Stories
Loading...

Schemes

Reset
S.No ADP Number Scheme Code Year Scheme Name Sector Name Local Cost Previous Expenditure Revenue Allocation Total Allocation Views Detail
1421 1710 191852 2022 190253 - Construction of RCC Bridges in Merged Areas. [MA]-(A) /PDWP /04-12-2018 Roads 828.956 18.095 0.000 20.000 44 View
1422 1711 193173 2022 Construction of approach roads to mineral bearing areas (A) BOD/15/09/2017 [FDA]-(A) /BOD /15-09-2017 Roads 195.000 97.648 0.000 0.001 41 View
1423 1712 200173 2022 Replacement of Steel Bridges Installed by Pak Army with RCC Pre Stressed Bridges in Merged Areas-(B) / / Roads 800.000 7.897 0.000 38.561 59 View
1424 1573 100429 2022 Construction of 13 Nos RCC Bridges in Khyber Pakhtunkhwa.-(A) /PDWP /22-01-2015 Roads 972.399 742.637 0.000 40.000 33 View
1425 1574 110388 2022 Constn: of Abutments and Launching of Canadian Steel Bridges provided to Pak Army for Khyber Pakhtunkhwa (CIDA Assisted).-(A) /PDWP /23-12-2016 Roads 764.000 221.450 0.000 40.000 34 View
1426 1575 130391 2022 F/S, Detailed Design and Supervision for RCC Bridges in Khyber Pakhtunkhwa.-(A) /DDWP /02-04-2014 Roads 100.000 10.494 0.000 40.000 48 View
1427 1576 130510 2022 Feasibiilty Study, Detailed Designing and Supervision of various roads of C&W Khyber Pakhtunkhwa.-(A) /DDWP /26-12-2013 Roads 100.000 7.698 0.000 40.000 54 View
1428 1577 130574 2022 Impt/ Rehabilitation & Upgradation of 300 KM roads in Khyber Pakhtunkhwa-(A) /PDWP /25-03-2015 Roads 3666.384 3312.410 0.000 40.000 34 View
1429 1578 140974 2022 Construction / Widening / Improvement / Rehabilitation of Roads and Bridges (on need basis) in Khyber Pakhtunkhwa-(A) /PDWP /28-01-2015 Roads 1856.516 1459.727 0.000 40.000 48 View
1430 1579 160249 2022 Provincial Roads Rehabilitation Project "Under PKHA Portfolio" (ADB Assisted).-(A) /CDWP /15-02-2021 Roads 4353.160 2123.976 0.000 370.000 54 View
CWD