Stories
Loading...

Dir Upper Damages Detail - Monsoon (2025)

Report Date: July 27, 2025 Infrastructure Type: Road Total Damages: 20
Reported by:
Engr. Sohail Idrees (Managing Director PKHA) , Najm Ud Din (XEN DIR UPPER)
15
Affected Roads
20
Total Damages
95.842
Damaged Length (KM)
2
Fully Restored
18
Partially Restored
0
Not Restored
Road Damages
S# Road Name Total Length Status Damaged Length Dated
1 Chukyatan Patrak S-16 (2 Damages) 34 (KM) 1 Fully restored 0.7 (KM) Jul 15, 2025
Remarks: Fully Restored through available contractor
Reported by: Managing Director PKHA
2 Partially restored 0.2 (KM) Jul 06, 2025
Remarks: Slips and debris have been removed from road surface..Retaining walls previously damage in moon soon,has worsen which requires restoration
Reported by: Managing Director PKHA
2 Patrak kumrat Road (Non-P) (2 Damages) 44 (KM) 1 Fully restored 0.200 (KM) Jul 15, 2025
Remarks: Fully Restored through available contractor
Reported by: Managing Director PKHA
2 Partially restored 4.5 (KM) Jul 06, 2025
Remarks: 01 culvert damage at km 28.from thall to kumrat is jeepable road.some reaches has been submerged in water when water level rises. the road section is part of the ADP scheme construction of road from Patrak to Thall kumrat 44 km district dir upper.The amount mentioned is the tentative cost for the flood damage portion 
Reported by: Managing Director PKHA
3 Nihagdara Salobag Road 7 (KM) Partially restored .012 (KM) Jul 14, 2025
4 Nihag Dara Phase II Road (3 Damages) 20 (KM) 1 Partially restored .01 (KM) Jul 14, 2025
2 Partially restored .02 (KM) Jul 08, 2025
3 Partially restored 15 (KM) Jul 07, 2025
5 karo Dara main Pashta Balkore Road 15 (KM) Partially restored 7 (KM) Jul 14, 2025
6 kakad Tangi Road Wari 7 (KM) Partially restored 3 (KM) Jul 10, 2025
7 Nihagdara Bandai dolar Road Wari 6 (KM) Partially restored 3 (KM) Jul 10, 2025
8 Wari Manzi road 5 (KM) Partially restored 2 (KM) Jul 09, 2025
9 Gal pashta Road wari 5 (KM) Partially restored 3 (KM) Jul 09, 2025
10 karo dara gulibagh karkabanj raod wari 15 (KM) Partially restored 8 (KM) Jul 09, 2025
11 Daskor Badali Maskari Road Wari 12 (KM) Partially restored 10 (KM) Jul 08, 2025
12 Matar Shawkand Road (2 Damages) 8 (KM) 1 Partially restored 8 (KM) Jul 07, 2025
2 Partially restored 6 (KM) Jul 07, 2025
13 Osuri Dara Main Road 10 (KM) Partially restored 5 (KM) Jul 07, 2025
14 Nihag Dara Phase I Road 27 (KM) Partially restored 20 (KM) Jul 07, 2025
15 Gwaldai Dara main Road at Pingass 0.2 (KM) Partially restored 0.2 (KM) Jul 02, 2025
Remarks: About 200 meters road portion has been washedaway by recent flood which is temporary restored for light traffic need urgent rehabilitation
Reported by: XEN DIR UPPER
CWD