Stories
Loading...

Schemes

Reset
S.No ADP Number Scheme Code Year Scheme Name Sector Name Local Cost Previous Expenditure Revenue Allocation Total Allocation Views Detail
1461 1302 210501 2022 Strengthening of C&W Department -(A) /PDWP /27-08-2021 Roads 476.000 0.316 20.000 20.000 52 View
1462 1303 210448 2022 F/S & Designing of Mega Projects (Buildings) in Khyber Pakhtunkhwa-(B) / / Roads 500.000 0.000 0.000 60.000 49 View
1463 1603 220752 2022 Construction of warai bazar bypass (PPP) (Cost=700M)-(B) / / Roads 0.005 0.000 0.000 0.001 29 View
1464 1604 220753 2022 Construction of Expressway from Swat Expressway to Ambela Buner.(Cost=25000M)-(B) / / Roads 0.005 0.000 0.000 0.001 31 View
1465 1605 220828 2022 F/S, Design, and Construction of Khawazakhela Besham Motorway-(B) / / Roads 0.005 0.000 0.001 0.002 37 View
1466 1606 220829 2022 Feasibility Study, Design of Link Motorway from Swat Motorway at Karnel Sher Khan Interchange to Jehangira (N-5) through PPP mode-(B) / / Roads 0.005 0.000 0.001 0.002 51 View
1467 1607 220830 2022 Construction of Peshawar - D.I. Khan motorway.-(B) / / Roads 0.005 0.000 0.000 0.001 46 View
1468 1608 220831 2022 F/S of Motorway Link from Charsadda interchange (M-1) to Katlang (New proposed Interchange at Swat Motorway) through PPP Mode-(B) / / Roads 0.005 0.000 0.001 0.002 41 View
1469 1609 220832 2022 Provision of VGF, Land acquisition, Utility & resettlement component and construction of Expressway from Swat Expressway to District Buner.-(B) / / Roads 0.005 0.000 0.000 0.001 34 View
1470 1654 191706 2021 140045-03 No. RCC Bridge in Tirah Maidan, Khyber Agency, Bagh Maindan, Bor Baght Toor Toot. [MA]-(A) /FDWP /02-04-2015 Roads 80.234 70.545 0.000 9.689 45 View
CWD