Code | Scheme Name | District of Location | Commen. | Comple. | PC - I Status | Status Date |
Where Pending |
Cost Orignnal / Revised |
PFY Expenditure | Original Alloc. |
Revised Alloc. |
Releases | Expenditure | Acc. Expenditure | Throw Forward | Targets | Achievements | Remarks | Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
613 (OG) |
130187-Establishment of Pubic Libraries (Phase-III). |
Buner |
20-09-16 | 30-06-18 | - | 05-11-13 | - | 83.707 | 20 | 5 | 5 | 5 | 5 | 25 | 58.707 | 30% |
30% December - 2017 |
FF column in progress. |
No Image |
Public Library Buner | |||||||||||||||||||
613 (OG) |
130187-Establishment of Pubic Libraries (Phase-III). |
Buner |
20-09-16 | 30-06-18 | - | 05-11-13 | - | 83.707 | 20 | 5 | 5 | 5 | 0 | 20 | 58.707 | 30% |
24% September - 2017 |
GF - shuttering in progress. |
No Image |
Public Library Buner | |||||||||||||||||||
613 (OG) |
130187-Establishment of Pubic Libraries (Phase-III). |
Buner |
20-09-16 | 30-06-18 | - | 05-11-13 | - | 83.707 | 20 | 5 | 5 | 5 | 0 | 20 | 58.707 | 30% |
24% August - 2017 |
GF - roof level. |
No Image |
Public Library Buner | |||||||||||||||||||
613 (OG) |
130187-Establishment of Pubic Libraries (Phase-III). |
Buner |
20-09-16 | 30-06-18 | - | 05-11-13 | - | 83.707 | 20 | 0 | 0 | 0 | 0 | 20 | 63.707 | - |
24% July - 2017 |
GF - roof level. |
No Image |
Public Library Buner | |||||||||||||||||||
613 (OG) |
130187-Establishment of Pubic Libraries (Phase-III). |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 83.707 | 20 | 5 | 5 | 5 | 4.444 | 24.444 | 58.707 | 30% |
29% November - 2017 |
Roof laid. |
No Image |
Public Library Buner | |||||||||||||||||||
613 (OG) |
130187-Establishment of Pubic Libraries (Phase-III). |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 83.707 | 20 | 5 | 5 | 5 | 0 | 20 | 58.707 | 30% |
24% October - 2017 |
Roof laid. |
No Image |
Public Library Buner | |||||||||||||||||||
613 (OG) |
130187-Establishment of Pubic Libraries (Phase-III). |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 83.707 | 20 | 7.5 | 7.5 | 7.5 | 7.5 | 27.5 | 56.207 | 33% |
33% June - 2018 |
Main building - GF plastering in progress. |
No Image |
Public Library Buner | |||||||||||||||||||
613 (OG) |
130187-Establishment of Pubic Libraries (Phase-III). |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 83.707 | 20 | 10 | 10 | 10 | 7.5 | 27.5 | 53.707 | 36% |
33% May - 2018 |
Main building - GF plastering in progress. Demand Rs.20 m. |
No Image |
Public Library Buner | |||||||||||||||||||
613 (OG) |
130187-Establishment of Pubic Libraries (Phase-III). |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 83.707 | 20 | 10 | 10 | 10 | 5 | 25 | 53.707 | 36% |
30% April - 2018 |
Main building - GF plastering in progress. Demand Rs.20 m. |
No Image |
Public Library Buner | |||||||||||||||||||
613 (OG) |
130187-Establishment of Pubic Libraries (Phase-III). |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 83.707 | 20 | 10 | 10 | 10 | 5 | 25 | 53.707 | 36% |
30% March - 2018 |
Main building - GF plastering in progress. Deamnd RS. 20 M |
No Image |
Public Library Buner | |||||||||||||||||||
613 (OG) |
130187-Establishment of Pubic Libraries (Phase-III). |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 83.707 | 20 | 5 | 5 | 5 | 5 | 25 | 58.707 | 30% |
30% February - 2018 |
FF brick work in progress. |
No Image |
Public Library Buner | |||||||||||||||||||
613 (OG) |
130187-Establishment of Pubic Libraries (Phase-III). |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 83.707 | 20 | 5 | 5 | 5 | 5 | 25 | 58.707 | 30% |
30% January - 2018 |
FF brick work in progress. |
No Image |
Public Library Buner | |||||||||||||||||||
613 (OG) |
130187-Establishment of Pubic Libraries (Phase-III). |
Charsadda |
11-01-17 | 30-06-18 | - | 05-11-13 | - | 97.502 | 61.257 | 20 | 20 | 20 | 20 | 81.257 | 16.245 | 83% |
83% December - 2017 |
Main building - flooring in progress. Guest house - finishing in progress. Deamnd balance funds. |
No Image |
Public Library at Charsadda PK-17 | |||||||||||||||||||
613 (OG) |
130187-Establishment of Pubic Libraries (Phase-III). |
Charsadda |
- | 30-06-18 | - | 05-11-13 | - | 97.502 | 61.257 | 5 | 5 | 5 | 5 | 66.257 | 31.245 | 68% |
68% September - 2017 |
Main building - flooring in progress. Guest house - finishing in progress. |
No Image |
Public Library at Charsadda PK-17 | |||||||||||||||||||
613 (OG) |
130187-Establishment of Pubic Libraries (Phase-III). |
Charsadda |
- | 30-06-18 | - | 05-11-13 | - | 97.502 | 61.257 | 0 | 0 | 0 | 0 | 61.257 | 36.245 | - |
63% August - 2017 |
Main building - flooring in progress. Guest house - finishing in progress. |
No Image |
Public Library at Charsadda PK-17 | |||||||||||||||||||
613 (OG) |
130187-Establishment of Pubic Libraries (Phase-III). |
Charsadda |
- | 30-06-18 | - | 05-11-13 | - | 97.502 | 61.257 | 0 | 0 | 0 | 0 | 61.257 | 36.245 | - |
63% July - 2017 |
Main building - flooring in progress. Guest house - finishing in progress. |
No Image |
Public Library at Charsadda PK-17 | |||||||||||||||||||
613 (OG) |
130187-Establishment of Pubic Libraries (Phase-III). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 97.502 | 61.257 | 20 | 20 | 20 | 14.58 | 75.837 | 16.245 | 83% |
78% November - 2017 |
Main building - flooring in progress. Guest house - finishing in progress. |
No Image |
Public Library at Charsadda PK-17 | |||||||||||||||||||
613 (OG) |
130187-Establishment of Pubic Libraries (Phase-III). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 97.502 | 61.257 | 5 | 5 | 5 | 5 | 66.257 | 31.245 | 68% |
68% October - 2017 |
Main building - flooring in progress. Guest house - finishing in progress. |
No Image |
Public Library at Charsadda PK-17 | |||||||||||||||||||
613 (OG) |
130187-Establishment of Pubic Libraries (Phase-III). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 97.502 | 67.257 | 25 | 25 | 25 | 25 | 92.257 | 5.245 | 95% |
95% June - 2018 |
Main building - flooring in progress. Guest house - finishing in progress. |
No Image |
Public Library at Charsadda PK-17 | |||||||||||||||||||
613 (OG) |
130187-Establishment of Pubic Libraries (Phase-III). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 97.502 | 67.257 | 25 | 25 | 25 | 25 | 92.257 | 5.245 | 95% |
95% May - 2018 |
Main building - flooring in progress. Guest house - finishing in progress. Deamnd balance funds. |
No Image |
Public Library at Charsadda PK-17 | |||||||||||||||||||
613 (OG) |
130187-Establishment of Pubic Libraries (Phase-III). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 97.502 | 67.257 | 25 | 25 | 25 | 25 | 92.257 | 5.245 | 95% |
95% April - 2018 |
Main building - flooring in progress. Guest house - finishing in progress. Deamnd balance funds. |
No Image |
Public Library at Charsadda PK-17 | |||||||||||||||||||
613 (OG) |
130187-Establishment of Pubic Libraries (Phase-III). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 97.502 | 67.257 | 25 | 25 | 25 | 20 | 87.257 | 5.245 | 95% |
89% March - 2018 |
Main building - flooring in progress. Guest house - finishing in progress. Deamnd balance funds. |
No Image |
Public Library at Charsadda PK-17 | |||||||||||||||||||
613 (OG) |
130187-Establishment of Pubic Libraries (Phase-III). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 97.502 | 67.257 | 20 | 20 | 20 | 20 | 87.257 | 10.245 | 89% |
89% February - 2018 |
Main building - flooring in progress. Guest house - finishing in progress. Deamnd balance funds. |
No Image |
Public Library at Charsadda PK-17 | |||||||||||||||||||
613 (OG) |
130187-Establishment of Pubic Libraries (Phase-III). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 97.502 | 61.257 | 20 | 20 | 20 | 20 | 81.257 | 16.245 | 83% |
83% January - 2018 |
Main building - flooring in progress. Guest house - finishing in progress. Deamnd balance funds. |
No Image |
Public Library at Charsadda PK-17 | |||||||||||||||||||
613 (OG) |
150785-Construction of Road from Choudwan to Gataar to Jandi Baber to Maro Main Road (UC Choudwan) and Musazai Sharif to Kot Shanawaz to Gara Mir Alam to Gara Essa Khan (UC Musazai Sharif), District DI.Khan (i) Construction of Bridge on Valeri Nullah Choudwan Kot Tagga Road (265 rft). |
D.I.Khan HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 199.526 | 30.868 | 0.001 | 0.001 | 0.0005 | 0 | 30.868 | 168.657 | 15% |
15% September - 2018 |
Length 26 Km (width 12 ft) - Jandi Babar to Maroo - earth work, sub base, structure work completed. Revised scope - work order issued. |
No Image |
1) Choudwanto Gataar to Jhandi Babar to Maro Main road UC Choudwan 13 Km
2) Musa Zai Sharif to Kot Shah Nawaz to Garah Mir Alam to Gara Issa Khan UC Musa Zai Sharif 13 Km
3) Construction of Bridge on Waleri Nullah Choudwan Kot Tagga raod 265 rft) - additional work | |||||||||||||||||||
613 (OG) |
150785-Construction of Road from Choudwan to Gataar to Jandi Baber to Maro Main Road (UC Choudwan) and Musazai Sharif to Kot Shanawaz to Gara Mir Alam to Gara Essa Khan (UC Musazai Sharif), District DI.Khan (i) Construction of Bridge on Valeri Nullah Choudwan Kot Tagga Road (265 rft). |
D.I.Khan HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 199.526 | 30.868 | 0.001 | 0.001 | 0.0005 | 0 | 30.868 | 168.657 | 15% |
15% July - 2018 |
Length 26 Km (width 12 ft) - Jandi Babar to Maroo - earth work, sub base, structure work completed. Revised scope - work order issued. |
No Image |
1) Choudwanto Gataar to Jhandi Babar to Maro Main road UC Choudwan 13 Km
2) Musa Zai Sharif to Kot Shah Nawaz to Garah Mir Alam to Gara Issa Khan UC Musa Zai Sharif 13 Km
3) Construction of Bridge on Waleri Nullah Choudwan Kot Tagga raod 265 rft) - additional work | |||||||||||||||||||
613 (OG) |
130187-Establishment of Pubic Libraries (Phase-III). |
Haripur |
- | 30-06-18 | - | 21-02-17 | - | 48.516 | 0 | 5 | 5 | 5 | 0 | 0 | 43.516 | 10% |
- December - 2017 |
Foundation in progress. |
No Image |
Public Library at Ghazi, Haripur | |||||||||||||||||||
613 (OG) |
130187-Establishment of Pubic Libraries (Phase-III). |
Haripur |
- | 30-06-18 | - | 21-02-17 | - | 48.516 | 0 | 5 | 5 | 5 | 0 | 0 | 43.516 | 10% |
- September - 2017 |
Work started. Trees removal completed. |
No Image |
Public Library at Ghazi, Haripur | |||||||||||||||||||
613 (OG) |
130187-Establishment of Pubic Libraries (Phase-III). |
Haripur |
- | 30-06-18 | - | 21-02-17 | - | 48.516 | 0 | 5 | 5 | 5 | 0 | 0 | 43.516 | 10% |
- August - 2017 |
Work started. Trees removal case taken up with forest deptt. |
No Image |
Public Library at Ghazi, Haripur | |||||||||||||||||||
613 (OG) |
130187-Establishment of Pubic Libraries (Phase-III). |
Haripur |
- | 30-06-18 | - | 21-02-17 | - | 48.516 | 0 | 5 | 5 | 5 | 0 | 0 | 43.516 | 10% |
- July - 2017 |
Work started. |
No Image |
Public Library at Ghazi, Haripur | |||||||||||||||||||
613 (OG) |
130187-Establishment of Pubic Libraries (Phase-III). |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 48.516 | 0 | 5 | 5 | 5 | 0 | 0 | 43.516 | 10% |
- November - 2017 |
Work started. Trees removal completed. |
No Image |
Public Library at Ghazi, Haripur | |||||||||||||||||||
613 (OG) |
130187-Establishment of Pubic Libraries (Phase-III). |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 48.516 | 0 | 5 | 5 | 5 | 0 | 0 | 43.516 | 10% |
- October - 2017 |
Work started. Trees removal completed. |
No Image |
Public Library at Ghazi, Haripur | |||||||||||||||||||
613 (OG) |
130187-Establishment of Pubic Libraries (Phase-III). |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 48.516 | 0 | 10 | 10 | 10 | 10 | 10 | 38.516 | 21% |
21% June - 2018 |
Main building - in progress. BW, guard room foundation in progress. |
No Image |
Public Library at Ghazi, Haripur | |||||||||||||||||||
613 (OG) |
130187-Establishment of Pubic Libraries (Phase-III). |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 48.516 | 0 | 12.5 | 12.5 | 12.5 | 10 | 10 | 36.016 | 26% |
21% May - 2018 |
Foundation in progress. |
No Image |
Public Library at Ghazi, Haripur | |||||||||||||||||||
613 (OG) |
130187-Establishment of Pubic Libraries (Phase-III). |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 48.516 | 0 | 12.5 | 12.5 | 12.5 | 10 | 10 | 36.016 | 26% |
21% April - 2018 |
Foundation in progress. |
No Image |
Public Library at Ghazi, Haripur | |||||||||||||||||||
613 (OG) |
130187-Establishment of Pubic Libraries (Phase-III). |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 48.516 | 0 | 12.5 | 12.5 | 12.5 | 5 | 5 | 36.016 | 26% |
10% March - 2018 |
Foundation in progress. |
No Image |
Public Library at Ghazi, Haripur | |||||||||||||||||||
613 (OG) |
130187-Establishment of Pubic Libraries (Phase-III). |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 48.516 | 0 | 5 | 5 | 5 | 5 | 5 | 43.516 | 10% |
10% February - 2018 |
Foundation in progress. |
ADP's Images |
Public Library at Ghazi, Haripur | |||||||||||||||||||
613 (OG) |
130187-Establishment of Pubic Libraries (Phase-III). |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 48.516 | 0 | 5 | 5 | 5 | 5 | 5 | 43.516 | 10% |
10% January - 2018 |
Foundation in progress. |
No Image |
Public Library at Ghazi, Haripur | |||||||||||||||||||
613 (OG) |
130187-Establishment of Pubic Libraries (Phase-III). |
Karak |
- | 30-06-18 | - | 05-11-13 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- December - 2017 |
Site not yet finalized by client deptt. |
No Image |
613 (OG) |
130187-Establishment of Pubic Libraries (Phase-III). |
Karak |
- | 30-06-18 | - | 05-11-13 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- September - 2017 |
Site not yet finalized by client deptt. |
No Image |
613 (OG) |
130187-Establishment of Pubic Libraries (Phase-III). |
Karak |
- | 30-06-18 | - | 05-11-13 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- August - 2017 |
Site not yet finalized by client deptt. |
No Image |
613 (OG) |
130187-Establishment of Pubic Libraries (Phase-III). |
Karak |
- | 30-06-18 | - | 05-11-13 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- July - 2017 |
Site not yet finalized by client deptt. |
No Image |
613 (OG) |
130187-Establishment of Pubic Libraries (Phase-III). |
Karak |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- November - 2017 |
Site not yet finalized by client deptt. |
No Image |
613 (OG) |
130187-Establishment of Pubic Libraries (Phase-III). |
Karak |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- October - 2017 |
Site not yet finalized by client deptt. |
No Image |
613 (OG) |
130187-Establishment of Pubic Libraries (Phase-III). |
Karak |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- June - 2018 |
Site not yet finalized by client deptt. |
No Image |
613 (OG) |
130187-Establishment of Pubic Libraries (Phase-III). |
Karak |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- May - 2018 |
Site not yet finalized by client deptt. |
No Image |
613 (OG) |
130187-Establishment of Pubic Libraries (Phase-III). |
Karak |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- April - 2018 |
Site not yet finalized by client deptt. |
No Image |
613 (OG) |
130187-Establishment of Pubic Libraries (Phase-III). |
Karak |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- March - 2018 |
Site not yet finalized by client deptt. |
No Image |
613 (OG) |
130187-Establishment of Pubic Libraries (Phase-III). |
Karak |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- February - 2018 |
Site not yet finalized by client deptt. |
No Image |
613 (OG) |
130187-Establishment of Pubic Libraries (Phase-III). |
Karak |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- January - 2018 |
Site not yet finalized by client deptt. |
No Image |
Pages : 1 2 |