Report Date:
July 27, 2025
Infrastructure Type:
Road
Total Damages:
1
Reported by:
Muhammad Riaz
(XEN H/W D.I.Khan)
Affected Roads
Total Damages
Damaged Length
(KM)
Fully Restored
Partially Restored
Not Restored
Road Damages
S# | Road Name | Total Length | Status | Damaged Length | Dated |
---|---|---|---|---|---|
1 | Kerri Bakhtiyar road, Tehsil daraban | 0.3 (KM) | Not restored | 0.3 (KM) | Jul 18, 2025 |