Haripur Damages Detail - Monsoon (2025)

Report Date: July 27, 2025 Infrastructure Type: Road Total Damages: 8
Reported by:
Engr. Sohail Idrees (Managing Director PKHA) , Muhammad Zahid (XEN H/W HARIPUR)
8
Affected Roads
8
Total Damages
50.068
Damaged Length (KM)
0
Fully Restored
7
Partially Restored
1
Not Restored
Road Damages
S# Road Name Total Length Status Damaged Length Dated
1 S-12 Haripur Chppar Chandur Shara-e-Tanawal to 72 (KM) Partially restored 0.030 (KM) Jul 06, 2025
Remarks: Vented Causeway has been damaged and the wingwall downstream needs to be restored. The Cause Way has been opened manually by labour.
Reported by: Managing Director PKHA
2 Tarnawa to Kohala Bala 35 (KM) Partially restored 14 (KM) Jul 06, 2025
Remarks: The amount is for clearance of debris, sli[ps,ersosion and leveling of Kacha Road only. The boulders on site have been removed Primaly with help of locals,
Reported by: Managing Director PKHA
3 Ghazi-Serikot-Panian Road (S-1) 40 (KM) Not restored 0.038 (KM) Jul 06, 2025
Remarks: The restoration should be done at the earliest to avoid any damage to the remaining road structure.
Reported by: Managing Director PKHA
4 Haripur Sarai Nimat Khan road 14 (KM) Partially restored 14 (KM) Jul 02, 2025
Remarks: Retaining structure damaged.
Reported by: XEN H/W HARIPUR
5 Karrach Road 4 (KM) Partially restored 4 (KM) Jul 02, 2025
Remarks: Retaining structure damaged & road is partially opened for traffic.
Reported by: XEN H/W HARIPUR
6 Talhad Road. 3 (KM) Partially restored 3 (KM) Jul 02, 2025
Remarks: Retaining structure damaged on said road. An amount of Rs. 5.000 (M) is restoration of damaged structure.
Reported by: XEN H/W HARIPUR
7 Nartopa Road 12 (KM) Partially restored 12 (KM) Jul 02, 2025
Remarks: Retaining wall along road side damaged due to heavy rain fall. An amount of Rs. 2.500 (M) required for restoration of damaged structure.
Reported by: XEN H/W HARIPUR
8 Sahki Khenian road 7 (KM) Partially restored 03 (KM) Jul 02, 2025
Remarks: Landslide occurred at the site due to heavy rainfall. The debris has been partially cleared and the road has been restored for traffic
Reported by: XEN H/W HARIPUR