Code | Scheme Name | District of Location | Commen. | Comple. | PC - I Status | Status Date |
Where Pending |
Cost Orignnal / Revised |
PFY Expenditure | Original Alloc. |
Revised Alloc. |
Releases | Expenditure | Acc. Expenditure | Throw Forward | Targets | Achievements | Remarks | Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
97 (OG) |
120626-Construction of Residences & Bachelor Hostel in all District Headquarters for Govt servants in Khyber Pakhtunkhwa. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 53.378 | 54.013 | 0 | 0 | 0 | 0 | 54.013 | 0 | - |
100% December - 2018 |
Completed & H/O (3 units). |
No Image |
1) Bachelor hostel (6 suits), C&W Colony Sikandarabad
2) Cat-II residence, Sujabdarabad (1 No)
3) Cat-II residence, Sikandarabad (1 No) | |||||||||||||||||||
97 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7.847 | 0 | 0 | 0 | 0 | 0 | 0 | 7.847 | - |
- December - 2019 |
Work order issued.
Work Executed By PBC |
No Image |
1) Construction of Mosque in Khyber Pakhtunkhwa House Abbottabad (CS Directive)
2) Parda Wall of Inspection Hut C&W Deptt Abbottabad
3) Rehabilitation and renovation of Govt Guest House Shimla Hill road Abbottabad
4) Renovation of C&W Rest House Kakool Abbottabad
5) Rehabilitation / Renovtion of Kala Pani Rest House Abbottabad
6) Construction of Lavatory Block and Record Room in C&W Division Office Abbottabad | |||||||||||||||||||
97 (OG) |
120626-Construction of Residences & Bachelor Hostel in all District Headquarters for Govt servants in Khyber Pakhtunkhwa. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 53.378 | 54.013 | 0 | 0 | 0 | 0 | 54.013 | 0 | - |
100% November - 2018 |
Completed & H/O (3 units). |
No Image |
1) Bachelor hostel (6 suits), C&W Colony Sikandarabad
2) Cat-II residence, Sujabdarabad (1 No)
3) Cat-II residence, Sikandarabad (1 No) | |||||||||||||||||||
97 (OG) |
120626-Construction of Residences & Bachelor Hostel in all District Headquarters for Govt servants in Khyber Pakhtunkhwa. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 53.378 | 54.013 | 0 | 0 | 0 | 0 | 54.013 | 0 | - |
100% November - 2018 |
Completed & H/O (3 units). |
No Image |
1) Bachelor hostel (6 suits), C&W Colony Sikandarabad
2) Cat-II residence, Sujabdarabad (1 No)
3) Cat-II residence, Sikandarabad (1 No) | |||||||||||||||||||
97 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7.847 | 0 | 0 | 0 | 0 | 0 | 0 | 7.847 | - |
- November - 2019 |
Work order issued. |
No Image |
1) Construction of Mosque in Khyber Pakhtunkhwa House Abbottabad (CS Directive)
2) Parda Wall of Inspection Hut C&W Deptt Abbottabad
3) Rehabilitation and renovation of Govt Guest House Shimla Hill road Abbottabad
4) Renovation of C&W Rest House Kakool Abbottabad
5) Rehabilitation / Renovtion of Kala Pani Rest House Abbottabad
6) Construction of Lavatory Block and Record Room in C&W Division Office Abbottabad | |||||||||||||||||||
97 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7.847 | 0 | 0 | 0 | 0 | 0 | 0 | 7.847 | - |
- October - 2019 |
Work order issued. |
No Image |
1) Construction of Mosque in Khyber Pakhtunkhwa House Abbottabad (CS Directive)
2) Parda Wall of Inspection Hut C&W Deptt Abbottabad
3) Rehabilitation and renovation of Govt Guest House Shimla Hill road Abbottabad
4) Renovation of C&W Rest House Kakool Abbottabad
5) Rehabilitation / Renovtion of Kala Pani Rest House Abbottabad
6) Construction of Lavatory Block and Record Room in C&W Division Office Abbottabad | |||||||||||||||||||
97 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7.847 | 0 | 0 | 0 | 0 | 0 | 0 | 7.847 | - |
- September - 2019 |
Work order issued. |
No Image |
1) Construction of Mosque in Khyber Pakhtunkhwa House Abbottabad (CS Directive)
2) Parda Wall of Inspection Hut C&W Deptt Abbottabad
3) Rehabilitation and renovation of Govt Guest House Shimla Hill road Abbottabad
4) Renovation of C&W Rest House Kakool Abbottabad
5) Rehabilitation / Renovtion of Kala Pani Rest House Abbottabad
6) Construction of Lavatory Block and Record Room in C&W Division Office Abbottabad | |||||||||||||||||||
97 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7.847 | 0 | 0 | 0 | 0 | 0 | 0 | 7.847 | - |
- August - 2019 |
Work order issued. |
No Image |
1) Construction of Mosque in Khyber Pakhtunkhwa House Abbottabad (CS Directive)
2) Parda Wall of Inspection Hut C&W Deptt Abbottabad
3) Rehabilitation and renovation of Govt Guest House Shimla Hill road Abbottabad
4) Renovation of C&W Rest House Kakool Abbottabad
5) Rehabilitation / Renovtion of Kala Pani Rest House Abbottabad
6) Construction of Lavatory Block and Record Room in C&W Division Office Abbottabad | |||||||||||||||||||
97 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7.847 | 0 | 0 | 0 | 0 | 0 | 0 | 7.847 | - |
- May - 2020 |
Work order issued.
Work Executed By PBC |
No Image |
1) Construction of Mosque in Khyber Pakhtunkhwa House Abbottabad (CS Directive)
2) Parda Wall of Inspection Hut C&W Deptt Abbottabad
3) Rehabilitation and renovation of Govt Guest House Shimla Hill road Abbottabad
4) Renovation of C&W Rest House Kakool Abbottabad
5) Rehabilitation / Renovtion of Kala Pani Rest House Abbottabad
6) Construction of Lavatory Block and Record Room in C&W Division Office Abbottabad | |||||||||||||||||||
97 (OG) |
120626-Construction of Residences & Bachelor Hostel in all District Headquarters for Govt servants in Khyber Pakhtunkhwa. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 53.378 | 54.013 | 0 | 0 | 0 | 0 | 54.013 | 0 | - |
100% April - 2019 |
Completed & H/O (3 units). |
No Image |
1) Bachelor hostel (6 suits), C&W Colony Sikandarabad
2) Cat-II residence, Sujabdarabad (1 No)
3) Cat-II residence, Sikandarabad (1 No) | |||||||||||||||||||
97 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7.847 | 0 | 0 | 0 | 0 | 0 | 0 | 7.847 | - |
- April - 2020 |
Work order issued.
Work Executed By PBC |
No Image |
1) Construction of Mosque in Khyber Pakhtunkhwa House Abbottabad (CS Directive)
2) Parda Wall of Inspection Hut C&W Deptt Abbottabad
3) Rehabilitation and renovation of Govt Guest House Shimla Hill road Abbottabad
4) Renovation of C&W Rest House Kakool Abbottabad
5) Rehabilitation / Renovtion of Kala Pani Rest House Abbottabad
6) Construction of Lavatory Block and Record Room in C&W Division Office Abbottabad | |||||||||||||||||||
97 (OG) |
120626-Construction of Residences & Bachelor Hostel in all District Headquarters for Govt servants in Khyber Pakhtunkhwa. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 53.378 | 54.013 | 0 | 0 | 0 | 0 | 54.013 | 0 | - |
100% March - 2019 |
Completed & H/O (3 units). |
No Image |
1) Bachelor hostel (6 suits), C&W Colony Sikandarabad
2) Cat-II residence, Sujabdarabad (1 No)
3) Cat-II residence, Sikandarabad (1 No) | |||||||||||||||||||
97 (OG) |
120626-Construction of Residences & Bachelor Hostel in all District Headquarters for Govt servants in Khyber Pakhtunkhwa. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 53.378 | 54.013 | 0 | 0 | 0 | 0 | 54.013 | 0 | - |
100% March - 2019 |
Completed & H/O (3 units). |
No Image |
1) Bachelor hostel (6 suits), C&W Colony Sikandarabad
2) Cat-II residence, Sujabdarabad (1 No)
3) Cat-II residence, Sikandarabad (1 No) | |||||||||||||||||||
97 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7.847 | 0 | 0 | 0 | 0 | 0 | 0 | 7.847 | - |
- March - 2020 |
Work order issued.
Work Executed By PBC |
No Image |
1) Construction of Mosque in Khyber Pakhtunkhwa House Abbottabad (CS Directive)
2) Parda Wall of Inspection Hut C&W Deptt Abbottabad
3) Rehabilitation and renovation of Govt Guest House Shimla Hill road Abbottabad
4) Renovation of C&W Rest House Kakool Abbottabad
5) Rehabilitation / Renovtion of Kala Pani Rest House Abbottabad
6) Construction of Lavatory Block and Record Room in C&W Division Office Abbottabad | |||||||||||||||||||
97 (OG) |
120626-Construction of Residences & Bachelor Hostel in all District Headquarters for Govt servants in Khyber Pakhtunkhwa. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 53.378 | 54.013 | 0 | 0 | 0 | 0 | 54.013 | 0 | - |
100% February - 2019 |
Completed & H/O (3 units). |
No Image |
1) Bachelor hostel (6 suits), C&W Colony Sikandarabad
2) Cat-II residence, Sujabdarabad (1 No)
3) Cat-II residence, Sikandarabad (1 No) | |||||||||||||||||||
97 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7.847 | 0 | 0 | 0 | 0 | 0 | 0 | 7.847 | - |
- February - 2020 |
Work order issued.
Work Executed By PBC |
No Image |
1) Construction of Mosque in Khyber Pakhtunkhwa House Abbottabad (CS Directive)
2) Parda Wall of Inspection Hut C&W Deptt Abbottabad
3) Rehabilitation and renovation of Govt Guest House Shimla Hill road Abbottabad
4) Renovation of C&W Rest House Kakool Abbottabad
5) Rehabilitation / Renovtion of Kala Pani Rest House Abbottabad
6) Construction of Lavatory Block and Record Room in C&W Division Office Abbottabad | |||||||||||||||||||
97 (OG) |
120626-Construction of Residences & Bachelor Hostel in all District Headquarters for Govt servants in Khyber Pakhtunkhwa. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 53.378 | 54.013 | 0 | 0 | 0 | 0 | 54.013 | 0 | - |
100% January - 2019 |
Completed & H/O (3 units). |
No Image |
1) Bachelor hostel (6 suits), C&W Colony Sikandarabad
2) Cat-II residence, Sujabdarabad (1 No)
3) Cat-II residence, Sikandarabad (1 No) | |||||||||||||||||||
97 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7.847 | 0 | 0 | 0 | 0 | 0 | 0 | 7.847 | - |
- January - 2020 |
Work order issued.
Work Executed By PBC |
No Image |
1) Construction of Mosque in Khyber Pakhtunkhwa House Abbottabad (CS Directive)
2) Parda Wall of Inspection Hut C&W Deptt Abbottabad
3) Rehabilitation and renovation of Govt Guest House Shimla Hill road Abbottabad
4) Renovation of C&W Rest House Kakool Abbottabad
5) Rehabilitation / Renovtion of Kala Pani Rest House Abbottabad
6) Construction of Lavatory Block and Record Room in C&W Division Office Abbottabad | |||||||||||||||||||
97 (OG) |
191081-090012-Provision of Mobile Veterinary Clinics in Bajaur Agency. [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 32.986 | 29.986 | 0 | 0 | 0 | 0 | 29.986 | 0 | - |
- December - 2020 |
No Image | |
97 (OG) |
191081-090012-Provision of Mobile Veterinary Clinics in Bajaur Agency. [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 32.986 | 29.986 | 0 | 0 | 0 | 0 | 29.986 | 0 | - |
- December - 2020 |
No Image | |
97 (OG) |
191081-090012-Provision of Mobile Veterinary Clinics in Bajaur Agency. [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 32.986 | 29.986 | 0 | 0 | 0 | 0 | 29.986 | 0 | - |
- October - 2020 |
No Image | |
97 (OG) |
191081-090012-Provision of Mobile Veterinary Clinics in Bajaur Agency. [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 32.986 | 29.986 | 0 | 0 | 0 | 0 | 29.986 | 0 | - |
- September - 2020 |
No Image | |
97 (OG) |
191081-090012-Provision of Mobile Veterinary Clinics in Bajaur Agency. [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 32.986 | 29.986 | 0 | 0 | 0 | 0 | 29.986 | 0 | - |
- August - 2020 |
No Image | |
97 (OG) |
191081-090012-Provision of Mobile Veterinary Clinics in Bajaur Agency. [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 32.986 | 29.986 | 0 | 0 | 0 | 0 | 29.986 | 0 | - |
July - 2020 |
No Image | |
97 (OG) |
191081-090012-Provision of Mobile Veterinary Clinics in Bajaur Agency. [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 32.986 | 29.986 | 0 | 0 | 0 | 0 | 29.986 | 0 | - |
- May - 2021 |
No Image | |
97 (OG) |
191081-090012-Provision of Mobile Veterinary Clinics in Bajaur Agency. [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 32.986 | 29.986 | 0 | 0 | 0 | 0 | 29.986 | 0 | - |
- April - 2021 |
No Image | |
97 (OG) |
191081-090012-Provision of Mobile Veterinary Clinics in Bajaur Agency. [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 32.986 | 29.986 | 0 | 0 | 0 | 0 | 29.986 | 0 | - |
- March - 2021 |
No Image | |
97 (OG) |
191081-090012-Provision of Mobile Veterinary Clinics in Bajaur Agency. [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 32.986 | 29.986 | 0 | 0 | 0 | 0 | 29.986 | 0 | - |
- February - 2021 |
No Image | |
97 (OG) |
191081-090012-Provision of Mobile Veterinary Clinics in Bajaur Agency. [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 32.986 | 29.986 | 0 | 0 | 0 | 0 | 29.986 | 0 | - |
- January - 2021 |
No Image | |
97 (OG) |
120626-Construction of Residences & Bachelor Hostel in all District Headquarters for Govt servants in Khyber Pakhtunkhwa. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 62.375 | 62.231 | 0.078 | 0.078 | 0.078 | 0.078 | 62.309 | 0.066 | 100% |
100% December - 2018 |
Completed & H/O. |
No Image |
1) Category-III residence, Bannu | |||||||||||||||||||
97 (OG) |
120626-Construction of Residences & Bachelor Hostel in all District Headquarters for Govt servants in Khyber Pakhtunkhwa. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 62.375 | 62.231 | 0.078 | 0.078 | 0.078 | 0.078 | 62.309 | 0.066 | 100% |
100% November - 2018 |
Completed & H/O. |
No Image |
1) Category-III residence, Bannu | |||||||||||||||||||
97 (OG) |
120626-Construction of Residences & Bachelor Hostel in all District Headquarters for Govt servants in Khyber Pakhtunkhwa. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 62.375 | 62.231 | 0.078 | 0.078 | 0.078 | 0.078 | 62.309 | 0.066 | 100% |
100% November - 2018 |
Completed & H/O. |
No Image |
1) Category-III residence, Bannu | |||||||||||||||||||
97 (OG) |
120626-Construction of Residences & Bachelor Hostel in all District Headquarters for Govt servants in Khyber Pakhtunkhwa. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 62.375 | 62.231 | 0.078 | 0.078 | 0.078 | 0.078 | 62.309 | 0.066 | 100% |
100% April - 2019 |
Completed & H/O. |
No Image |
1) Category-III residence, Bannu | |||||||||||||||||||
97 (OG) |
120626-Construction of Residences & Bachelor Hostel in all District Headquarters for Govt servants in Khyber Pakhtunkhwa. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 62.375 | 62.231 | 0.078 | 0.078 | 0.078 | 0.078 | 62.309 | 0.066 | 100% |
100% March - 2019 |
Completed & H/O. |
No Image |
1) Category-III residence, Bannu | |||||||||||||||||||
97 (OG) |
120626-Construction of Residences & Bachelor Hostel in all District Headquarters for Govt servants in Khyber Pakhtunkhwa. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 62.375 | 62.231 | 0.078 | 0.078 | 0.078 | 0.078 | 62.309 | 0.066 | 100% |
100% March - 2019 |
Completed & H/O. |
No Image |
1) Category-III residence, Bannu | |||||||||||||||||||
97 (OG) |
120626-Construction of Residences & Bachelor Hostel in all District Headquarters for Govt servants in Khyber Pakhtunkhwa. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 62.375 | 62.231 | 0.078 | 0.078 | 0.078 | 0.078 | 62.309 | 0.066 | 100% |
100% February - 2019 |
Completed & H/O. |
No Image |
1) Category-III residence, Bannu | |||||||||||||||||||
97 (OG) |
120626-Construction of Residences & Bachelor Hostel in all District Headquarters for Govt servants in Khyber Pakhtunkhwa. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 62.375 | 62.231 | 0.078 | 0.078 | 0.078 | 0.078 | 62.309 | 0.066 | 100% |
100% January - 2019 |
Completed & H/O. |
No Image |
1) Category-III residence, Bannu | |||||||||||||||||||
97 (OG) |
120626-Construction of Residences & Bachelor Hostel in all District Headquarters for Govt servants in Khyber Pakhtunkhwa. |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 31.391 | 18.5 | 4 | 4 | 4 | 4 | 22.5 | 8.891 | 72% |
72% December - 2018 |
Main building - flooring, BW and joinery in progress. |
No Image |
Construction of Bachelor Hostel (6 suits) in District Buner PK-79 | |||||||||||||||||||
97 (OG) |
120626-Construction of Residences & Bachelor Hostel in all District Headquarters for Govt servants in Khyber Pakhtunkhwa. |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 31.391 | 18.5 | 4 | 4 | 4 | 4 | 22.5 | 8.891 | 72% |
72% November - 2018 |
Main building - flooring, BW and joinery in progress. |
No Image |
Construction of Bachelor Hostel (6 suits) in District Buner PK-79 | |||||||||||||||||||
97 (OG) |
120626-Construction of Residences & Bachelor Hostel in all District Headquarters for Govt servants in Khyber Pakhtunkhwa. |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 31.391 | 18.5 | 4 | 4 | 4 | 4 | 22.5 | 8.891 | 72% |
72% November - 2018 |
Main building - flooring, BW and joinery in progress. |
No Image |
Construction of Bachelor Hostel (6 suits) in District Buner PK-79 | |||||||||||||||||||
97 (OG) |
120626-Construction of Residences & Bachelor Hostel in all District Headquarters for Govt servants in Khyber Pakhtunkhwa. |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 31.391 | 18.5 | 9 | 9 | 9 | 4 | 22.5 | 3.891 | 88% |
72% April - 2019 |
Main building - flooring, BW and joinery in progress. |
No Image |
Construction of Bachelor Hostel (6 suits) in District Buner PK-79 | |||||||||||||||||||
97 (OG) |
120626-Construction of Residences & Bachelor Hostel in all District Headquarters for Govt servants in Khyber Pakhtunkhwa. |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 31.391 | 18.5 | 4 | 4 | 4 | 4 | 22.5 | 8.891 | 72% |
72% March - 2019 |
Main building - flooring, BW and joinery in progress. Demand Rs.5 m for completion. |
No Image |
Construction of Bachelor Hostel (6 suits) in District Buner PK-79 | |||||||||||||||||||
97 (OG) |
120626-Construction of Residences & Bachelor Hostel in all District Headquarters for Govt servants in Khyber Pakhtunkhwa. |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 31.391 | 18.5 | 4 | 4 | 4 | 4 | 22.5 | 8.891 | 72% |
72% March - 2019 |
Main building - flooring, BW and joinery in progress. Demand Rs.5 m for completion. |
No Image |
Construction of Bachelor Hostel (6 suits) in District Buner PK-79 | |||||||||||||||||||
97 (OG) |
120626-Construction of Residences & Bachelor Hostel in all District Headquarters for Govt servants in Khyber Pakhtunkhwa. |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 31.391 | 18.5 | 4 | 4 | 4 | 4 | 22.5 | 8.891 | 72% |
72% February - 2019 |
Main building - flooring, BW and joinery in progress.
Demand Rs.5 m for completion . |
No Image |
Construction of Bachelor Hostel (6 suits) in District Buner PK-79 | |||||||||||||||||||
97 (OG) |
120626-Construction of Residences & Bachelor Hostel in all District Headquarters for Govt servants in Khyber Pakhtunkhwa. |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 31.391 | 18.5 | 4 | 4 | 4 | 4 | 22.5 | 8.891 | 72% |
72% January - 2019 |
Main building - flooring, BW and joinery in progress. Deamnd Rs. 5 M |
No Image |
Construction of Bachelor Hostel (6 suits) in District Buner PK-79 | |||||||||||||||||||
97 (OG) |
120626-Construction of Residences & Bachelor Hostel in all District Headquarters for Govt servants in Khyber Pakhtunkhwa. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 37.447 | 37.776 | 0 | 0 | 0 | 0 | 37.776 | 0 | - |
100% December - 2018 |
Completed. |
No Image |
1) Bachelor Hostel (6 units)
2) Cat-III Residence (1 No) | |||||||||||||||||||
97 (OG) |
120626-Construction of Residences & Bachelor Hostel in all District Headquarters for Govt servants in Khyber Pakhtunkhwa. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 37.447 | 37.776 | 0 | 0 | 0 | 0 | 37.776 | 0 | - |
100% November - 2018 |
Completed. |
No Image |
1) Bachelor Hostel (6 units)
2) Cat-III Residence (1 No) | |||||||||||||||||||
97 (OG) |
120626-Construction of Residences & Bachelor Hostel in all District Headquarters for Govt servants in Khyber Pakhtunkhwa. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 37.447 | 37.776 | 0 | 0 | 0 | 0 | 37.776 | 0 | - |
100% November - 2018 |
Completed. |
No Image |
1) Bachelor Hostel (6 units)
2) Cat-III Residence (1 No) | |||||||||||||||||||
97 (OG) |
120626-Construction of Residences & Bachelor Hostel in all District Headquarters for Govt servants in Khyber Pakhtunkhwa. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 37.447 | 37.776 | 0 | 0 | 0 | 0 | 37.776 | 0 | - |
100% April - 2019 |
Completed. |
No Image |
1) Bachelor Hostel (6 units)
2) Cat-III Residence (1 No) | |||||||||||||||||||
97 (OG) |
120626-Construction of Residences & Bachelor Hostel in all District Headquarters for Govt servants in Khyber Pakhtunkhwa. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 37.447 | 37.776 | 0 | 0 | 0 | 0 | 37.776 | 0 | - |
100% March - 2019 |
Completed. |
No Image |
1) Bachelor Hostel (6 units)
2) Cat-III Residence (1 No) | |||||||||||||||||||
Pages : 1 2 3 4 5 |