Code | Scheme Name | District of Location | Commen. | Comple. | PC - I Status | Status Date |
Where Pending |
Cost Orignnal / Revised |
PFY Expenditure | Original Alloc. |
Revised Alloc. |
Releases | Expenditure | Acc. Expenditure | Throw Forward | Targets | Achievements | Remarks | Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
921 (New) |
190496-Construction / Rehabilitation / Widening / BT to Chakar Mandan road from DI.Khan road to Kakki Road including Narjaffar Nar Shukrullah road Bannu. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 285.029 | 0 | 10 | 10 | 0 | 0 | 0 | 275.029 | 4% |
- December - 2019 |
Procurement in Progress. |
No Image |
921 (New) |
190496-Construction / Rehabilitation / Widening / BT to Chakar Mandan road from DI.Khan road to Kakki Road including Narjaffar Nar Shukrullah road Bannu. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 285.029 | 0 | 10 | 10 | 0 | 0 | 0 | 275.029 | 4% |
- November - 2019 |
Approved. |
No Image |
921 (New) |
190496-Construction / Rehabilitation / Widening / BT to Chakar Mandan road from DI.Khan road to Kakki Road including Narjaffar Nar Shukrullah road Bannu. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 300 | 0 | 10 | 10 | 0 | 0 | 0 | 290 | 3% |
- October - 2019 |
PC-I/DCE under submitted to P&D. Pre DPWP held |
No Image |
921 (New) |
190496-Construction / Rehabilitation / Widening / BT to Chakar Mandan road from DI.Khan road to Kakki Road including Narjaffar Nar Shukrullah road Bannu. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 300 | 0 | 10 | 10 | 0 | 0 | 0 | 0 | - |
- September - 2019 |
PC-I/DCE under preparation for Rs. 300 M on MRS 2019 . Submission by 18/10/2019. |
No Image |
921 (New) |
190496-Construction / Rehabilitation / Widening / BT to Chakar Mandan road from DI.Khan road to Kakki Road including Narjaffar Nar Shukrullah road Bannu. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 300 | 0 | 10 | 10 | 0 | 0 | 0 | 0 | - |
- August - 2019 |
DCE Under preparation for Rs. 300 M |
No Image |
921 (New) |
190496-Construction / Rehabilitation / Widening / BT to Chakar Mandan road from DI.Khan road to Kakki Road including Narjaffar Nar Shukrullah road Bannu. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 285.029 | 0 | 10 | 5 | 5 | 0 | 0 | 275.029 | 4% |
- May - 2020 |
Tender openng on 16/2/20 |
No Image |
921 (New) |
190496-Construction / Rehabilitation / Widening / BT to Chakar Mandan road from DI.Khan road to Kakki Road including Narjaffar Nar Shukrullah road Bannu. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 285.029 | 0 | 10 | 10 | 0 | 0 | 0 | 275.029 | 4% |
- April - 2020 |
Tender openng on 16/2/20 |
No Image |
921 (New) |
190496-Construction / Rehabilitation / Widening / BT to Chakar Mandan road from DI.Khan road to Kakki Road including Narjaffar Nar Shukrullah road Bannu. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 285.029 | 0 | 10 | 10 | 0 | 0 | 0 | 275.029 | 4% |
- March - 2020 |
Tender openng on 16/2/20 |
No Image |
921 (New) |
190496-Construction / Rehabilitation / Widening / BT to Chakar Mandan road from DI.Khan road to Kakki Road including Narjaffar Nar Shukrullah road Bannu. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 285.029 | 0 | 10 | 10 | 0 | 0 | 0 | 275.029 | 4% |
- February - 2020 |
Tender openng on 16/2/20 |
No Image |
921 (New) |
190496-Construction / Rehabilitation / Widening / BT to Chakar Mandan road from DI.Khan road to Kakki Road including Narjaffar Nar Shukrullah road Bannu. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 285.029 | 0 | 10 | 10 | 0 | 0 | 0 | 275.029 | 4% |
- January - 2020 |
Tender openng on 16/2/20 |
No Image |
921 (OG) |
150839-Const of (a) Swat-Asbarn road, Asbarn-Shursheen and Rabial Ghazijatt pat road, Doga Gaz Dara Khadagzai road, Gulabad Asbarn road Khairabad Kotigram Laram road Khadagzai link road Chakdara Kamala Road (Badwan), Dir Lower. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 550 | 186.463 | 10 | 12 | 7.501 | 5.368 | 191.831 | 353.537 | 36% |
35% December - 2018 |
27 Km road - 10 Km completed. 17 Km in progress. |
No Image |
1) Swat Asbanr road
2) Asbanr Shorshing road
3) Ramial Ghazo road
4) Chat Pat road
5) Jawro Kashmir road (2 Km)
6) Osakai road (1 Km)
7) Liko road (1 Km)
8) Nawa Kalay Bochake road (2 Km)
9) Ramora Dara road (1.8 Km)
10) Hamza Banda road (1 Km)
11) Asbanr Ali Dadai road (1 Km)
12) Asbar But Qilla Shadam road (1 Km)
13) Donga Kass-Kasai road (1 Km)
14) Brimkay road (1 Km)
15) Dherai Tesso Khunano Baba road
16) Doga Ghaz Dara road (1 Km)
17) Gul Abad Asbanr/Shah Alam Baba road (3 Km)
18) Khair Abad Kotigram Laram road (2 Km)
19) Khadagzai link/Obokhwar Shaheed road (1.65 Km)
20) Chakdara Kamal Badwan road (3 Km)
21) Swat Asbanr Raghbanai road (3 Km) | |||||||||||||||||||
921 (OG) |
150839-Const of (a) Swat-Asbarn road, Asbarn-Shursheen and Rabial Ghazijatt pat road, Doga Gaz Dara Khadagzai road, Gulabad Asbarn road Khairabad Kotigram Laram road Khadagzai link road Chakdara Kamala Road (Badwan), Dir Lower. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 550 | 186.463 | 10 | 10.5 | 5.501 | 5.368 | 191.831 | 353.537 | 36% |
35% November - 2018 |
27 Km road - 10 Km completed. 17 Km in progress. |
No Image |
1) Swat Asbanr road
2) Asbanr Shorshing road
3) Ramial Ghazo road
4) Chat Pat road
5) Jawro Kashmir road (2 Km)
6) Osakai road (1 Km)
7) Liko road (1 Km)
8) Nawa Kalay Bochake road (2 Km)
9) Ramora Dara road (1.8 Km)
10) Hamza Banda road (1 Km)
11) Asbanr Ali Dadai road (1 Km)
12) Asbar But Qilla Shadam road (1 Km)
13) Donga Kass-Kasai road (1 Km)
14) Brimkay road (1 Km)
15) Dherai Tesso Khunano Baba road
16) Doga Ghaz Dara road (1 Km)
17) Gul Abad Asbanr/Shah Alam Baba road (3 Km)
18) Khair Abad Kotigram Laram road (2 Km)
19) Khadagzai link/Obokhwar Shaheed road (1.65 Km)
20) Chakdara Kamal Badwan road (3 Km)
21) Swat Asbanr Raghbanai road (3 Km) | |||||||||||||||||||
921 (OG) |
150839-Const of (a) Swat-Asbarn road, Asbarn-Shursheen and Rabial Ghazijatt pat road, Doga Gaz Dara Khadagzai road, Gulabad Asbarn road Khairabad Kotigram Laram road Khadagzai link road Chakdara Kamala Road (Badwan), Dir Lower. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 550 | 186.463 | 10 | 10.5 | 5.501 | 5.368 | 191.831 | 353.537 | 36% |
35% November - 2018 |
27 Km road - 10 Km completed. 17 Km in progress. |
No Image |
1) Swat Asbanr road
2) Asbanr Shorshing road
3) Ramial Ghazo road
4) Chat Pat road
5) Jawro Kashmir road (2 Km)
6) Osakai road (1 Km)
7) Liko road (1 Km)
8) Nawa Kalay Bochake road (2 Km)
9) Ramora Dara road (1.8 Km)
10) Hamza Banda road (1 Km)
11) Asbanr Ali Dadai road (1 Km)
12) Asbar But Qilla Shadam road (1 Km)
13) Donga Kass-Kasai road (1 Km)
14) Brimkay road (1 Km)
15) Dherai Tesso Khunano Baba road
16) Doga Ghaz Dara road (1 Km)
17) Gul Abad Asbanr/Shah Alam Baba road (3 Km)
18) Khair Abad Kotigram Laram road (2 Km)
19) Khadagzai link/Obokhwar Shaheed road (1.65 Km)
20) Chakdara Kamal Badwan road (3 Km)
21) Swat Asbanr Raghbanai road (3 Km) | |||||||||||||||||||
921 (OG) |
150839-Const of (a) Swat-Asbarn road, Asbarn-Shursheen and Rabial Ghazijatt pat road, Doga Gaz Dara Khadagzai road, Gulabad Asbarn road Khairabad Kotigram Laram road Khadagzai link road Chakdara Kamala Road (Badwan), Dir Lower. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 550 | 186.463 | 10 | 12 | 12 | 12 | 198.463 | 353.537 | 36% |
36% April - 2019 |
27 Km road - 10 Km completed. 17 Km in progress. Liability Rs. 192 M |
No Image |
1) Swat Asbanr road
2) Asbanr Shorshing road
3) Ramial Ghazo road
4) Chat Pat road
5) Jawro Kashmir road (2 Km)
6) Osakai road (1 Km)
7) Liko road (1 Km)
8) Nawa Kalay Bochake road (2 Km)
9) Ramora Dara road (1.8 Km)
10) Hamza Banda road (1 Km)
11) Asbanr Ali Dadai road (1 Km)
12) Asbar But Qilla Shadam road (1 Km)
13) Donga Kass-Kasai road (1 Km)
14) Brimkay road (1 Km)
15) Dherai Tesso Khunano Baba road
16) Doga Ghaz Dara road (1 Km)
17) Gul Abad Asbanr/Shah Alam Baba road (3 Km)
18) Khair Abad Kotigram Laram road (2 Km)
19) Khadagzai link/Obokhwar Shaheed road (1.65 Km)
20) Chakdara Kamal Badwan road (3 Km)
21) Swat Asbanr Raghbanai road (3 Km) | |||||||||||||||||||
921 (OG) |
150839-Const of (a) Swat-Asbarn road, Asbarn-Shursheen and Rabial Ghazijatt pat road, Doga Gaz Dara Khadagzai road, Gulabad Asbarn road Khairabad Kotigram Laram road Khadagzai link road Chakdara Kamala Road (Badwan), Dir Lower. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 550 | 186.463 | 10 | 12 | 9.5005 | 9.5 | 195.963 | 353.537 | 36% |
36% March - 2019 |
27 Km road - 10 Km completed. 17 Km in progress. Liability Rs. 192 M |
No Image |
1) Swat Asbanr road
2) Asbanr Shorshing road
3) Ramial Ghazo road
4) Chat Pat road
5) Jawro Kashmir road (2 Km)
6) Osakai road (1 Km)
7) Liko road (1 Km)
8) Nawa Kalay Bochake road (2 Km)
9) Ramora Dara road (1.8 Km)
10) Hamza Banda road (1 Km)
11) Asbanr Ali Dadai road (1 Km)
12) Asbar But Qilla Shadam road (1 Km)
13) Donga Kass-Kasai road (1 Km)
14) Brimkay road (1 Km)
15) Dherai Tesso Khunano Baba road
16) Doga Ghaz Dara road (1 Km)
17) Gul Abad Asbanr/Shah Alam Baba road (3 Km)
18) Khair Abad Kotigram Laram road (2 Km)
19) Khadagzai link/Obokhwar Shaheed road (1.65 Km)
20) Chakdara Kamal Badwan road (3 Km)
21) Swat Asbanr Raghbanai road (3 Km) | |||||||||||||||||||
921 (OG) |
150839-Const of (a) Swat-Asbarn road, Asbarn-Shursheen and Rabial Ghazijatt pat road, Doga Gaz Dara Khadagzai road, Gulabad Asbarn road Khairabad Kotigram Laram road Khadagzai link road Chakdara Kamala Road (Badwan), Dir Lower. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 550 | 186.463 | 10 | 12 | 9.5005 | 9.5 | 195.963 | 353.537 | 36% |
36% March - 2019 |
27 Km road - 10 Km completed. 17 Km in progress. Liability Rs. 192 M |
No Image |
1) Swat Asbanr road
2) Asbanr Shorshing road
3) Ramial Ghazo road
4) Chat Pat road
5) Jawro Kashmir road (2 Km)
6) Osakai road (1 Km)
7) Liko road (1 Km)
8) Nawa Kalay Bochake road (2 Km)
9) Ramora Dara road (1.8 Km)
10) Hamza Banda road (1 Km)
11) Asbanr Ali Dadai road (1 Km)
12) Asbar But Qilla Shadam road (1 Km)
13) Donga Kass-Kasai road (1 Km)
14) Brimkay road (1 Km)
15) Dherai Tesso Khunano Baba road
16) Doga Ghaz Dara road (1 Km)
17) Gul Abad Asbanr/Shah Alam Baba road (3 Km)
18) Khair Abad Kotigram Laram road (2 Km)
19) Khadagzai link/Obokhwar Shaheed road (1.65 Km)
20) Chakdara Kamal Badwan road (3 Km)
21) Swat Asbanr Raghbanai road (3 Km) | |||||||||||||||||||
921 (OG) |
150839-Const of (a) Swat-Asbarn road, Asbarn-Shursheen and Rabial Ghazijatt pat road, Doga Gaz Dara Khadagzai road, Gulabad Asbarn road Khairabad Kotigram Laram road Khadagzai link road Chakdara Kamala Road (Badwan), Dir Lower. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 550 | 186.463 | 10 | 12 | 9.5005 | 6.903 | 193.366 | 353.537 | 36% |
35% February - 2019 |
27 Km road - 10 Km completed. 17 Km in progress. Liability Rs. 192 M |
No Image |
1) Swat Asbanr road
2) Asbanr Shorshing road
3) Ramial Ghazo road
4) Chat Pat road
5) Jawro Kashmir road (2 Km)
6) Osakai road (1 Km)
7) Liko road (1 Km)
8) Nawa Kalay Bochake road (2 Km)
9) Ramora Dara road (1.8 Km)
10) Hamza Banda road (1 Km)
11) Asbanr Ali Dadai road (1 Km)
12) Asbar But Qilla Shadam road (1 Km)
13) Donga Kass-Kasai road (1 Km)
14) Brimkay road (1 Km)
15) Dherai Tesso Khunano Baba road
16) Doga Ghaz Dara road (1 Km)
17) Gul Abad Asbanr/Shah Alam Baba road (3 Km)
18) Khair Abad Kotigram Laram road (2 Km)
19) Khadagzai link/Obokhwar Shaheed road (1.65 Km)
20) Chakdara Kamal Badwan road (3 Km)
21) Swat Asbanr Raghbanai road (3 Km) | |||||||||||||||||||
921 (OG) |
150839-Const of (a) Swat-Asbarn road, Asbarn-Shursheen and Rabial Ghazijatt pat road, Doga Gaz Dara Khadagzai road, Gulabad Asbarn road Khairabad Kotigram Laram road Khadagzai link road Chakdara Kamala Road (Badwan), Dir Lower. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 550 | 186.463 | 10 | 12 | 7.501 | 6.903 | 193.366 | 353.537 | 36% |
35% January - 2019 |
27 Km road - 10 Km completed. 17 Km in progress. |
No Image |
1) Swat Asbanr road
2) Asbanr Shorshing road
3) Ramial Ghazo road
4) Chat Pat road
5) Jawro Kashmir road (2 Km)
6) Osakai road (1 Km)
7) Liko road (1 Km)
8) Nawa Kalay Bochake road (2 Km)
9) Ramora Dara road (1.8 Km)
10) Hamza Banda road (1 Km)
11) Asbanr Ali Dadai road (1 Km)
12) Asbar But Qilla Shadam road (1 Km)
13) Donga Kass-Kasai road (1 Km)
14) Brimkay road (1 Km)
15) Dherai Tesso Khunano Baba road
16) Doga Ghaz Dara road (1 Km)
17) Gul Abad Asbanr/Shah Alam Baba road (3 Km)
18) Khair Abad Kotigram Laram road (2 Km)
19) Khadagzai link/Obokhwar Shaheed road (1.65 Km)
20) Chakdara Kamal Badwan road (3 Km)
21) Swat Asbanr Raghbanai road (3 Km) | |||||||||||||||||||
921 (OG) |
150020-Up-gradation of Archaeological Complex Gor Guthtree, Artisan Village and Conservation of Peshawar Walled City. |
Peshawar |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 707.416 | 525.663 | 0 | 0 | 0 | 0 | 525.663 | 181.753 | - |
74% September - 2018 |
Approved in PDWP on 02/08/2018. |
No Image |
Peshawar | |||||||||||||||||||
921 (OG) |
190096-Strengthening of FEF Converted Colleges in Khyber Pakhtunkhwa |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 50 | 2.5 | 27.5 | 27.5 | 0 | 0 | 2.5 | 0 | - |
- December - 2020 |
No Image | |
921 (OG) |
190096-Strengthening of FEF Converted Colleges in Khyber Pakhtunkhwa |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 50 | 2.5 | 27.5 | 27.5 | 0 | 0 | 2.5 | 0 | - |
- December - 2020 |
No Image | |
921 (OG) |
190096-Strengthening of FEF Converted Colleges in Khyber Pakhtunkhwa |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 50 | 2.5 | 27.5 | 27.5 | 0 | 0 | 2.5 | 0 | - |
- October - 2020 |
No Image | |
921 (OG) |
190096-Strengthening of FEF Converted Colleges in Khyber Pakhtunkhwa |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 50 | 2.5 | 27.5 | 27.5 | 0 | 0 | 2.5 | 0 | - |
- September - 2020 |
No Image | |
921 (OG) |
190096-Strengthening of FEF Converted Colleges in Khyber Pakhtunkhwa |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 50 | 2.5 | 27.5 | 27.5 | 0 | 0 | 2.5 | 0 | - |
- August - 2020 |
No Image | |
921 (OG) |
190096-Strengthening of FEF Converted Colleges in Khyber Pakhtunkhwa |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 50 | 2.5 | 27.5 | 0 | 0 | 0 | 2.5 | 0 |
July - 2020 |
No Image | ||
921 (OG) |
190096-Strengthening of FEF Converted Colleges in Khyber Pakhtunkhwa |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 50 | 2.5 | 27.5 | 27.5 | 0 | 0 | 2.5 | 0 | - |
- May - 2021 |
No Image | |
921 (OG) |
190096-Strengthening of FEF Converted Colleges in Khyber Pakhtunkhwa |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 50 | 2.5 | 27.5 | 27.5 | 0 | 0 | 2.5 | 0 | - |
- April - 2021 |
No Image | |
921 (OG) |
190096-Strengthening of FEF Converted Colleges in Khyber Pakhtunkhwa |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 50 | 2.5 | 27.5 | 27.5 | 0 | 0 | 2.5 | 0 | - |
- March - 2021 |
No Image | |
921 (OG) |
190096-Strengthening of FEF Converted Colleges in Khyber Pakhtunkhwa |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 50 | 2.5 | 27.5 | 27.5 | 0 | 0 | 2.5 | 0 | - |
- February - 2021 |
No Image | |
921 (OG) |
190096-Strengthening of FEF Converted Colleges in Khyber Pakhtunkhwa |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 50 | 2.5 | 27.5 | 27.5 | 0 | 0 | 2.5 | 0 | - |
- January - 2021 |