Stories
Loading...

Schemes

Reset
S.No ADP Number Scheme Code Year Scheme Name Sector Name Local Cost Previous Expenditure Revenue Allocation Total Allocation Views Detail
2291 1754 191808 2020 170439 - Cosnt. of shingle Track in SWA. [MA]-(A) /FDWP /20-09-2017 Roads 96.340 13.454 0.000 82.886 32 View
2292 1755 191818 2020 180577 - Rehabilitation of existing roads in District South Waziristan. [MA]-(A) /PDWP /22-04-2019 Roads 56.946 2.547 0.000 54.399 61 View
2293 1756 191829 2020 190327 - Construction of 6-Kms Black Top Road from Dashka to Razin Haris Koroona Tehsil Makin District South Waziristan. [MA]-(A) /PDWP /- Roads 194.394 32.500 0.000 25.000 36 View
2294 1757 195294 2020 Improvement of Tanai- Gulkatch Road (42 Km) (AIP)-(A) /PDWP /- Roads 805.000 0.000 0.000 50.000 63 View
2295 1758 195298 2020 Construction of balance portion of Road from Inzar Gori khel to Ladha 20-Kms District South Waziristan (AIP)-(A) /PDWP /18-11-2019 Roads 253.150 0.000 0.000 100.000 58 View
2296 1759 200125 2020 Construction of 5Km BTR from Shadman Road to Zarwar Khan Kot Ghawkha Laman Tehsil Wana-(A) /PDWP /04-02-2020 Roads 126.770 0.000 0.000 30.000 61 View
2297 1760 191717 2020 170169-Construction of Black Topped Roads in Miran Shah Sub Divison, NWA. [MA]-(A) /FDWP /10-10-2017 Roads 199.950 169.929 0.000 30.021 50 View
2298 1761 191772 2020 170366-Construction of Black Topped Roads in Razmak Sub Divison, NWA. [MA]-(A) /FDWP /10-10-2017 Roads 199.169 175.894 0.000 23.275 27 View
2299 1762 191783 2020 160171-Construction of Black Topped Roads in NWA, Phase-II. [MA]-(A) /FDWP /03-01-2017 Roads 359.850 320.719 0.000 39.131 53 View
2300 1763 191800 2020 180337 - Construction and Black Topping of Link Roads in District North Waziristan. [MA]-(A) /FDWP /05-04-2019 Roads 282.120 100.000 0.000 30.000 42 View
CWD