Stories
Loading...

Schemes

Reset
S.No ADP Number Scheme Code Year Scheme Name Sector Name Local Cost Previous Expenditure Revenue Allocation Total Allocation Views Detail
2821 1809 191710 2019 170141-Construction & Black Topping of Ghuzgharh Road Phase-II in Orakzai Agency. [MA]-(A) /FDWP /20-09-2017 Roads 61.500 36.500 0.000 25.000 53 View
2822 1810 191711 2019 170142- Rehabilitation of Road in Lower Sub Division of District Orakzai. (5 kms) [MA]-(A) /DDWP /28-03-2019 Roads 48.679 0.000 0.000 10.728 66 View
2823 1811 191712 2019 150178-Construction of BT Roads in Sarwekai & Wana Sub Division in SWA. [MA]-(A) /FDWP /23-02-2016 Roads 194.830 181.300 0.000 4.830 74 View
2824 1812 191713 2019 140332-Construction of Road from Shahoor to Toormandi via Pastai Khawazai 10 Kms in SWA. (Umbrella) [MA]-(A) /FDWP /31-05-2016 Roads 177.326 142.000 0.000 10.326 60 View
2825 1813 191714 2019 140336-Construction of 5 Kms BT Roads in SWA. (Umbrella) [MA]-(A) /FDWP /24-01-2018 Roads 80.548 60.200 0.000 20.348 65 View
2826 1814 191715 2019 160015-Construction of New Black Topped Roads & Rehab: of existing roads in FR D.I.Khan. [MA]-(A) /FDWP /16-02-2017 Roads 199.301 189.901 0.000 9.400 43 View
2827 1815 191716 2019 160048-Construction of B/T Road in Sarwekai & WANA Sub Division, SWA. [MA]-(A) /FDWP /10-01-2017 Roads 167.540 125.796 0.000 29.204 71 View
2828 1816 191717 2019 170169-Construction of Black Topped Roads in Miran Shah Sub Divison, NWA. [MA]-(A) /FDWP /10-10-2017 Roads 199.950 135.137 0.000 34.813 62 View
2829 1817 191718 2019 170170-Construction of Black Topped Roads in Mir Ali Sub Divison, NWA. [MA]-(A) /FDWP /10-10-2017 Roads 181.589 151.187 0.000 30.402 60 View
2830 1818 191719 2019 170171-M&R / Rehabilitation of Existing Black Topped Roads in NWA. [MA]-(A) /FDWP /10-10-2017 Roads 99.850 75.000 0.000 14.850 60 View
CWD