Code | Scheme Name | District of Location | Commen. | Comple. | PC - I Status | Status Date |
Where Pending |
Cost Orignnal / Revised |
PFY Expenditure | Original Alloc. |
Revised Alloc. |
Releases | Expenditure | Acc. Expenditure | Throw Forward | Targets | Achievements | Remarks | Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
95 (OG) |
191052-170021-Provision of Medicines and Artificial Insemination Services in Existing Veterinary Institutions in Bajaur Agency. [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 37.049 | 29.049 | 0 | 0 | 0 | 0 | 29.049 | 0 | - |
- December - 2020 |
No Image | |
95 (OG) |
191052-170021-Provision of Medicines and Artificial Insemination Services in Existing Veterinary Institutions in Bajaur Agency. [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 37.049 | 29.049 | 0 | 0 | 0 | 0 | 29.049 | 0 | - |
- December - 2020 |
No Image | |
95 (OG) |
191052-170021-Provision of Medicines and Artificial Insemination Services in Existing Veterinary Institutions in Bajaur Agency. [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 37.049 | 29.049 | 0 | 0 | 0 | 0 | 29.049 | 0 | - |
- October - 2020 |
No Image | |
95 (OG) |
191052-170021-Provision of Medicines and Artificial Insemination Services in Existing Veterinary Institutions in Bajaur Agency. [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 37.049 | 29.049 | 0 | 0 | 0 | 0 | 29.049 | 0 | - |
- September - 2020 |
No Image | |
95 (OG) |
191052-170021-Provision of Medicines and Artificial Insemination Services in Existing Veterinary Institutions in Bajaur Agency. [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 37.049 | 29.049 | 0 | 0 | 0 | 0 | 29.049 | 0 | - |
- August - 2020 |
No Image | |
95 (OG) |
191052-170021-Provision of Medicines and Artificial Insemination Services in Existing Veterinary Institutions in Bajaur Agency. [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 37.049 | 29.049 | 0 | 0 | 0 | 0 | 29.049 | 0 | - |
July - 2020 |
No Image | |
95 (OG) |
191052-170021-Provision of Medicines and Artificial Insemination Services in Existing Veterinary Institutions in Bajaur Agency. [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 37.049 | 29.049 | 0 | 0 | 0 | 0 | 29.049 | 0 | - |
- May - 2021 |
No Image | |
95 (OG) |
191052-170021-Provision of Medicines and Artificial Insemination Services in Existing Veterinary Institutions in Bajaur Agency. [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 37.049 | 29.049 | 0 | 0 | 0 | 0 | 29.049 | 0 | - |
- April - 2021 |
No Image | |
95 (OG) |
191052-170021-Provision of Medicines and Artificial Insemination Services in Existing Veterinary Institutions in Bajaur Agency. [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 37.049 | 29.049 | 0 | 0 | 0 | 0 | 29.049 | 0 | - |
- March - 2021 |
No Image | |
95 (OG) |
191052-170021-Provision of Medicines and Artificial Insemination Services in Existing Veterinary Institutions in Bajaur Agency. [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 37.049 | 29.049 | 0 | 0 | 0 | 0 | 29.049 | 0 | - |
- February - 2021 |
No Image | |
95 (OG) |
191052-170021-Provision of Medicines and Artificial Insemination Services in Existing Veterinary Institutions in Bajaur Agency. [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 37.049 | 29.049 | 0 | 0 | 0 | 0 | 29.049 | 0 | - |
- January - 2021 |
No Image | |
95 (OG) |
150214-Construction of Cafeteria/Car Parking/Masjid in Provincial Assembly Building at Khyber road Peshawar. |
Peshawar PBC-1 |
27-01-16 | - | - | 24-08-16 | - | 290.907 | 264.14 | 30 | 30 | 13.5 | 11.522 | 275.662 | 0 | 100% |
95% December - 2017 |
Main building (4 storeys) - 3 level car parking, 1 level cafeteria - finishing in progress. |
No Image |
95 (OG) |
100427-Construction of Dormitories for support staff in Khyber Pakhtunkhwa House Islamabad. |
Peshawar PBC-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 102.288 | 82.236 | 19.573 | 21.573 | 11.787 | 2 | 84.236 | 0.479 | 100% |
82% December - 2018 |
Finishing in progress. |
No Image |
1) 4 Storey Domoritiees
2) Dev works
3) Tube well Bore | |||||||||||||||||||
95 (OG) |
150214-Construction of Cafeteria/Car Parking/Masjid in Provincial Assembly Building at Khyber road Peshawar. |
Peshawar PBC-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 290.907 | 264.14 | 30 | 30 | 13.5 | 4.996 | 269.136 | 0 | 100% |
93% November - 2017 |
Main building (4 storeys) - 3 level car parking, 1 level cafeteria - finishing in progress. |
No Image |
95 (OG) |
100427-Construction of Dormitories for support staff in Khyber Pakhtunkhwa House Islamabad. |
Peshawar PBC-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 102.288 | 82.236 | 19.573 | 21.573 | 11.787 | 2 | 84.236 | 0.479 | 100% |
82% November - 2018 |
Finishing in progress. |
No Image |
1) 4 Storey Domoritiees
2) Dev works
3) Tube well Bore | |||||||||||||||||||
95 (OG) |
100427-Construction of Dormitories for support staff in Khyber Pakhtunkhwa House Islamabad. |
Peshawar PBC-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 102.288 | 82.236 | 19.573 | 21.573 | 11.787 | 2 | 84.236 | 0.479 | 100% |
82% November - 2018 |
Finishing in progress. |
No Image |
1) 4 Storey Domoritiees
2) Dev works
3) Tube well Bore | |||||||||||||||||||
95 (OG) |
150214-Construction of Cafeteria/Car Parking/Masjid in Provincial Assembly Building at Khyber road Peshawar. |
Peshawar PBC-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 290.907 | 264.14 | 30 | 30 | 13.5 | 0 | 264.14 | 0 | 100% |
91% October - 2017 |
Main building (4 storeys) - 3 level car parking, 1 level cafeteria - finishing in progress. |
No Image |
95 (OG) |
150214-Construction of Cafeteria/Car Parking/Masjid in Provincial Assembly Building at Khyber road Peshawar. |
Peshawar PBC-1 |
27-01-16 | - | - | 24-08-16 | - | 290.907 | 264.14 | 30 | 30 | 13.5 | 0 | 264.14 | 0 | 100% |
91% September - 2017 |
Main building (4 storeys) - 3 level car parking, 1 level cafeteria - finishing in progress. |
No Image |
95 (OG) |
150214-Construction of Cafeteria/Car Parking/Masjid in Provincial Assembly Building at Khyber road Peshawar. |
Peshawar PBC-1 |
27-01-16 | - | - | 24-08-16 | - | 290.907 | 264.14 | 30 | 30 | 13.5 | 0 | 264.14 | 0 | 100% |
91% August - 2017 |
Main building (4 storey-- 3 level car Parking - 1 level cafeteria) - finishing in progress. |
No Image |
95 (OG) |
150214-Construction of Cafeteria/Car Parking/Masjid in Provincial Assembly Building at Khyber road Peshawar. |
Peshawar PBC-1 |
27-01-16 | - | - | 24-08-16 | - | 290.907 | 264.14 | 30 | 30 | 13.5 | 0 | 264.14 | 0 | 100% |
91% July - 2017 |
Main building (4 storey-- 3 level car Parking - 1 level cafeteria) - finishing in progress. |
No Image |
95 (OG) |
150214-Construction of Cafeteria/Car Parking/Masjid in Provincial Assembly Building at Khyber road Peshawar. |
Peshawar PBC-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 290.907 | 264.14 | 30 | 12.283 | 12.283 | 12.283 | 276.423 | 0 | 100% |
95% June - 2018 |
Main building (4 storeys) - 3 level car parking, 1 level cafeteria - finishing in progress. 2nd Revised PC-I/DCE for Rs.400.760 m submitted to SOR on 26/04/2018. |
No Image |
Peshawar | |||||||||||||||||||
95 (OG) |
150214-Construction of Cafeteria/Car Parking/Masjid in Provincial Assembly Building at Khyber road Peshawar. |
Peshawar PBC-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 290.907 | 264.14 | 30 | 30 | 13.5 | 13.5 | 277.64 | 0 | 100% |
95% May - 2018 |
Main building (4 storeys) - 3 level car parking, 1 level cafeteria - finishing in progress. 2nd Revised PC-I/DCE for Rs.400.760 m submitted to SOR on 26/04/2018. |
No Image |
Peshawar | |||||||||||||||||||
95 (OG) |
150214-Construction of Cafeteria/Car Parking/Masjid in Provincial Assembly Building at Khyber road Peshawar. |
Peshawar PBC-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 290.907 | 264.14 | 30 | 30 | 13.5 | 11.522 | 275.662 | 0 | 100% |
95% April - 2018 |
Main building (4 storeys) - 3 level car parking, 1 level cafeteria - finishing in progress. 2nd Revised PC-I/DCE for Rs.400.760 m submitted to SOR on 26/04/2018. |
No Image |
Peshawar | |||||||||||||||||||
95 (OG) |
100427-Construction of Dormitories for support staff in Khyber Pakhtunkhwa House Islamabad. |
Peshawar PBC-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 102.288 | 82.236 | 19.573 | 21.573 | 21.573 | 4.626 | 86.862 | 0.479 | 100% |
85% April - 2019 |
Finishing in progress. Balance work tender submitted for apprtoval (Rs.14.114 m ). Lease renewal awaited CDA. |
No Image |
1) 4 Storey Domoritiees
2) Dev works
3) Tube well Bore | |||||||||||||||||||
95 (OG) |
150214-Construction of Cafeteria/Car Parking/Masjid in Provincial Assembly Building at Khyber road Peshawar. |
Peshawar PBC-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 290.907 | 264.14 | 30 | 30 | 13.5 | 11.522 | 275.662 | 0 | 100% |
95% March - 2018 |
Main building (4 storeys) - 3 level car parking, 1 level cafeteria - finishing in progress. |
No Image |
Peshawar | |||||||||||||||||||
95 (OG) |
100427-Construction of Dormitories for support staff in Khyber Pakhtunkhwa House Islamabad. |
Peshawar PBC-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 102.288 | 82.236 | 19.573 | 21.573 | 21.573 | 2 | 84.236 | 0.479 | 100% |
82% March - 2019 |
Finishing in progress. Balance work tender submitted for apprtoval (Rs.14.114 m ). Lease renewal awaited CDA. |
No Image |
1) 4 Storey Domoritiees
2) Dev works
3) Tube well Bore | |||||||||||||||||||
95 (OG) |
100427-Construction of Dormitories for support staff in Khyber Pakhtunkhwa House Islamabad. |
Peshawar PBC-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 102.288 | 82.236 | 19.573 | 21.573 | 21.573 | 2 | 84.236 | 0.479 | 100% |
82% March - 2019 |
Finishing in progress. Balance work tender submitted for apprtoval (Rs.14.114 m ). Lease renewal awaited CDA. |
No Image |
1) 4 Storey Domoritiees
2) Dev works
3) Tube well Bore | |||||||||||||||||||
95 (OG) |
150214-Construction of Cafeteria/Car Parking/Masjid in Provincial Assembly Building at Khyber road Peshawar. |
Peshawar PBC-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 290.907 | 264.14 | 30 | 30 | 13.5 | 11.522 | 275.662 | 0 | 100% |
95% February - 2018 |
Main building (4 storeys) - 3 level car parking, 1 level cafeteria - finishing in progress. |
No Image |
Peshawar | |||||||||||||||||||
95 (OG) |
100427-Construction of Dormitories for support staff in Khyber Pakhtunkhwa House Islamabad. |
Peshawar PBC-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 102.288 | 82.236 | 19.573 | 21.573 | 21.573 | 2 | 84.236 | 0.479 | 100% |
82% February - 2019 |
Finishing in progress. Balance work tender submitted for apprtoval (Rs.14.114 m ). Lease renewal awaited CDA. |
No Image |
1) 4 Storey Domoritiees
2) Dev works
3) Tube well Bore | |||||||||||||||||||
95 (OG) |
150214-Construction of Cafeteria/Car Parking/Masjid in Provincial Assembly Building at Khyber road Peshawar. |
Peshawar PBC-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 290.907 | 264.14 | 30 | 30 | 13.5 | 11.522 | 275.662 | 0 | 100% |
95% January - 2018 |
Main building (4 storeys) - 3 level car parking, 1 level cafeteria - finishing in progress. |
No Image |
Peshawar | |||||||||||||||||||
95 (OG) |
100427-Construction of Dormitories for support staff in Khyber Pakhtunkhwa House Islamabad. |
Peshawar PBC-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 102.288 | 82.236 | 19.573 | 21.573 | 11.787 | 2 | 84.236 | 0.479 | 100% |
82% January - 2019 |
Finishing in progress. Balance work tender submitted for apprtoval 9Rs. 14.114 m ). Lease renewal awaited CDA. |
No Image |
1) 4 Storey Domoritiees
2) Dev works
3) Tube well Bore | |||||||||||||||||||
95 (OG) |
90444-Creation of CSR/MRS Cell in C&W Department |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 67.44 | 47.164 | 10 | 10 | 10 | 0 | 47.164 | 10.276 | 85% |
70% December - 2019 |
LOA issued to Techno Legal Consultants on 14/03/2018. |
No Image |
CSR/MRS Cell | |||||||||||||||||||
95 (OG) |
90444-Creation of CSR/MRS Cell in C&W Department |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 67.44 | 47.164 | 10 | 10 | 2.5 | 0 | 47.164 | 10.276 | 85% |
70% November - 2019 |
LOA issued to Techno Legal Consultants on 14/03/2018. |
No Image |
CSR/MRS Cell | |||||||||||||||||||
95 (OG) |
90444-Creation of CSR/MRS Cell in C&W Department |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 67.44 | 47.164 | 10 | 10 | 2.5 | 0 | 47.164 | 10.276 | 85% |
70% October - 2019 |
LOA issued to Techno Legal Consultants on 14/03/2018. |
No Image |
CSR/MRS Cell | |||||||||||||||||||
95 (OG) |
90444-Creation of CSR/MRS Cell in C&W Department |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 67.44 | 47.164 | 10 | 10 | 2.5 | 0 | 47.164 | 10.276 | 85% |
70% September - 2019 |
LOA issued to Techno Legal Consultants on 14/03/2018. |
No Image |
CSR/MRS Cell | |||||||||||||||||||
95 (OG) |
90444-Creation of CSR/MRS Cell in C&W Department |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 67.44 | 47.164 | 10 | 10 | 2.5 | 0 | 47.164 | 10.276 | 85% |
70% August - 2019 |
LOA issued to Techno Legal Consultants on 14/03/2018. |
No Image |
CSR/MRS Cell | |||||||||||||||||||
95 (OG) |
90444-Creation of CSR/MRS Cell in C&W Department |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 67.44 | 47.164 | 10 | 10 | 10 | 0 | 47.164 | 10.276 | 85% |
70% May - 2020 |
LOA issued to Techno Legal Consultants on 14/03/2018. |
No Image |
CSR/MRS Cell | |||||||||||||||||||
95 (OG) |
90444-Creation of CSR/MRS Cell in C&W Department |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 67.44 | 47.164 | 10 | 10 | 10 | 0 | 47.164 | 10.276 | 85% |
70% April - 2020 |
LOA issued to Techno Legal Consultants on 14/03/2018. |
No Image |
CSR/MRS Cell | |||||||||||||||||||
95 (OG) |
90444-Creation of CSR/MRS Cell in C&W Department |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 67.44 | 47.164 | 10 | 10 | 10 | 0 | 47.164 | 10.276 | 85% |
70% March - 2020 |
LOA issued to Techno Legal Consultants on 14/03/2018. |
No Image |
CSR/MRS Cell | |||||||||||||||||||
95 (OG) |
90444-Creation of CSR/MRS Cell in C&W Department |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 67.44 | 47.164 | 10 | 10 | 10 | 0 | 47.164 | 10.276 | 85% |
70% February - 2020 |
LOA issued to Techno Legal Consultants on 14/03/2018. |
No Image |
CSR/MRS Cell | |||||||||||||||||||
95 (OG) |
90444-Creation of CSR/MRS Cell in C&W Department |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 67.44 | 47.164 | 10 | 10 | 10 | 0 | 47.164 | 10.276 | 85% |
70% January - 2020 |
LOA issued to Techno Legal Consultants on 14/03/2018. |
No Image |
CSR/MRS Cell | |||||||||||||||||||
Pages : 1 |