Communication and Works Department

Annual Development Review


Search With ADP Advance Search
Home Page


Progressive Review for the month(s) of : January - 2020, January - 2021, January - 2018, January - 2019, February - 2020, February - 2021, February - 2018, February - 2019, March - 2020, March - 2021, March - 2018, March - 2019, April - 2020, April - 2021, April - 2018, April - 2019, May - 2020, May - 2021, May - 2018, June - 2018, July - 2020, July - 2017, July - 2018, August - 2020, August - 2017, August - 2019, September - 2020, September - 2017, September - 2018, September - 2019, October - 2020, October - 2017, October - 2019, November - 2019, November - 2017, November - 2018, December - 2017, December - 2020, December - 2018, December - 2019,

Showing Page Number : 1 of 2

Code Scheme Name District of Location Commen. Comple. PC - I Status Status
Date
Where
Pending
Cost
Orignnal / Revised
PFY Expenditure Original
Alloc.
Revised
Alloc.
Releases Expenditure Acc. Expenditure Throw Forward Targets Achievements Remarks Images
779
(OG)
170667-Construction & Black Topping of Road from Barara Mera Khel Hamedi Road Hassan Khel to Khujari (3.9 Km) Bannu.
Bannu
30-11--1 30-11--1 - 30-11--1 - 47.065 0 47.064 44.711 21.179 0 0 0.001 100% -
December - 2018
Tender floated on 24/10/2018. Summary under process.
No Image
PK-73, Bannu
779
(OG)
170667-Construction & Black Topping of Road from Barara Mera Khel Hamedi Road Hassan Khel to Khujari (3.9 Km) Bannu.
Bannu
30-11--1 30-11--1 - 30-11--1 - 47.065 0 47.064 44.711 21.179 0 0 0.001 100% -
November - 2018
Tender floated on 24/10/2018. Summary under process.
No Image
PK-73, Bannu
779
(OG)
170667-Construction & Black Topping of Road from Barara Mera Khel Hamedi Road Hassan Khel to Khujari (3.9 Km) Bannu.
Bannu
30-11--1 30-11--1 - 30-11--1 - 47.065 0 47.064 44.711 21.179 0 0 0.001 100% -
November - 2018
Tender floated on 24/10/2018. Summary under process.
No Image
PK-73, Bannu
779
(OG)
170667-Construction & Black Topping of Road from Barara Mera Khel Hamedi Road Hassan Khel to Khujari (3.9 Km) Bannu.
Bannu
30-11--1 30-11--1 - 30-11--1 - 47.065 0 47.064 41.871 41.871 0 0 0.001 100% -
April - 2019
Re-tendered. Site disputed. Revised PC-I/DCE under preparation based on CMD.
No Image
PK-73, Bannu
779
(OG)
170667-Construction & Black Topping of Road from Barara Mera Khel Hamedi Road Hassan Khel to Khujari (3.9 Km) Bannu.
Bannu
30-11--1 30-11--1 - 30-11--1 - 47.065 0 47.064 44.7108 44.7113 0 0 0.001 100% -
March - 2019
Re-tendered. Site disputed. Revised PC-I/DCE under preparation based on CMD
No Image
PK-73, Bannu
779
(OG)
170667-Construction & Black Topping of Road from Barara Mera Khel Hamedi Road Hassan Khel to Khujari (3.9 Km) Bannu.
Bannu
30-11--1 30-11--1 - 30-11--1 - 47.065 0 47.064 44.7108 44.7113 0 0 0.001 100% -
March - 2019
Re-tendered. Site disputed. Revised PC-I/DCE under preparation based on CMD
No Image
PK-73, Bannu
779
(OG)
170667-Construction & Black Topping of Road from Barara Mera Khel Hamedi Road Hassan Khel to Khujari (3.9 Km) Bannu.
Bannu
30-11--1 30-11--1 - 30-11--1 - 47.065 0 47.064 44.7108 44.7113 0 0 0.001 100% -
February - 2019
Re- Tendered. Site disputed.
No Image
PK-73, Bannu
779
(OG)
170667-Construction & Black Topping of Road from Barara Mera Khel Hamedi Road Hassan Khel to Khujari (3.9 Km) Bannu.
Bannu
30-11--1 30-11--1 - 30-11--1 - 47.065 0 47.064 44.711 21.179 0 0 0.001 100% -
January - 2019
Re- Tendered. Site disputed.
No Image
PK-73, Bannu
779
(OG)
140902-F/S, Design & Improvement, Rehabilitation and BT of Hattan Darra Road, Dir Upper.
Dir Upper
30-11--1 30-11--1 - 30-11--1 - 150 103.114 20.751 20.751 20.751 10.376 113.49 26.135 83% 76%
September - 2018
Length 5 Km - 4 Km BT completed. Work order issued for new work 3 Km. Work in progress on the revsied scope of work.
No Image
Dir Upper (5 Km)
779
(OG)
140902-F/S, Design & Improvement, Rehabilitation and BT of Hattan Darra Road, Dir Upper.
Dir Upper
30-11--1 30-11--1 - 30-11--1 - 150 103.114 20.751 20.751 10.376 0 103.114 26.135 83% 69%
July - 2018
Length 5 Km - 4 Km BT completed. Work order issued for new work 3 Km. Cannot be completed because of the work in progress on the revsied scope of work.
No Image
Dir Upper (5 Km)
779
(OG)
150573-Rehabilitation of Infrastructure Facilities at GTVC (Boys) Gul Bahar Peshawar and GCT Nowshera.
Nowshera
20-08-15 30-06-18 - 22-01-15 - 28 16.477 0 0 0 0 16.477 11.523 - 59%
December - 2017
Work completed on reduced scope (4 components).
No Image
779
(OG)
150573-Rehabilitation of Infrastructure Facilities at GTVC (Boys) Gul Bahar Peshawar and GCT Nowshera.
Nowshera
20-08-15 30-06-18 - 22-01-15 - 28 16.477 0 0 0 0 16.477 11.523 - 59%
September - 2017
Work completed on reduced scope.
No Image
779
(OG)
150573-Rehabilitation of Infrastructure Facilities at GTVC (Boys) Gul Bahar Peshawar and GCT Nowshera.
Nowshera
20-08-15 30-06-18 - 22-01-15 - 28 16.477 0 0 0 0 16.477 11.523 - 59%
August - 2017
Work completed on reduced scope.
No Image
779
(OG)
150573-Rehabilitation of Infrastructure Facilities at GTVC (Boys) Gul Bahar Peshawar and GCT Nowshera.
Nowshera
20-08-15 30-06-18 - 22-01-15 - 28 16.477 0 0 0 0 16.477 11.523 - 59%
July - 2017
Work completed except building involved reconsruction for which PC-II approved.
No Image
779
(New)
200200-F/S for Construction of Childern & Maternity Hospital, Nowshera
Nowshera
30-11--1 30-11--1 - 30-11--1 Line Deptt 15 0 1 1 0 0 0 0 - -
December - 2020
PC-II submitted to Health deptt for Rs. 15 M
No Image
779
(New)
200200-F/S for Construction of Childern & Maternity Hospital, Nowshera
Nowshera
30-11--1 30-11--1 - 30-11--1 Line Deptt 15 0 1 1 0 0 0 0 - -
December - 2020
PC-II submitted to Health deptt for Rs. 15 M
No Image
779
(OG)
150573-Rehabilitation of Infrastructure Facilities at GTVC (Boys) Gul Bahar Peshawar and GCT Nowshera.
Nowshera
30-11--1 30-11--1 - 30-11--1 - 28 16.477 0 0 0 0 16.477 11.523 - 59%
November - 2017
Work completed on reduced scope.
No Image
779
(OG)
150573-Rehabilitation of Infrastructure Facilities at GTVC (Boys) Gul Bahar Peshawar and GCT Nowshera.
Nowshera
30-11--1 30-11--1 - 30-11--1 - 28 16.477 0 0 0 0 16.477 11.523 - 59%
October - 2017
Work completed on reduced scope.
No Image
779
(New)
200200-F/S for Construction of Childern & Maternity Hospital, Nowshera
Nowshera
30-11--1 30-11--1 - 30-11--1 Line Deptt 15 0 1 1 0 0 0 0 - -
October - 2020
PC-II submitted to Health deptt for Rs. 15 M
No Image
779
(New)
200200-F/S for Construction of Childern & Maternity Hospital, Nowshera
Nowshera
30-11--1 30-11--1 - 30-11--1 Line Deptt 15 0 1 1 0 0 0 0 - -
September - 2020
PC-II submitted to Health deptt for Rs. 15 M
No Image
779
(New)
200200-F/S for Construction of Childern & Maternity Hospital, Nowshera
Nowshera
30-11--1 30-11--1 - 30-11--1 Line Deptt 15 0 1 1 0 0 0 0 - -
August - 2020
PC-II submitted to Health deptt for Rs. 15 M
No Image
779
(New)
200200-F/S for Construction of Childern & Maternity Hospital, Nowshera
Nowshera
30-11--1 30-11--1 - 30-11--1 Line Deptt 15 0 1 0 0 0 0 0 -
July - 2020
No Image
779
(OG)
150573-Rehabilitation of Infrastructure Facilities at GTVC (Boys) Gul Bahar Peshawar and GCT Nowshera.
Nowshera
30-11--1 30-11--1 - 30-11--1 - 28 16.477 0 0 0 0 16.477 11.523 - 59%
June - 2018
Work completed on reduced scope (4 components).
No Image
GCT Nowshera PK-14
779
(OG)
150573-Rehabilitation of Infrastructure Facilities at GTVC (Boys) Gul Bahar Peshawar and GCT Nowshera.
Nowshera
30-11--1 30-11--1 - 30-11--1 - 28 16.477 0 0 0 0 16.477 11.523 - 59%
May - 2018
Work completed on reduced scope (4 components).
No Image
GCT Nowshera PK-14
779
(New)
200200-F/S for Construction of Childern & Maternity Hospital, Nowshera
Nowshera
30-11--1 30-11--1 - 30-11--1 Line Deptt 15 0 0 0 0 0 0 0
May - 2021
PC-II approved for Rs. 25 M. RFP called. Proposals Submitted to DST
No Image
779
(OG)
150573-Rehabilitation of Infrastructure Facilities at GTVC (Boys) Gul Bahar Peshawar and GCT Nowshera.
Nowshera
30-11--1 30-11--1 - 30-11--1 - 28 16.477 0 0 0 0 16.477 11.523 - 59%
April - 2018
Work completed on reduced scope (4 components).
No Image
GCT Nowshera PK-14
779
(New)
200200-F/S for Construction of Childern & Maternity Hospital, Nowshera
Nowshera
30-11--1 30-11--1 - 30-11--1 Line Deptt 15 0 0 0 0 0 0 0
April - 2021
PC-II approved for Rs. 25 M. RFP called. Proposals Submitted to DST
No Image
779
(OG)
150573-Rehabilitation of Infrastructure Facilities at GTVC (Boys) Gul Bahar Peshawar and GCT Nowshera.
Nowshera
30-11--1 30-11--1 - 30-11--1 - 28 16.477 0 0 0 0 16.477 11.523 - 59%
March - 2018
Work completed on reduced scope (4 components).
No Image
GCT Nowshera PK-14
779
(New)
200200-F/S for Construction of Childern & Maternity Hospital, Nowshera
Nowshera
30-11--1 30-11--1 - 30-11--1 Line Deptt 15 0 0 0 0 0 0 0
March - 2021
No Image
779
(OG)
150573-Rehabilitation of Infrastructure Facilities at GTVC (Boys) Gul Bahar Peshawar and GCT Nowshera.
Nowshera
30-11--1 30-11--1 - 30-11--1 - 28 16.477 0 0 0 0 16.477 11.523 - 59%
February - 2018
Work completed on reduced scope (4 components).
No Image
GCT Nowshera PK-14
779
(New)
200200-F/S for Construction of Childern & Maternity Hospital, Nowshera
Nowshera
30-11--1 30-11--1 - 30-11--1 Line Deptt 15 0 0 0 0 0 0 0
February - 2021
No Image
779
(OG)
150573-Rehabilitation of Infrastructure Facilities at GTVC (Boys) Gul Bahar Peshawar and GCT Nowshera.
Nowshera
30-11--1 30-11--1 - 30-11--1 - 28 16.477 0 0 0 0 16.477 11.523 - 59%
January - 2018
Work completed on reduced scope (4 components).
No Image
779
(New)
200200-F/S for Construction of Childern & Maternity Hospital, Nowshera
Nowshera
30-11--1 30-11--1 - 30-11--1 Line Deptt 15 0 0 0 0 0 0 0
January - 2021
No Image
779
(OG)
140938-F/S, Design & Improvement/BT of Internal 16 Km Road at Kheshgi Bala and Payan, Nowshera.
Nowshera
HW
30-11--1 30-11--1 - 30-11--1 - 849.997 694.953 40.559 23.559 23.559 23.558219 718.511219 114.485 87% 85%
December - 2019
Original scope completed (16 Km). 1st Revised scope - work in progress. 2nd revised scope (46 Km) - WBM in progress.
No Image
Nowshera
779
(OG)
140938-F/S, Design & Improvement/BT of Internal 16 Km Road at Kheshgi Bala and Payan, Nowshera.
Nowshera
HW
30-11--1 30-11--1 - 30-11--1 - 849.997 694.953 40.559 23.419 3.28 3.28 698.233 114.485 87% 82%
November - 2019
Original scope completed (16 Km). 1st Revised scope - work in progress. 2nd revised scope (46 Km) - WBM in progress.
No Image
Nowshera
779
(OG)
140938-F/S, Design & Improvement/BT of Internal 16 Km Road at Kheshgi Bala and Payan, Nowshera.
Nowshera
HW
30-11--1 30-11--1 - 30-11--1 - 849.997 694.953 40.559 30.419 0.14 0 694.953 114.485 87% 82%
October - 2019
Original scope completed (16 Km). 1st Revised scope - work in progress. 2nd revised scope (46 Km) - WBM in progress.
No Image
Nowshera
779
(OG)
140938-F/S, Design & Improvement/BT of Internal 16 Km Road at Kheshgi Bala and Payan, Nowshera.
Nowshera
HW
30-11--1 30-11--1 - 30-11--1 - 849.997 694.953 40.559 30.419 0 0 694.953 114.485 87% 82%
September - 2019
Original scope completed (16 Km). 1st Revised scope - work in progress. 2nd revised scope (46 Km) - WBM in progress.
No Image
Nowshera
779
(OG)
140938-F/S, Design & Improvement/BT of Internal 16 Km Road at Kheshgi Bala and Payan, Nowshera.
Nowshera
HW
30-11--1 30-11--1 - 30-11--1 - 849.997 694.953 40.559 40.559 10.14 10.14 705.093 114.485 87% 83%
August - 2019
Original scope completed (16 Km). 1st Revised scope - work in progress. 2nd revised scope (46 Km) - WBM in progress.
No Image
Nowshera
779
(OG)
140938-F/S, Design & Improvement/BT of Internal 16 Km Road at Kheshgi Bala and Payan, Nowshera.
Nowshera
HW
30-11--1 30-11--1 - 30-11--1 - 849.997 694.953 40.559 53.559 53.559 53.083 748.036 114.485 87% 88%
May - 2020
Original scope completed (16 Km). 1st Revised scope - work in progress. 2nd revised scope (46 Km) - WBM in progress.
No Image
Nowshera
779
(OG)
140938-F/S, Design & Improvement/BT of Internal 16 Km Road at Kheshgi Bala and Payan, Nowshera.
Nowshera
HW
30-11--1 30-11--1 - 30-11--1 - 849.997 694.953 40.559 53.559 53.559 23.558 718.511 114.485 87% 85%
April - 2020
Original scope completed (16 Km). 1st Revised scope - work in progress. 2nd revised scope (46 Km) - WBM in progress.
No Image
Nowshera
779
(OG)
140938-F/S, Design & Improvement/BT of Internal 16 Km Road at Kheshgi Bala and Payan, Nowshera.
Nowshera
HW
30-11--1 30-11--1 - 30-11--1 - 849.997 694.953 40.559 53.559 53.559 23.558 718.511 114.485 87% 85%
March - 2020
Original scope completed (16 Km). 1st Revised scope - work in progress. 2nd revised scope (46 Km) - WBM in progress.
No Image
Nowshera
779
(OG)
140938-F/S, Design & Improvement/BT of Internal 16 Km Road at Kheshgi Bala and Payan, Nowshera.
Nowshera
HW
30-11--1 30-11--1 - 30-11--1 - 849.997 694.953 40.559 53.559 53.559 23.558 718.511 114.485 87% 85%
February - 2020
Original scope completed (16 Km). 1st Revised scope - work in progress. 2nd revised scope (46 Km) - WBM in progress.
No Image
Nowshera
779
(OG)
140938-F/S, Design & Improvement/BT of Internal 16 Km Road at Kheshgi Bala and Payan, Nowshera.
Nowshera
HW
30-11--1 30-11--1 - 30-11--1 - 849.997 694.953 40.559 23.559 23.559 23.558219 718.511219 114.485 87% 85%
January - 2020
Original scope completed (16 Km). 1st Revised scope - work in progress. 2nd revised scope (46 Km) - WBM in progress.
No Image
Nowshera
779
(OG)
150573-Rehabilitation of Infrastructure Facilities at GTVC (Boys) Gul Bahar Peshawar and GCT Nowshera.
Peshawar
BD-2
15-10-15 30-06-18 - 22-01-15 - 29.889 24.834 5.2 5.2 0 0 24.834 0 100% 83%
December - 2017
(Repair work) - admin block, academic block 95 % .Completed Rs.5.200 m released in FY 2015-16 could not be punched, however, reflected in ADP.
No Image
779
(OG)
150573-Rehabilitation of Infrastructure Facilities at GTVC (Boys) Gul Bahar Peshawar and GCT Nowshera.
Peshawar
BD-2
30-11--1 30-11--1 - 30-11--1 - 29.889 24.834 5.2 5.2 0 0 24.834 0 100% 83%
November - 2017
(Repair work) - admin block, academic block in progress. Rs.5.200 m released in FY 2015-16 could not be punched, however, reflected in ADP.
No Image
779
(OG)
150573-Rehabilitation of Infrastructure Facilities at GTVC (Boys) Gul Bahar Peshawar and GCT Nowshera.
Peshawar
BD-2
30-11--1 30-11--1 - 30-11--1 - 29.889 24.834 5.2 5.2 0 0 24.834 0 100% 83%
October - 2017
(Repair work) - admin block, academic block in progress. Rs.5.2 m released in FY 2015-16 could not be punched, however, reflected in ADP.
No Image
779
(OG)
150573-Rehabilitation of Infrastructure Facilities at GTVC (Boys) Gul Bahar Peshawar and GCT Nowshera.
Peshawar
BD-2
15-10-15 30-06-18 - 22-01-15 - 29.889 24.834 5.2 5.2 0 0 24.834 0 100% 83%
September - 2017
(Repair work) - admin block, academic block in progress. Rs.5.2 m released in FY 2015-16 could not be punched, however, reflected in ADP.
No Image
779
(OG)
150573-Rehabilitation of Infrastructure Facilities at GTVC (Boys) Gul Bahar Peshawar and GCT Nowshera.
Peshawar
BD-2
15-10-15 30-06-18 - 22-01-15 - 29.889 24.834 5.2 5.2 0 0 24.834 0 100% 83%
August - 2017
(Repair work) - admin block, academic block in progress. Rs.5.2 m released in FY 2015-16 could not be punched, however, reflected in ADP.
No Image
779
(OG)
150573-Rehabilitation of Infrastructure Facilities at GTVC (Boys) Gul Bahar Peshawar and GCT Nowshera.
Peshawar
BD-2
15-10-15 30-06-18 - 22-01-15 - 29.889 24.834 0 0 0 0 24.834 5.055 - 83%
July - 2017
(Repair work) - admin block, academic block in progress. Rs.5.2 m released in FY 2015-16 could not be punched, however, reflected in ADP.
No Image
779
(OG)
150573-Rehabilitation of Infrastructure Facilities at GTVC (Boys) Gul Bahar Peshawar and GCT Nowshera.
Peshawar
BD-2
30-11--1 30-11--1 - 30-11--1 - 29.889 24.834 1.956 1.956 1.956 1.956 26.79 3.099 90% 90%
June - 2018
(Repair work) - admin block, academic block 95% completed. Rs.5.200 m released in FY 2015-16 could not be punched, however, reflected in ADP.
No Image
GTVC Gulbahar PK-02, Peshawar