Dir Upper Detail Monsoon (2025)

Report Date: July 07, 2025 Infrastructure Type: Road Total Damages: 9
7
Affected Infrastructures
9
Total Damages
73.9
Damaged Length (KM)
0
Fully Restored
8
Partially Restored
1
Not Restored
104.46 M
Total Cost (PKR)
Reporting Officers
Executive Engineer
XEN DIR UPPER
7 damage(s) reported
Managing Director
Managing Director PKHA
2 damage(s) reported
Infrastructure Damages
S# Road Name Type Total Length Status Damaged Length Restoration Cost Rehabilitation Cost Date Reported
1 Nihag Dara Phase II Road (2 Damages) Road 20 (KM) Not restored 15 (KM) 1.00 M 2.00 M Jul 07, 2025
Partially restored 15 (KM) 0.80 M 1.50 M Jul 07, 2025
2 Matar Shawkand Road (2 Damages) Road 8 (KM) Partially restored 8 (KM) 0.30 M 1.00 M Jul 07, 2025
Partially restored 6 (KM) 0.50 M 1.50 M Jul 07, 2025
3 Osuri Dara Main Road Road 10 (KM) Partially restored 5 (KM) 0.20 M 1.00 M Jul 07, 2025
4 Nihag Dara Phase I Road Road 27 (KM) Partially restored 20 (KM) 0.50 M 1.00 M Jul 07, 2025
5 Chukyatan Patrak S-16 Road 34 (KM) Partially restored 0.2 (KM) 1.00 M 41.60 M Jul 06, 2025
Remarks: Slips and debris have been removed from road surface..Retaining walls previously damage in moon soon,has worsen which requires restoration
6 Patrak kumrat Road (Non-P) Road 44 (KM) Partially restored 4.5 (KM) 9.03 M 9.03 M Jul 06, 2025
Remarks: 01 culvert damage at km 28.from thall to kumrat is jeepable road.some reaches has been submerged in water when water level rises. the road section is part of the ADP scheme construction of road from Patrak to Thall kumrat 44 km district dir upper.The amount mentioned is the tentative cost for the flood damage portion 
7 Gwaldai Dara main Road at Pingass Road 0.2 (KM) Partially restored 0.2 (KM) 2.50 M 30.00 M Jul 02, 2025
Remarks: About 200 meters road portion has been washedaway by recent flood which is temporary restored for light traffic need urgent rehabilitation