Stories
Loading...

Schemes

Reset
S.No ADP Number Scheme Code Year Scheme Name Sector Name Local Cost Previous Expenditure Revenue Allocation Total Allocation Views Detail
1511 1695 191779 2021 140334-Black Topping of Roads in District South Waziristan, Phase II (25 Kms). (Umbrella). [MA]-(A) /PDWP /03-03-2022 Roads 657.361 248.480 0.000 66.000 48 View
1512 1696 191780 2021 140322-Construction of 16 Kms Black Topped Road in SWA. [MA]-(A) /PDWP /22-05-2019 Roads 433.783 133.691 0.000 70.000 50 View
1513 1697 191782 2021 060093-Constn: of Black Topped Road From Telephone Exchange to SM Rocha, FR Bannu. (10 Kms) (Revised) [MA]-(A) /FDWP /09-06-2017 Roads 284.189 178.987 0.000 40.100 38 View
1514 1698 191783 2021 160171-Construction of Black Topped Roads in NWA, Phase-II. [MA]-(A) /FDWP /03-01-2017 Roads 359.850 354.850 0.000 5.000 41 View
1515 1699 191784 2021 180162- Construction & black topping of roads in District Orakzai. [MA]-(A) /PDWP /17-09-2019 Roads 186.660 42.587 0.000 59.670 54 View
1516 1700 191785 2021 180121 - Construction & blacktopping of road in Tehsil Jamrud and landikotal District Khyber. [MA]-(A) /PDWP /17-09-2019 Roads 136.814 53.990 0.000 40.000 54 View
1517 1701 191786 2021 180122 - Construction & blacktopping road in Tirah Maidan and Bara District Khyber. [MA]-(A) /PDWP /05-04-2019 Roads 199.030 115.005 0.000 40.000 38 View
1518 1702 191787 2021 180123 - Rehabilitation, Construction and Improvement of Road Network in District Khyber. [MA]-(A) /DDWP /05-04-2019 Roads 98.180 69.228 0.000 28.952 73 View
1519 1703 191788 2021 180095 - Construction of Blacktop Road in Ladha District South Waziristan. [MA]-(A) /PDWP /22-04-2019 Roads 148.776 143.776 0.000 5.000 42 View
1520 1704 191789 2021 180096 - Construction of Blacktop Road in Sarwekai, District South Waziristan. [MA]-(A) /PDWP /22-04-2019 Roads 149.324 105.000 0.000 44.324 39 View
CWD
Choose Theme
Default Theme
Brown Theme
Blue Theme
Violet Theme
Dark Red Theme