Stories
Loading...

Schemes

Reset
S.No ADP Number Scheme Code Year Scheme Name Sector Name Local Cost Previous Expenditure Revenue Allocation Total Allocation Views Detail
3581 1637 251516 2025 F/S & Construction of 05km BTR road from Khanzada korona to Jamal Kot TSD Lakki-(B) / / Roads 300.000 0.000 0.000 10.000 21 View
3582 1638 251518 2025 F/S for Construction Of 10KM Black Top Road From Bakhta Abad To Imran Khel Pewasar Ping Area TSD Jandola District Tank.-(B) / / Roads 5.000 0.000 0.000 1.000 21 View
3583 1639 251529 2025 Construction of Main Zarmilana Road to Haji Gul Suleman Khel Korona (7-KM)-(B) / / Roads 350.000 0.000 0.000 70.000 37 View
3584 1640 251566 2025 F/S for Construction of 5 KM Black Top Road from Rizwan Dani Khel Korona to Khaleem Malak khel Lower Waziristan-(B) / / Roads 5.000 0.000 0.000 0.001 22 View
3585 1641 251572 2025 Construction of BTR from main maintoy market to Abid ullah Kot SWTD (Lower)-(B) / / Roads 200.000 0.000 0.000 0.001 19 View
3586 1642 251576 2025 D-Chock Nermuhammad Road to Ser Doog Kurm Ghari 15 KM Tehsil Mirali North Wazirstan-(B) / / Roads 350.000 0.000 0.000 0.001 24 View
3587 1643 251577 2025 Construction / Rehabilitation of Road from Rescue 1122 Center Chappari to Musa Khel via Mateen Khel Killa Sub Division Wazir Bannu (10 KM).-(B) / / Roads 250.000 0.000 0.000 0.001 22 View
3588 1644 251580 2025 Construction of 5 km Main Wana bypass bamrai to mati kaka chowk South Waziristan Lower-(B) / / Roads 320.000 0.000 0.000 0.001 23 View
3589 1645 251583 2025 Construction of Black Topped Road from Smal to Ghundakal Saruna via Pangay (14 Km), including cost of dislocated machinery, District South Waziristan Upper-(B) / / Roads 1300.000 0.000 0.000 0.001 21 View
3590 1646 251584 2025 Construction and Black Topping of Road from Sam Masap Mella Dara Malik Shahi Area via Mashta (45 Km), connecting Asman Manza, District South Waziristan Upper-(B) / / Roads 2860.000 0.000 0.000 0.001 23 View
CWD