Code | Scheme Name | District of Location | Commen. | Comple. | PC - I Status | Status Date |
Where Pending |
Cost Orignnal / Revised |
PFY Expenditure | Original Alloc. |
Revised Alloc. |
Releases | Expenditure | Acc. Expenditure | Throw Forward | Targets | Achievements | Remarks | Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
918 (OG) |
150835-Construction of RCC Bridges at Hajiabad, Munjai & Nasafa, Kano, Dir Lower. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 450.485 | 42.237 | 10 | 10 | 10 | 10 | 52.237 | 398.248 | 12% |
12% December - 2018 |
Munjai Bridge - working pile in progress. Casting of girders in progress. 3 units tender in progress. |
No Image |
1) RCC Bridges in Dir Lower (4 Nos)
2) RCC Bridge at Munjai (210 mtr)
3) Haji Abad (210 mtr)
4) Nasafa (140 mtr)
5) Kano (70 mtr) | |||||||||||||||||||
918 (OG) |
150835-Construction of RCC Bridges at Hajiabad, Munjai & Nasafa, Kano, Dir Lower. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 450.485 | 42.237 | 10 | 10 | 10 | 10 | 52.237 | 398.248 | 12% |
12% November - 2018 |
Munjai Bridge - working pile in progress. Casting of girders in progress. 3 units tender in progress. |
No Image |
1) RCC Bridges in Dir Lower (4 Nos)
2) RCC Bridge at Munjai (210 mtr)
3) Haji Abad (210 mtr)
4) Nasafa (140 mtr)
5) Kano (70 mtr) | |||||||||||||||||||
918 (OG) |
150835-Construction of RCC Bridges at Hajiabad, Munjai & Nasafa, Kano, Dir Lower. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 450.485 | 42.237 | 10 | 10 | 10 | 10 | 52.237 | 398.248 | 12% |
12% November - 2018 |
Munjai Bridge - working pile in progress. Casting of girders in progress. 3 units tender in progress. |
No Image |
1) RCC Bridges in Dir Lower (4 Nos)
2) RCC Bridge at Munjai (210 mtr)
3) Haji Abad (210 mtr)
4) Nasafa (140 mtr)
5) Kano (70 mtr) | |||||||||||||||||||
918 (OG) |
150835-Construction of RCC Bridges at Hajiabad, Munjai & Nasafa, Kano, Dir Lower. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 450.485 | 42.237 | 10 | 10 | 10 | 10 | 52.237 | 398.248 | 12% |
12% April - 2019 |
Munjai Bridge - working pile in progress. Casting of girders in progress. 3 units tender in progress. Liability 7 M |
No Image |
1) RCC Bridges in Dir Lower (4 Nos)
2) RCC Bridge at Munjai (210 mtr)
3) Haji Abad (210 mtr)
4) Nasafa (140 mtr)
5) Kano (70 mtr) | |||||||||||||||||||
918 (OG) |
150835-Construction of RCC Bridges at Hajiabad, Munjai & Nasafa, Kano, Dir Lower. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 450.485 | 42.237 | 10 | 10 | 10 | 10 | 52.237 | 398.248 | 12% |
12% March - 2019 |
Munjai Bridge - working pile in progress. Casting of girders in progress. 3 units tender in progress. Liability 7 M |
No Image |
1) RCC Bridges in Dir Lower (4 Nos)
2) RCC Bridge at Munjai (210 mtr)
3) Haji Abad (210 mtr)
4) Nasafa (140 mtr)
5) Kano (70 mtr) | |||||||||||||||||||
918 (OG) |
150835-Construction of RCC Bridges at Hajiabad, Munjai & Nasafa, Kano, Dir Lower. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 450.485 | 42.237 | 10 | 10 | 10 | 10 | 52.237 | 398.248 | 12% |
12% March - 2019 |
Munjai Bridge - working pile in progress. Casting of girders in progress. 3 units tender in progress. Liability 7 M |
No Image |
1) RCC Bridges in Dir Lower (4 Nos)
2) RCC Bridge at Munjai (210 mtr)
3) Haji Abad (210 mtr)
4) Nasafa (140 mtr)
5) Kano (70 mtr) | |||||||||||||||||||
918 (OG) |
150835-Construction of RCC Bridges at Hajiabad, Munjai & Nasafa, Kano, Dir Lower. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 450.485 | 42.237 | 10 | 10 | 10 | 10 | 52.237 | 398.248 | 12% |
12% February - 2019 |
Munjai Bridge - working pile in progress. Casting of girders in progress. 3 units tender in progress. Liability 7 M |
No Image |
1) RCC Bridges in Dir Lower (4 Nos)
2) RCC Bridge at Munjai (210 mtr)
3) Haji Abad (210 mtr)
4) Nasafa (140 mtr)
5) Kano (70 mtr) | |||||||||||||||||||
918 (OG) |
150835-Construction of RCC Bridges at Hajiabad, Munjai & Nasafa, Kano, Dir Lower. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 450.485 | 42.237 | 10 | 10 | 10 | 10 | 52.237 | 398.248 | 12% |
12% January - 2019 |
Munjai Bridge - working pile in progress. Casting of girders in progress. 3 units tender in progress. |
No Image |
1) RCC Bridges in Dir Lower (4 Nos)
2) RCC Bridge at Munjai (210 mtr)
3) Haji Abad (210 mtr)
4) Nasafa (140 mtr)
5) Kano (70 mtr) | |||||||||||||||||||
918 (OG) |
180524-Reconstruction/ Special Repair of Govt Colleges in KP |
Mardan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 75 | 0 | 30 | 30 | 30 | 23.193 | 23.193 | 45 | 40% |
31% December - 2020 |
Repair work in progress.
MB= Demolition in progre |
No Image |
918 (OG) |
180524-Reconstruction/ Special Repair of Govt Colleges in KP |
Mardan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 75 | 0 | 30 | 30 | 30 | 23.193 | 23.193 | 45 | 40% |
31% December - 2020 |
Repair work in progress.
MB= Demolition in progre |
No Image |
918 (OG) |
180524-Reconstruction/ Special Repair of Govt Colleges in KP |
Mardan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 75 | 0 | 5 | 5 | 5 | 5 | 5 | 70 | 7% |
7% October - 2020 |
Repair work in progress.
MB= Demolition in progre |
No Image |
918 (OG) |
180524-Reconstruction/ Special Repair of Govt Colleges in KP |
Mardan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 75 | 0 | 5 | 5 | 5 | 5 | 5 | 70 | 7% |
7% September - 2020 |
Repair work in progress.
MB= Demolition in progre |
No Image |
918 (OG) |
180524-Reconstruction/ Special Repair of Govt Colleges in KP |
Mardan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 75 | 0 | 0 | 0 | 0 | 0 | 0 | 75 | - |
- August - 2020 |
Repair work in progress.
MB= Demolition in progre |
No Image |
918 (OG) |
180524-Reconstruction/ Special Repair of Govt Colleges in KP |
Mardan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 75 | 0 | 0 | 0 | 0 | 0 | 0 | 75 | - |
- July - 2020 |
Repair work in progress.
MB= Demolition in progre |
No Image |
918 (OG) |
180524-Reconstruction/ Special Repair of Govt Colleges in KP |
Mardan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 75 | 3.41 | 60 | 60 | 60 | 38.566 | 41.976 | 11.59 | 85% |
56% May - 2021 |
01- Unit
Repair work in progress.
MB= Demolition in progre |
No Image |
Govt: Girls Post Graduate College Mardan PK-53 | |||||||||||||||||||
918 (OG) |
180524-Reconstruction/ Special Repair of Govt Colleges in KP |
Mardan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 75 | 3.41 | 45 | 45 | 45 | 38.566 | 41.976 | 26.59 | 65% |
56% April - 2021 |
Repair work in progress.
MB= Demolition in progre |
No Image |
918 (OG) |
180524-Reconstruction/ Special Repair of Govt Colleges in KP |
Mardan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 75 | 3.41 | 45 | 45 | 45 | 31.421 | 34.831 | 26.59 | 65% |
46% March - 2021 |
Repair work in progress.
MB= Demolition in progre |
No Image |
918 (OG) |
180524-Reconstruction/ Special Repair of Govt Colleges in KP |
Mardan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 75 | 3.41 | 45 | 45 | 45 | 31.421 | 34.831 | 26.59 | 65% |
46% February - 2021 |
Repair work in progress.
MB= Demolition in progre |
No Image |
918 (OG) |
180524-Reconstruction/ Special Repair of Govt Colleges in KP |
Mardan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 75 | 0 | 30 | 30 | 30 | 23.193 | 23.193 | 45 | 40% |
31% January - 2021 |
Repair work in progress.
MB= Demolition in progre |
No Image |
918 (OG) |
180524-Reconstruction/ Special Repair of Govt Colleges in KP |
Peshawar BD-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 75 | 0 | 15 | 15 | 15 | 0.141 | 0.141 | 60 | 20% |
0% October - 2020 |
Site not H/O. Demolishing estimate submitted to CPO HE. |
No Image |
918 (OG) |
180524-Reconstruction/ Special Repair of Govt Colleges in KP |
Peshawar BD-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 75 | 0 | 0 | 0 | 0 | 0 | 0 | 75 | - |
- September - 2020 |
Site not H/O. Demolishing estimate submitted to CPO HE. |
No Image |
918 (OG) |
180524-Reconstruction/ Special Repair of Govt Colleges in KP |
Peshawar BD-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 75 | 0 | 0 | 0 | 0 | 0 | 0 | 75 | - |
- August - 2020 |
Site not H/O. Demolishing estimate submitted to CPO HE. |
No Image |
918 (OG) |
180524-Reconstruction/ Special Repair of Govt Colleges in KP |
Peshawar BD-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 75 | 0 | 0 | 0 | 0 | 0 | 0 | 75 | - |
- July - 2020 |
Site not H/O. |
No Image |
918 (OG) |
180524-Reconstruction/ Special Repair of Govt Colleges in KP |
Peshawar BD-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 75 | 0 | 15 | 15 | 15 | 10.522 | 0 | 0 |
May - 2021 |
01-Unit
Bearing Capacity test report recived form UET Deptt: Structure design still awaited |
No Image | |
Scope of work:
| |||||||||||||||||||
918 (OG) |
180524-Reconstruction/ Special Repair of Govt Colleges in KP |
Peshawar BD-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 75 | 0 | 15 | 15 | 15 | 10.522 | 10.522 | 60 | 20% |
14% April - 2021 |
Bearing Capacity test report recived form UET Deptt: Structure design still awaited |
No Image |
918 (OG) |
180524-Reconstruction/ Special Repair of Govt Colleges in KP |
Peshawar BD-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 75 | 0 | 15 | 15 | 15 | 0.141 | 0.141 | 60 | 20% |
0% March - 2021 |
Bearing Capacity test report recived form UET Deptt: Structure design still awaited |
No Image |
918 (OG) |
180524-Reconstruction/ Special Repair of Govt Colleges in KP |
Peshawar BD-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 75 | 0 | 15 | 15 | 15 | 0.141 | 0.141 | 60 | 20% |
0% February - 2021 |
Bearing Capacity test report recived form UET Deptt: Structure design still awaited |
No Image |
918 (OG) |
180524-Reconstruction/ Special Repair of Govt Colleges in KP |
Peshawar BD-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 75 | 0 | 15 | 15 | 15 | 0.141 | 0.141 | 60 | 20% |
0% January - 2021 |
Bearing Capacity test report recived form UET Deptt: Structure design still awaited |
No Image |
918 (OG) |
180524-Reconstruction/ Special Repair of Govt Colleges in KP |
Peshawar BD-2 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 150 | 0 | 10 | 10 | 10 | 0 | 0 | 140 | 7% |
- October - 2020 |
02 - Units - Work order issued |
No Image |
918 (OG) |
180524-Reconstruction/ Special Repair of Govt Colleges in KP |
Peshawar BD-2 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 150 | 0 | 10 | 10 | 10 | 0 | 0 | 140 | 7% |
- September - 2020 |
02 - Units - Work order issued |
No Image |
918 (OG) |
180524-Reconstruction/ Special Repair of Govt Colleges in KP |
Peshawar BD-2 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 75 | 0 | 0 | 0 | 0 | 0 | 0 | 75 | - |
- August - 2020 |
02 - Units
1- Work order issued.
2- PC-1 sent to Director HE for Rs.75 (M) for approval. |
No Image |
918 (OG) |
180524-Reconstruction/ Special Repair of Govt Colleges in KP |
Peshawar BD-2 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 75 | 0 | 15 | 15 | 15 | 0 | 0 | 60 | 20% |
- May - 2021 |
01- Unit
Layout given |
No Image |
1. Govt: Science Superior College Peshawar | |||||||||||||||||||
918 (OG) |
180524-Reconstruction/ Special Repair of Govt Colleges in KP |
Peshawar BD-2 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 75 | 0 | 15 | 15 | 15 | 0 | 0 | 60 | 20% |
- April - 2021 |
works started |
No Image |
1. Govt: Science Superior College Peshawar | |||||||||||||||||||
918 (OG) |
180524-Reconstruction/ Special Repair of Govt Colleges in KP |
Peshawar BD-2 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 75 | 0 | 0 | 0 | 0 | 0 | 0 | 75 | - |
- March - 2021 |
Structure design completed, Excvation completed, Raft in progress |
No Image |
1. Govt: Science Superior College Peshawar | |||||||||||||||||||
918 (OG) |
180524-Reconstruction/ Special Repair of Govt Colleges in KP |
Peshawar BD-2 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 75 | 0 | 0 | 0 | 0 | 0 | 0 | 75 | - |
- February - 2021 |
Structure design completed, Excvation completed, Raft in progress |
No Image |
1. Govt: Science Superior College Peshawar | |||||||||||||||||||
918 (OG) |
180524-Reconstruction/ Special Repair of Govt Colleges in KP |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 500 | 100 | 200 | 200 | 0 | 0 | 100 | 0 | - |
- December - 2020 |
No Image | |
918 (OG) |
180524-Reconstruction/ Special Repair of Govt Colleges in KP |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 500 | 100 | 200 | 200 | 0 | 0 | 100 | 0 | - |
- December - 2020 |
No Image | |
918 (OG) |
180524-Reconstruction/ Special Repair of Govt Colleges in KP |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 500 | 100 | 200 | 200 | 0 | 0 | 100 | 0 | - |
- October - 2020 |
No Image | |
918 (OG) |
180524-Reconstruction/ Special Repair of Govt Colleges in KP |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 500 | 100 | 200 | 200 | 0 | 0 | 100 | 0 | - |
- September - 2020 |
No Image | |
918 (OG) |
180524-Reconstruction/ Special Repair of Govt Colleges in KP |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 500 | 100 | 200 | 200 | 0 | 0 | 100 | 0 | - |
- August - 2020 |
No Image | |
918 (OG) |
180524-Reconstruction/ Special Repair of Govt Colleges in KP |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 500 | 100 | 200 | 0 | 0 | 0 | 100 | 0 | - |
- July - 2020 |
No Image | |
918 (OG) |
180524-Reconstruction/ Special Repair of Govt Colleges in KP |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 500 | 100 | 200 | 200 | 0 | 0 | 100 | 0 | - |
- May - 2021 |
No Image | |
918 (OG) |
180524-Reconstruction/ Special Repair of Govt Colleges in KP |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 500 | 100 | 200 | 200 | 0 | 0 | 100 | 0 | - |
- April - 2021 |
No Image | |
918 (OG) |
180524-Reconstruction/ Special Repair of Govt Colleges in KP |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 500 | 100 | 200 | 200 | 0 | 0 | 100 | 0 | - |
- March - 2021 |
No Image | |
918 (OG) |
180524-Reconstruction/ Special Repair of Govt Colleges in KP |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 500 | 100 | 200 | 200 | 0 | 0 | 100 | 0 | - |
- February - 2021 |
No Image | |
918 (OG) |
180524-Reconstruction/ Special Repair of Govt Colleges in KP |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 500 | 100 | 200 | 200 | 0 | 0 | 100 | 0 | - |
- January - 2021 |
No Image | |
918 (OG) |
180524-Reconstruction/ Special Repair of Govt Colleges in KP |
Swabi |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 116.006 | 29.847 | 35.189 | 35.189 | 35.189 | 20.758 | 50.605 | 50.97 | 56% |
44% December - 2020 |
2 units - 1 Column upto roof level.
2- Plinth level MB& B/Wall.
Class room roof level. |
No Image |
1) GGDC Zaida
2) GGDC Topi | |||||||||||||||||||
918 (OG) |
180524-Reconstruction/ Special Repair of Govt Colleges in KP |
Swabi |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 116.006 | 29.847 | 35.189 | 35.189 | 35.189 | 20.758 | 50.605 | 50.97 | 56% |
44% December - 2020 |
2 units - 1 Column upto roof level.
2- Plinth level MB& B/Wall.
Class room roof level. |
No Image |
1) GGDC Zaida
2) GGDC Topi | |||||||||||||||||||
918 (OG) |
180524-Reconstruction/ Special Repair of Govt Colleges in KP |
Swabi |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 116.006 | 29.847 | 8.189 | 8.189 | 8.189 | 8.189 | 38.036 | 77.97 | 33% |
33% October - 2020 |
2 units - 1 Column upto roof level.
2- Plinth level MB& B/Wall.
Class room roof level. |
No Image |
1) GGDC Zaida
2) GGDC Topi | |||||||||||||||||||
918 (OG) |
180524-Reconstruction/ Special Repair of Govt Colleges in KP |
Swabi |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 116.006 | 29.847 | 8.189 | 8.189 | 8.189 | 8.189 | 38.036 | 77.97 | 33% |
33% September - 2020 |
2 units - 1 Column upto roof level.
2- Plinth level MB& B/Wall.
Class room roof level. |
No Image |
1) GGDC Zaida
2) GGDC Topi | |||||||||||||||||||
Pages : 1 2 |