0 0 0 0 0 0 21.068 - -
October - 2019
Work order issued
No Image
Construction of Single Storey residential apartment at Tehsil Complex Paharpur
593
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
D.I.Khan
30-11--1 30-11--1 - 30-11--1 - 21.068 0 0 0 0 0 0 21.068 - -
September - 2019
Work order issued
No Image
Construction of Single Storey residential apartment at Tehsil Complex Paharpur
593
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
D.I.Khan
30-11--1 30-11--1 - 30-11--1 - 21.068 0 0 0 0 0 0 21.068 - -
August - 2019
Work order issued
No Image
Construction of Single Storey residential apartment at Tehsil Complex Paharpur
593
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
D.I.Khan
30-11--1 30-11--1 - 30-11--1 - 21.068 0 0 0 0 0 0 21.068 - -
May - 2020
Work order issued on 06/04/2018.
No Image
Construction of Single Storey residential apartment at Tehsil Complex Paharpur
593
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
D.I.Khan
30-11--1 30-11--1 - 30-11--1 - 21.068 0 0 0 0 0 0 21.068 - -
April - 2020
Work order issued on 06/04/2018.
No Image
Construction of Single Storey residential apartment at Tehsil Complex Paharpur
593
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
D.I.Khan
30-11--1 30-11--1 - 30-11--1 - 21.068 0 0 0 0 0 0 21.068 - -
March - 2020
Work order issued on 06/04/2018.
No Image
Construction of Single Storey residential apartment at Tehsil Complex Paharpur
593
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
D.I.Khan
30-11--1 30-11--1 - 30-11--1 - 21.068 0 0 0 0 0 0 21.068 - -
February - 2020
Work order issued on 06/04/2018.
No Image
Construction of Single Storey residential apartment at Tehsil Complex Paharpur
593
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
D.I.Khan
30-11--1 30-11--1 - 30-11--1 - 21.068 0 0 0 0 0 0 21.068 - -
January - 2020
Work order issued on 06/04/2018.
No Image
Construction of Single Storey residential apartment at Tehsil Complex Paharpur
593
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
Dir Lower
30-11--1 30-11--1 - 30-11--1 - 10.219 4.373 0 0 0 0 4.373 5.846 - 43%
December - 2019
Finishing in progress.
No Image
Construction of Court Rooms in Judiciary Complex at Dir Lower
593
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
Dir Lower
30-11--1 30-11--1 - 30-11--1 - 10.219 4.373 0 0 0 0 4.373 5.846 - 43%
November - 2019
Finishing in progress. Liability Rs. 3 M
No Image
Construction of Court Rooms in Judiciary Complex at Dir Lower
593
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
Dir Lower
30-11--1 30-11--1 - 30-11--1 - 10.219 4.373 0 0 0 0 4.373 5.846 - 43%
October - 2019
Finishing in progress. Liability Rs. 3 M
No Image
Construction of Court Rooms in Judiciary Complex at Dir Lower
593
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
Dir Lower
30-11--1 30-11--1 - 30-11--1 - 10.219 4.373 0 0 0 0 4.373 5.846 - 43%
September - 2019
Finishing in progress. Liability Rs. 3 M
No Image
Construction of Court Rooms in Judiciary Complex at Dir Lower
593
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
Dir Lower
30-11--1 30-11--1 - 30-11--1 - 10.219 4.373 0 0 0 0 4.373 5.846 - 43%
August - 2019
Finishing in progress. Liability Rs. 3 M
No Image
Construction of Court Rooms in Judiciary Complex at Dir Lower
593
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
Dir Lower
30-11--1 30-11--1 - 30-11--1 - 10.219 4.373 0 0 0 0 4.373 5.846 - 43%
May - 2020
Finishing in progress.
No Image
Construction of Court Rooms in Judiciary Complex at Dir Lower
593
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
Dir Lower
30-11--1 30-11--1 - 30-11--1 - 10.219 4.373 0 0 0 0 4.373 5.846 - 43%
April - 2020
Finishing in progress.
No Image
Construction of Court Rooms in Judiciary Complex at Dir Lower
593
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
Dir Lower
30-11--1 30-11--1 - 30-11--1 - 10.219 4.373 0 0 0 0 4.373 5.846 - 43%
March - 2020
Finishing in progress.
No Image
Construction of Court Rooms in Judiciary Complex at Dir Lower
593
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
Dir Lower
30-11--1 30-11--1 - 30-11--1 - 10.219 4.373 0 0 0 0 4.373 5.846 - 43%
February - 2020
Finishing in progress.
No Image
Construction of Court Rooms in Judiciary Complex at Dir Lower
593
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
Dir Lower
30-11--1 30-11--1 - 30-11--1 - 10.219 4.373 0 0 0 0 4.373 5.846 - 43%
January - 2020
Finishing in progress.
No Image
Construction of Court Rooms in Judiciary Complex at Dir Lower