Code | Scheme Name | District of Location | Commen. | Comple. | PC - I Status | Status Date |
Where Pending |
Cost Orignnal / Revised |
PFY Expenditure | Original Alloc. |
Revised Alloc. |
Releases | Expenditure | Acc. Expenditure | Throw Forward | Targets | Achievements | Remarks | Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
86 (OG) |
191049-170420-Opening of 3 CVDs in Rented Buildings, Bara, Khyber Agency. [MA] |
Khyber |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 21.89 | 18.89 | 0 | 0 | 0 | 0 | 18.89 | 0 | - |
- December - 2020 |
No Image | |
86 (OG) |
191049-170420-Opening of 3 CVDs in Rented Buildings, Bara, Khyber Agency. [MA] |
Khyber |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 21.89 | 18.89 | 0 | 0 | 0 | 0 | 18.89 | 0 | - |
- December - 2020 |
No Image | |
86 (OG) |
191049-170420-Opening of 3 CVDs in Rented Buildings, Bara, Khyber Agency. [MA] |
Khyber |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 21.89 | 18.89 | 0 | 0 | 0 | 0 | 18.89 | 0 | - |
- October - 2020 |
No Image | |
86 (OG) |
191049-170420-Opening of 3 CVDs in Rented Buildings, Bara, Khyber Agency. [MA] |
Khyber |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 21.89 | 18.89 | 0 | 0 | 0 | 0 | 18.89 | 0 | - |
- September - 2020 |
No Image | |
86 (OG) |
191049-170420-Opening of 3 CVDs in Rented Buildings, Bara, Khyber Agency. [MA] |
Khyber |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 21.89 | 18.89 | 0 | 0 | 0 | 0 | 18.89 | 0 | - |
- August - 2020 |
No Image | |
86 (OG) |
191049-170420-Opening of 3 CVDs in Rented Buildings, Bara, Khyber Agency. [MA] |
Khyber |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 21.89 | 18.89 | 0 | 0 | 0 | 0 | 18.89 | 0 | - |
July - 2020 |
No Image | |
86 (OG) |
191049-170420-Opening of 3 CVDs in Rented Buildings, Bara, Khyber Agency. [MA] |
Khyber |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 21.89 | 18.89 | 0 | 0 | 0 | 0 | 18.89 | 0 | - |
- May - 2021 |
No Image | |
86 (OG) |
191049-170420-Opening of 3 CVDs in Rented Buildings, Bara, Khyber Agency. [MA] |
Khyber |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 21.89 | 18.89 | 0 | 0 | 0 | 0 | 18.89 | 0 | - |
- April - 2021 |
No Image | |
86 (OG) |
191049-170420-Opening of 3 CVDs in Rented Buildings, Bara, Khyber Agency. [MA] |
Khyber |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 21.89 | 18.89 | 0 | 0 | 0 | 0 | 18.89 | 0 | - |
- March - 2021 |
No Image | |
86 (OG) |
191049-170420-Opening of 3 CVDs in Rented Buildings, Bara, Khyber Agency. [MA] |
Khyber |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 21.89 | 18.89 | 0 | 0 | 0 | 0 | 18.89 | 0 | - |
- February - 2021 |
No Image | |
86 (OG) |
191049-170420-Opening of 3 CVDs in Rented Buildings, Bara, Khyber Agency. [MA] |
Khyber |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 21.89 | 18.89 | 0 | 0 | 0 | 0 | 18.89 | 0 | - |
- January - 2021 |
No Image | |
86 (New) |
170166-Construction of Mazar of Ajmal Khattak at Moza Akora Khattak District Nowshera (i/c land acquisition). |
Nowshera |
01-11-17 | 30-06-18 | - | 18-07-17 | - | 3.747 | 0 | 3.747 | 7.247 | 3.5 | 2.512 | 2.512 | 0 | 100% |
67% December - 2017 |
Flooring in progress. BW upto plinth level. |
No Image |
86 (New) |
170166-Construction of Mazar of Ajmal Khattak at Moza Akora Khattak District Nowshera (i/c land acquisition). |
Nowshera |
- | 30-06-18 | - | 18-07-17 | - | 3.816 | 0 | 3.747 | 3.747 | 0 | 0 | 0 | 0.069 | 98% |
- September - 2017 |
Repair work in mazar in progress. |
No Image |
86 (New) |
170166-Construction of Mazar of Ajmal Khattak at Moza Akora Khattak District Nowshera (i/c land acquisition). |
Nowshera |
- | 30-06-18 | - | 18-07-17 | - | 3.816 | 0 | 3.747 | 3.747 | 0 | 0 | 0 | 0.069 | 98% |
- August - 2017 |
Tender called on 16/08/2017. |
No Image |
86 (New) |
170166-Construction of Mazar of Ajmal Khattak at Moza Akora Khattak District Nowshera (i/c land acquisition). |
Nowshera |
- | 30-06-18 | - | - | Line Deptt | 3.747 | 0 | 3.747 | 3.747 | 0 | 0 | 0 | 0 | 100% |
- July - 2017 |
Tender called on 16/08/2017. |
No Image |
86 (New) |
170166-Construction of Mazar of Ajmal Khattak at Moza Akora Khattak District Nowshera (i/c land acquisition). |
Nowshera |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 3.747 | 0 | 3.747 | 3.747 | 0 | 0 | 0 | 0 | 100% |
- November - 2017 |
Flooring in progress. BW upto plinth level. |
No Image |
86 (New) |
170166-Construction of Mazar of Ajmal Khattak at Moza Akora Khattak District Nowshera (i/c land acquisition). |
Nowshera |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 3.747 | 0 | 3.747 | 3.747 | 0 | 0 | 0 | 0 | 100% |
- October - 2017 |
Flooring in progress. BW upto plinth level. |
No Image |
86 (New) |
170166-Construction of Mazar of Ajmal Khattak at Moza Akora Khattak District Nowshera (i/c land acquisition). |
Nowshera |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 3.747 | 0 | 3.747 | 3.494 | 3.494 | 3.178 | 3.178 | 0 | 100% |
85% June - 2018 |
Completed. |
No Image |
Akora Khattak Nowshera | |||||||||||||||||||
86 (New) |
170166-Construction of Mazar of Ajmal Khattak at Moza Akora Khattak District Nowshera (i/c land acquisition). |
Nowshera |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 3.747 | 0 | 3.747 | 7.246 | 7.246 | 3.178 | 3.178 | 0 | 100% |
85% May - 2018 |
Flooring, BW completed. |
No Image |
Akora Khattak Nowshera | |||||||||||||||||||
86 (New) |
170166-Construction of Mazar of Ajmal Khattak at Moza Akora Khattak District Nowshera (i/c land acquisition). |
Nowshera |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 3.747 | 0 | 3.747 | 7.246 | 7.246 | 3.178 | 3.178 | 0 | 100% |
85% April - 2018 |
Flooring, BW completed. Balance work tendering in progress |
No Image |
Akora Khattak Nowshera | |||||||||||||||||||
86 (New) |
170166-Construction of Mazar of Ajmal Khattak at Moza Akora Khattak District Nowshera (i/c land acquisition). |
Nowshera |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 3.747 | 0 | 3.747 | 7.246 | 7.246 | 3.178 | 3.178 | 0 | 100% |
85% March - 2018 |
Flooring, BW completed. Balance work tendering in progress |
No Image |
Akora Khattak Nowshera | |||||||||||||||||||
86 (New) |
170166-Construction of Mazar of Ajmal Khattak at Moza Akora Khattak District Nowshera (i/c land acquisition). |
Nowshera |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 3.747 | 0 | 3.747 | 4.435 | 4.435 | 2.512 | 2.512 | 0 | 100% |
67% February - 2018 |
Flooring completed. BW complted |
No Image |
Akora Khattak Nowshera | |||||||||||||||||||
86 (New) |
170166-Construction of Mazar of Ajmal Khattak at Moza Akora Khattak District Nowshera (i/c land acquisition). |
Nowshera |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 3.747 | 0 | 3.747 | 7.247 | 4.435 | 2.512 | 2.512 | 0 | 100% |
67% January - 2018 |
Flooring completed. BW upto plinth level. |
No Image |
86 (OG) |
140701-Designing and consruction of duplex residential accomodation of different categories for Govt. Officers/Officials in Hayatabad Peshawar. |
Peshawar PBC-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 215.561 | 159.085 | 56.476 | 56.476 | 42.357 | 25 | 184.085 | 0 | 100% |
85% December - 2018 |
15 Nos - 5 Nos (5 marla) - finishing in progress.
8 Nos (10 marla) - roof tile in progress. 2 Nos (1 Kanal) - finishing in progress. Can be completed for Rs.52.915 m. |
No Image |
Hayatabad Peshawar (5 Marla Duplex House 5 Nos / 20 Marla Duplex House 2 Nos / 10 Marla Duplex House 8 Nos) | |||||||||||||||||||
86 (OG) |
140701-Designing and consruction of duplex residential accomodation of different categories for Govt. Officers/Officials in Hayatabad Peshawar. |
Peshawar PBC-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 215.561 | 159.085 | 56.476 | 56.476 | 28.238 | 25 | 184.085 | 0 | 100% |
85% November - 2018 |
15 Nos - 5 Nos (5 marla) - finishing in progress.
8 Nos (10 marla) - roof tile in progress. 2 Nos (1 Kanal) - finishing in progress. Can be completed for Rs.52.915 m. |
No Image |
Hayatabad Peshawar (5 Marla Duplex House 5 Nos / 20 Marla Duplex House 2 Nos / 10 Marla Duplex House 8 Nos) | |||||||||||||||||||
86 (OG) |
140701-Designing and consruction of duplex residential accomodation of different categories for Govt. Officers/Officials in Hayatabad Peshawar. |
Peshawar PBC-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 215.561 | 159.085 | 56.476 | 56.476 | 28.238 | 25 | 184.085 | 0 | 100% |
85% November - 2018 |
15 Nos - 5 Nos (5 marla) - finishing in progress.
8 Nos (10 marla) - roof tile in progress. 2 Nos (1 Kanal) - finishing in progress. Can be completed for Rs.52.915 m. |
No Image |
Hayatabad Peshawar (5 Marla Duplex House 5 Nos / 20 Marla Duplex House 2 Nos / 10 Marla Duplex House 8 Nos) | |||||||||||||||||||
86 (OG) |
140701-Designing and consruction of duplex residential accomodation of different categories for Govt. Officers/Officials in Hayatabad Peshawar. |
Peshawar PBC-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 215.561 | 159.085 | 56.476 | 83.3 | 83.3 | 67.771 | 226.856 | 0 | 100% |
100% April - 2019 |
15 Nos - 5 Nos (5 marla) - finishing in progress.
8 Nos (10 marla) - roof tile in progress. 2 Nos (1 Kanal) - finishing in progress. Demand Rs.9.1 m for completion. |
No Image |
Hayatabad Peshawar (5 Marla Duplex House 5 Nos / 20 Marla Duplex House 2 Nos / 10 Marla Duplex House 8 Nos) | |||||||||||||||||||
86 (OG) |
140701-Designing and consruction of duplex residential accomodation of different categories for Govt. Officers/Officials in Hayatabad Peshawar. |
Peshawar PBC-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 215.561 | 159.085 | 56.476 | 67.771 | 67.771 | 52.849 | 211.934 | 0 | 100% |
98% March - 2019 |
15 Nos - 5 Nos (5 marla) - finishing in progress.
8 Nos (10 marla) - roof tile in progress. 2 Nos (1 Kanal) - finishing in progress. Demand Rs.9.1 m for completion. |
No Image |
Hayatabad Peshawar (5 Marla Duplex House 5 Nos / 20 Marla Duplex House 2 Nos / 10 Marla Duplex House 8 Nos) | |||||||||||||||||||
86 (OG) |
140701-Designing and consruction of duplex residential accomodation of different categories for Govt. Officers/Officials in Hayatabad Peshawar. |
Peshawar PBC-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 215.561 | 159.085 | 56.476 | 67.771 | 67.771 | 52.849 | 211.934 | 0 | 100% |
98% March - 2019 |
15 Nos - 5 Nos (5 marla) - finishing in progress.
8 Nos (10 marla) - roof tile in progress. 2 Nos (1 Kanal) - finishing in progress. Demand Rs.9.1 m for completion. |
No Image |
Hayatabad Peshawar (5 Marla Duplex House 5 Nos / 20 Marla Duplex House 2 Nos / 10 Marla Duplex House 8 Nos) | |||||||||||||||||||
86 (OG) |
140701-Designing and consruction of duplex residential accomodation of different categories for Govt. Officers/Officials in Hayatabad Peshawar. |
Peshawar PBC-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 215.561 | 159.085 | 56.476 | 67.771 | 67.771 | 52.849 | 211.934 | 0 | 100% |
98% February - 2019 |
15 Nos - 5 Nos (5 marla) - finishing in progress.
8 Nos (10 marla) - roof tile in progress. 2 Nos (1 Kanal) - finishing in progress. Demand Rs. 9.1 m for completion . |
No Image |
Hayatabad Peshawar (5 Marla Duplex House 5 Nos / 20 Marla Duplex House 2 Nos / 10 Marla Duplex House 8 Nos) | |||||||||||||||||||
86 (OG) |
140701-Designing and consruction of duplex residential accomodation of different categories for Govt. Officers/Officials in Hayatabad Peshawar. |
Peshawar PBC-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 215.561 | 159.085 | 56.476 | 56.476 | 53.652 | 40.037 | 199.122 | 0 | 100% |
92% January - 2019 |
15 Nos - 5 Nos (5 marla) - finishing in progress.
8 Nos (10 marla) - roof tile in progress. 2 Nos (1 Kanal) - finishing in progress. Can be completed for Rs.52.915 m. |
No Image |
Hayatabad Peshawar (5 Marla Duplex House 5 Nos / 20 Marla Duplex House 2 Nos / 10 Marla Duplex House 8 Nos) | |||||||||||||||||||
86 (OG) |
140839-Strengthening & Capacity Building of Estate Office/Transport Section, Administration Department. |
Peshawar PBC-2 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 18.302 | 0.125 | 18.178 | 18.178 | 9.089 | 0 | 0.125 | 0 | 100% |
1% September - 2018 |
Plans approved. Layout given. Revised DCE for Rs.15.570 submitted to Admin Deptt for changed scope. |
No Image |
Peshawar | |||||||||||||||||||
86 (OG) |
140839-Strengthening & Capacity Building of Estate Office/Transport Section, Administration Department. |
Peshawar PBC-2 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 18.302 | 0.125 | 18.178 | 18.178 | 9.089 | 0 | 0.125 | 0 | 100% |
1% July - 2018 |
Plans approved. Layout given. Revised DCE for Rs.15.570 submitted to Admin Deptt for changed scope. |
No Image |
Peshawar | |||||||||||||||||||
86 (New) |
190457-Construction of Tehsil Administration complex at Matta Swat. |
Swat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 250 | 0 | 62.5 | 62.5 | 0 | 0 | 0 | 187.5 | 25% |
- December - 2019 |
Technical bid of contractors opned. |
No Image |
86 (New) |
190457-Construction of Tehsil Administration complex at Matta Swat. |
Swat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 250 | 0 | 62.5 | 62.5 | 0 | 0 | 0 | 187.5 | 25% |
- November - 2019 |
Procuremnet in progress. |
No Image |
86 (New) |
190457-Construction of Tehsil Administration complex at Matta Swat. |
Swat |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 250 | 0 | 62.5 | 62.5 | 0 | 0 | 0 | 0 | - |
- October - 2019 |
DE submitted to P&D for Rs. 250 m . Pre PDWP held. |
No Image |
86 (New) |
190457-Construction of Tehsil Administration complex at Matta Swat. |
Swat |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 250 | 0 | 62.5 | 62.5 | 0 | 0 | 0 | 0 | - |
- September - 2019 |
PC-I/DCE under Submitted to SE for Rs. 250 m on MRS 2019. |
No Image |
86 (New) |
190457-Construction of Tehsil Administration complex at Matta Swat. |
Swat |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 250 | 0 | 62.5 | 62.5 | 0 | 0 | 0 | 0 | - |
- August - 2019 |
PC-I/DCE submitted to SE. |
No Image |
86 (New) |
190457-Construction of Tehsil Administration complex at Matta Swat. |
Swat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 250 | 0 | 62.5 | 62.5 | 0 | 0 | 0 | 187.5 | 25% |
- May - 2020 |
Tender approval under process. |
No Image |
86 (New) |
190457-Construction of Tehsil Administration complex at Matta Swat. |
Swat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 250 | 0 | 62.5 | 62.5 | 0 | 0 | 0 | 187.5 | 25% |
- April - 2020 |
Tender approval under process. |
No Image |
86 (New) |
190457-Construction of Tehsil Administration complex at Matta Swat. |
Swat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 250 | 0 | 62.5 | 62.5 | 0 | 0 | 0 | 187.5 | 25% |
- March - 2020 |
Tender approval under process. |
No Image |
86 (New) |
190457-Construction of Tehsil Administration complex at Matta Swat. |
Swat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 250 | 0 | 62.5 | 62.5 | 0 | 0 | 0 | 187.5 | 25% |
- February - 2020 |
Tender approval under process. |
No Image |
86 (New) |
190457-Construction of Tehsil Administration complex at Matta Swat. |
Swat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 250 | 0 | 62.5 | 62.5 | 0 | 0 | 0 | 187.5 | 25% |
- January - 2020 |
Technical bid of contractors opned. |
No Image |
Pages : 1 |