Report Date:
August 21, 2025
Infrastructure Type:
Road
Total Damages:
113
Reported by:
Engr. Saleh Dar
(XEN Swat II Matta)
Engr. Iftikhar Qayyum
(XEN Swat I Saidu Sharif)
Engr. Sohail Idrees
(Managing Director PKHA)
Affected Roads
Total Damages
Damaged Length
(KM)
Fully Restored
Partially Restored
Not Restored
Road Damages Overview
S# | Road Name & Location | Total Length | Status | Damaged Length | Damage Coordinates | Date Reported |
---|---|---|---|---|---|---|
1
|
Sperdar Sharo Tangai Road Sijbanr
|
3
(KM) |
Partially restored |
0.35
(KM) |
Aug 21, 2025
12:18 PM |
|
Remarks:
Restoration work in progress
Reported by:
XEN Swat II Matta
|
||||||
2
|
Chatorya School Road Shawar
|
6
(KM) |
Partially restored |
0.5
(KM) |
Aug 21, 2025
09:45 AM |
|
Remarks:
Restoration work in progress
Reported by:
XEN Swat II Matta
|
||||||
3
|
Removal of slips UCs Sakhra, Darmai & Asharay Swat
|
10
(KM) |
Fully restored |
5
(KM) |
Aug 21, 2025
08:43 AM |
|
Remarks:
Restoration work in progress
Reported by:
XEN Swat II Matta
|
||||||
4
|
Kandawgai School Road
|
4
(KM) |
Partially restored |
0.6
(KM) |
Aug 21, 2025
08:18 AM |
|
Remarks:
Restoration work in progress
Reported by:
XEN Swat II Matta
|
||||||
5
|
KARA RASHAKAI TARAKO BELA AND BENAWAR ROAD KABAL
No coordinates available
|
0.450
(KM) |
Partially restored |
0.45
(KM) |
No damage coordinates |
Aug 21, 2025
07:10 AM |
6
|
PIRPATAY ROAD KABAL
No coordinates available
|
0.225
(KM) |
Partially restored |
0.225
(KM) |
No damage coordinates |
Aug 21, 2025
06:58 AM |
7
|
JABAGAI KHWAR ROAD KABAL
No coordinates available
|
3.0
(KM) |
Partially restored |
0.3
(KM) |
No damage coordinates |
Aug 21, 2025
06:33 AM |
8
|
Dughlay shopin Road Shawar
|
1
(KM) |
Partially restored |
0.3
(KM) |
Aug 20, 2025
02:34 PM |
|
Remarks:
Restoration work in progress
Reported by:
XEN Swat II Matta
|
||||||
9
|
Rang Patay Road Gwalerai
|
1
(KM) |
Partially restored |
0.2
(KM) |
Aug 20, 2025
02:25 PM |
|
Remarks:
Restoration work in progress
Reported by:
XEN Swat II Matta
|
||||||
10
|
Azad Banda Road Darmai
|
3
(KM) |
Partially restored |
0.2
(KM) |
Aug 20, 2025
02:18 PM |
|
Remarks:
Restoration work in progress
Reported by:
XEN Swat II Matta
|
||||||
11
|
Kanatay Tajay Road Gwalerai
|
5
(KM) |
Partially restored |
0.6
(KM) |
Aug 20, 2025
02:08 PM |
|
Remarks:
Restoration work in progress
Reported by:
XEN Swat II Matta
|
||||||
12
|
Lalkoo Sarkhuna Road Sakhra
|
1
(KM) |
Partially restored |
0.05
(KM) |
Aug 20, 2025
02:01 PM |
|
Remarks:
Restoration work in progress
Reported by:
XEN Swat II Matta
|
||||||
13
|
Gal Shah Road UC Asharay
No coordinates available
|
2
(KM) |
Partially restored |
0.03
(KM) |
Aug 20, 2025
01:46 PM |
|
Remarks:
Restoration work in progress
Reported by:
XEN Swat II Matta
|
||||||
14
|
Shingar tan Road Gwalerai
|
2
(KM) |
Partially restored |
0.05
(KM) |
Aug 20, 2025
01:39 PM |
|
Remarks:
Restoration work in progress
Reported by:
XEN Swat II Matta
|
||||||
15
|
Logoy to Fatima road Shawar
|
6
(KM) |
Partially restored |
0.2
(KM) |
Aug 20, 2025
01:17 PM |
|
Remarks:
Restoration work in progress
Reported by:
XEN Swat II Matta
|
||||||
16
|
Dob Rashakai
No coordinates available
|
3.0
(KM) |
Fully restored |
0.3
(KM) |
No damage coordinates |
Aug 20, 2025
07:12 AM |
17
|
Tarkonella Road Kabal
No coordinates available
|
3.0
(KM) |
Partially restored |
0.5
(KM) |
No damage coordinates |
Aug 20, 2025
06:41 AM |
Remarks:
Road is badly damaged by recent Flash Flood
Reported by:
XEN Swat I Saidu Sharif
|
||||||
18
|
Ghazi Abaid Chur road
No coordinates available
|
5
(KM) |
Partially restored |
1
(KM) |
No damage coordinates |
Aug 20, 2025
06:15 AM |
Remarks:
Restoration under Process
Reported by:
XEN Swat I Saidu Sharif
|
||||||
19
|
Chatorya Spero Rroad UC Shawar
No coordinates available
|
4
(KM) |
Partially restored |
0.5
(KM) |
Aug 19, 2025
10:20 AM |
|
Remarks:
Restoration work in progress
Reported by:
XEN Swat II Matta
|
||||||
20
|
Chur saghardam road
No coordinates available
|
2.0
(KM) |
Partially restored |
0.3
(KM) |
No damage coordinates |
Aug 19, 2025
09:56 AM |
Remarks:
Land Slidings
Reported by:
XEN Swat I Saidu Sharif
|
||||||
21
|
DARDYAL ROAD
No coordinates available
|
3
(KM) |
Fully restored |
0.3
(KM) |
Aug 19, 2025
09:37 AM |
|
Remarks:
Slips
Reported by:
XEN Swat I Saidu Sharif
|
||||||
22
|
Dardyal Chur Road
No coordinates available
|
30
(KM) |
Partially restored |
0.2
(KM) |
No damage coordinates |
Aug 19, 2025
09:31 AM |
23
|
Penawrai ROAD shahderai
|
3.0
(KM) |
Partially restored |
0.3
(KM) |
Aug 19, 2025
09:19 AM |
|
Remarks:
Land Sliding at different locations
Reported by:
XEN Swat I Saidu Sharif
|
||||||
24
|
Azad Banda road
|
10
(KM) |
Partially restored |
0.03
(KM) |
Aug 19, 2025
09:04 AM |
|
Remarks:
Restoration work in progress
Reported by:
XEN Swat II Matta
|
||||||
25
|
Kwaro Cham Road
|
0.4
(KM) |
Partially restored |
0.9
(KM) |
Aug 19, 2025
08:09 AM |
|
Remarks:
Restoration work in progress
Reported by:
XEN Swat II Matta
|
||||||
26
|
Zaray Road Shingrai
|
0.2
(KM) |
Partially restored |
0.2
(KM) |
Aug 18, 2025
08:29 PM |
|
27
|
Mingora-Jambail-Kokarai-Gokand Road 22 Km
18
|
22
(KM) |
1 Partially restored |
1
(KM) |
Aug 18, 2025
11:49 AM |
|
2 Partially restored |
0.01
(KM) |
Aug 18, 2025
11:35 AM |
||||
3 Partially restored |
0.006
(KM) |
Aug 18, 2025
11:33 AM |
||||
4 Partially restored |
0.008
(KM) |
Aug 18, 2025
11:32 AM |
||||
5 Partially restored |
0.016
(KM) |
Aug 18, 2025
11:30 AM |
||||
6 Partially restored |
0.012
(KM) |
Aug 18, 2025
11:29 AM |
||||
7 Partially restored |
0.01
(KM) |
Aug 18, 2025
11:27 AM |
||||
8 Partially restored |
0.01
(KM) |
Aug 18, 2025
11:24 AM |
||||
9 Partially restored |
0.012
(KM) |
Aug 18, 2025
11:21 AM |
||||
10 Partially restored |
0.025
(KM) |
Aug 18, 2025
11:20 AM |
||||
11 Partially restored |
0.01
(KM) |
Aug 18, 2025
11:18 AM |
||||
12 Partially restored |
0.01
(KM) |
Aug 18, 2025
11:16 AM |
||||
13 Partially restored |
0.038
(KM) |
Aug 18, 2025
11:14 AM |
||||
14 Partially restored |
0.03
(KM) |
Aug 18, 2025
11:12 AM |
||||
15 Partially restored |
0.009
(KM) |
Aug 18, 2025
11:11 AM |
||||
16 Partially restored |
0.008
(KM) |
Aug 18, 2025
11:09 AM |
||||
17 Partially restored |
0.012
(KM) |
Aug 18, 2025
11:07 AM |
||||
18 Partially restored |
1.5
(KM) |
Aug 18, 2025
11:05 AM |
||||
28
|
Baryam to Gat Road District Swat
2
|
10.5
(KM) |
1 Partially restored |
0.078
(KM) |
Aug 18, 2025
11:03 AM |
|
Remarks:
Road is completely clear for traffic flow, need immediate treatment to protect road from further damages
Reported by:
Managing Director PKHA
|
||||||
2 Fully restored |
0.043
(KM) |
Jul 07, 2025
07:44 AM |
||||
29
|
Taroko Main road (08-18-2025)
No coordinates available
|
1.0
(KM) |
Partially restored |
0.5
(KM) |
No damage coordinates |
Aug 18, 2025
09:34 AM |
Remarks:
TAROKO ROAD Restoration process is under process which is affected by today again recent flood 08-18-2025
Reported by:
XEN Swat I Saidu Sharif
|
||||||
30
|
Qalagay Road (Sliding one again)
No coordinates available
|
5.0
(KM) |
Partially restored |
0.2
(KM) |
No damage coordinates |
Aug 18, 2025
09:10 AM |
Remarks:
Restoration process was under process but recently once again rocks slided over the road.
Reported by:
XEN Swat I Saidu Sharif
|
||||||
31
|
BAGO PACHA KALAY GUL BANDA
No coordinates available
|
2
(KM) |
Partially restored |
2
(KM) |
No damage coordinates |
Aug 17, 2025
05:08 PM |
32
|
Swegalai Road
2
No coordinates available
|
.03
(KM) |
1 Partially restored |
6
(KM) |
No damage coordinates |
Aug 17, 2025
05:03 PM |
2 Partially restored |
0.03
(KM) |
No damage coordinates |
Aug 06, 2025
10:16 AM |
|||
33
|
SARBALA SHAGAI ROAD
No coordinates available
|
1
(KM) |
Partially restored |
2
(KM) |
No damage coordinates |
Aug 17, 2025
04:57 PM |
34
|
Ghakhi Bandai Road Kabal Swat
2
No coordinates available
|
06
(KM) |
1 Partially restored |
2
(KM) |
No damage coordinates |
Aug 17, 2025
04:53 PM |
2 Partially restored |
0.3
(KM) |
No damage coordinates |
Jul 23, 2025
09:40 AM |
|||
35
|
ASHAR BANR ROAD
No coordinates available
|
1
(KM) |
Partially restored |
1
(KM) |
No damage coordinates |
Aug 17, 2025
04:47 PM |
36
|
MABANR ROAD
No coordinates available
|
2
(KM) |
Partially restored |
2
(KM) |
No damage coordinates |
Aug 17, 2025
04:44 PM |
37
|
MAIN BELA ROAD
No coordinates available
|
2
(KM) |
Partially restored |
2
(KM) |
No damage coordinates |
Aug 17, 2025
04:40 PM |
38
|
SHAGAI TO ASHARAI AWARA
No coordinates available
|
1
(KM) |
Partially restored |
1
(KM) |
No damage coordinates |
Aug 17, 2025
04:34 PM |
39
|
KIMYARAI TO PINORAI
No coordinates available
|
2
(KM) |
Partially restored |
2
(KM) |
No damage coordinates |
Aug 17, 2025
04:31 PM |
40
|
SEKAI DADA ROAD
No coordinates available
|
2
(KM) |
Partially restored |
2
(KM) |
No damage coordinates |
Aug 17, 2025
04:28 PM |
41
|
GODA MANAI ROAD
No coordinates available
|
2
(KM) |
Partially restored |
2
(KM) |
No damage coordinates |
Aug 17, 2025
04:24 PM |
42
|
ARCHALAI ROAD
No coordinates available
|
2
(KM) |
Partially restored |
2
(KM) |
No damage coordinates |
Aug 17, 2025
04:19 PM |
43
|
TALL DARDYAL ROAD KABAL
No coordinates available
|
5
(KM) |
Partially restored |
5
(KM) |
No damage coordinates |
Aug 17, 2025
04:15 PM |
44
|
ASHARAY ROAD
No coordinates available
|
3
(KM) |
Partially restored |
3
(KM) |
No damage coordinates |
Aug 17, 2025
04:10 PM |
45
|
PIR PATAY ROAD
No coordinates available
|
1
(KM) |
Partially restored |
1
(KM) |
No damage coordinates |
Aug 17, 2025
04:07 PM |
46
|
DOB RASHAKI KHAZANA ROAD
No coordinates available
|
1
(KM) |
Partially restored |
0.2
(KM) |
No damage coordinates |
Aug 17, 2025
04:00 PM |
47
|
ANARBAGH ROAD
No coordinates available
|
1
(KM) |
Partially restored |
0.1
(KM) |
No damage coordinates |
Aug 17, 2025
03:55 PM |
48
|
KHANJAR TO KYAAWARA
No coordinates available
|
2
(KM) |
Partially restored |
1.3
(KM) |
No damage coordinates |
Aug 17, 2025
03:41 PM |
49
|
Surbanr Banjot Road
|
0.5
(KM) |
Partially restored |
0.5
(KM) |
Aug 17, 2025
03:19 PM |
|
50
|
Taligram Bishbanr Road
|
0.5
(KM) |
Partially restored |
0.5
(KM) |
Aug 17, 2025
03:01 PM |
|
Remarks:
fully Damaged
Reported by:
XEN Swat I Saidu Sharif
|
||||||
51
|
Sangota Bypass Road
|
0.25
(KM) |
Partially restored |
0.25
(KM) |
Aug 17, 2025
02:11 PM |
|
52
|
Mingora Road Near old Bus Stand
|
0.5
(KM) |
Partially restored |
0.5
(KM) |
Aug 17, 2025
01:59 PM |
|
53
|
Mula Baba Road
|
0.3
(KM) |
Partially restored |
0.3
(KM) |
Aug 17, 2025
01:39 PM |
|
54
|
Landikass Press Club Road
|
0.25
(KM) |
Partially restored |
0.25
(KM) |
Aug 17, 2025
01:04 PM |
|
55
|
Makanbagh road Saidu sharif
|
0.4
(KM) |
Partially restored |
0.4
(KM) |
Aug 17, 2025
12:48 PM |
|
56
|
Karakal Road UC Gwalerai Swat II
|
01
(KM) |
Partially restored |
0.9
(KM) |
Aug 17, 2025
10:59 AM |
|
Remarks:
Restoration work is in progress
Reported by:
XEN Swat II Matta
|
||||||
57
|
SHANDAL SURKARAI ROAD
No coordinates available
|
1
(KM) |
Not restored |
1
(KM) |
No damage coordinates |
Aug 16, 2025
03:28 PM |
Remarks:
About 500 houses in this UC
Reported by:
XEN Swat II Matta
|
||||||
58
|
Gamon Bridge to Nagoha Road
No coordinates available
|
8.0
(KM) |
Partially restored |
1.5
(KM) |
No damage coordinates |
Aug 16, 2025
02:46 PM |
59
|
Taroko Main road
No coordinates available
|
7
(KM) |
Partially restored |
1
(KM) |
No damage coordinates |
Aug 16, 2025
02:25 PM |
60
|
Qalagay Road
No coordinates available
|
6
(KM) |
Partially restored |
5
(KM) |
No damage coordinates |
Aug 16, 2025
01:49 PM |
61
|
Manglawar Shingrai Road
|
5
(KM) |
Partially restored |
0.03
(KM) |
Aug 16, 2025
01:11 PM |
|
Remarks:
damaged.
Reported by:
XEN Swat I Saidu Sharif
|
||||||
62
|
Jambil Chinar Road
|
2
(KM) |
Partially restored |
0.05
(KM) |
Aug 16, 2025
01:01 PM |
|
Remarks:
damaged.
Reported by:
XEN Swat I Saidu Sharif
|
||||||
63
|
LoyeBand Road
2
|
3
(KM) |
1 Partially restored |
3
(KM) |
Aug 16, 2025
12:30 PM |
|
2 Partially restored |
0.2
(KM) |
No damage coordinates |
Jun 30, 2025
03:49 PM |
|||
Remarks:
cleared debris and filled potholes (by shingle), Retaining walls are still not restored.
Reported by:
XEN Swat I Saidu Sharif
|
||||||
64
|
Banjot Road
|
5
(KM) |
Partially restored |
0.2
(KM) |
Aug 16, 2025
12:22 PM |
|
Remarks:
Retaining wall and road completely damaged
Reported by:
XEN Swat I Saidu Sharif
|
||||||
65
|
Gat Peochar Road
No coordinates available
|
7.5
(KM) |
Partially restored |
2
(KM) |
Aug 16, 2025
10:48 AM |
|
Remarks:
Partially Restored
Reported by:
XEN Swat II Matta
|
||||||
66
|
Nagwa to Gaiman Bridge
No coordinates available
|
5
(KM) |
Not restored |
0.2
(KM) |
No damage coordinates |
Aug 16, 2025
09:54 AM |
67
|
Nagwa to Gaiman Road (2nd Portion)
No coordinates available
|
3
(KM) |
Partially restored |
0.05
(KM) |
No damage coordinates |
Aug 16, 2025
09:41 AM |
68
|
Nagwa to Gaiman road
No coordinates available
|
3
(KM) |
Partially restored |
0.03
(KM) |
No damage coordinates |
Aug 16, 2025
09:18 AM |
69
|
Baligram Link Road Saidu Sharif
|
0.5
(KM) |
Partially restored |
0.25
(KM) |
Jul 24, 2025
12:15 PM |
|
70
|
Panr Usmanabad Road
|
0.5
(KM) |
Partially restored |
0.031
(KM) |
Jul 23, 2025
08:57 AM |
|
71
|
Beshbanr Road UC Akamaroof
|
1
(KM) |
Partially restored |
0.02
(KM) |
Jul 23, 2025
08:41 AM |
|
72
|
Chakdara-Shamozai-Kabal-Kanju-Matta-Bagh Dheri Road P/HWay (S-3-B)
5
|
88
(KM) |
1 Fully restored |
0.1
(KM) |
Jul 16, 2025
01:45 PM |
|
Remarks:
Not yet restored
Reported by:
Managing Director PKHA
|
||||||
2 Partially restored |
0.04
(KM) |
Jul 07, 2025
08:48 AM |
||||
Remarks:
Not Yet Restored
Reported by:
Managing Director PKHA
|
||||||
3 Fully restored |
1.6
(KM) |
Jul 07, 2025
07:59 AM |
||||
4 Fully restored |
0.015
(KM) |
Jul 06, 2025
11:12 AM |
||||
Remarks:
Not Yet Restored
Reported by:
Managing Director PKHA
|
||||||
5 Partially restored |
0.018
(KM) |
Jul 06, 2025
10:55 AM |
||||
Remarks:
Not Yet Restored
Reported by:
Managing Director PKHA
|
||||||
73
|
Nagoha Road near Gamon Bridge
No coordinates available
|
2.20
(KM) |
Partially restored |
0.047
(KM) |
No damage coordinates |
Jul 09, 2025
11:21 AM |
74
|
Barikot Bypass Road
No coordinates available
|
2
(KM) |
Partially restored |
0.1
(KM) |
No damage coordinates |
Jul 08, 2025
12:18 PM |
75
|
Matta Bypass District Swat
2
|
9.5
(KM) |
1 Fully restored |
0.2
(KM) |
Jul 07, 2025
08:39 AM |
|
Remarks:
Fully Restored
Reported by:
Managing Director PKHA
|
||||||
2 Fully restored |
0.172
(KM) |
Jul 07, 2025
08:23 AM |
||||
Remarks:
Not yet restored
Reported by:
Managing Director PKHA
|
||||||
76
|
Shahoona Rahat kot sakhra
|
0.50
(KM) |
Not restored |
0.5
(KM) |
Jul 02, 2025
01:06 PM |
|
Remarks:
Upon approval from the competent forum, work will commence shortly.
Reported by:
XEN Swat II Matta
|
||||||
77
|
swato kalay road
|
1
(KM) |
Partially restored |
0.1
(KM) |
No damage coordinates |
Jul 02, 2025
12:50 PM |
Remarks:
The road, which is presently open to all types of traffic, necessitates urgent rehabilitation. Work will commence shortly upon approval from the competent forum.
Reported by:
XEN Swat II Matta
|
||||||
78
|
cheerbut pakli
|
0.03
(KM) |
Partially restored |
0.02
(KM) |
No damage coordinates |
Jul 02, 2025
12:46 PM |
Remarks:
Upon approval from the competent forum, work will commence shortly.
Reported by:
XEN Swat II Matta
|
||||||
79
|
Damana shaheed baba road
|
1
(KM) |
Partially restored |
1
(KM) |
No damage coordinates |
Jul 02, 2025
12:39 PM |
Remarks:
Upon approval from the competent forum, work will commence shortly.
Reported by:
XEN Swat II Matta
|
||||||
80
|
Chamanlai Dagai road matta
|
0.10
(KM) |
Not restored |
0.1
(KM) |
Jul 02, 2025
12:32 PM |
|
Remarks:
Upon approval from the competent forum, work will commence shortly.
Reported by:
XEN Swat II Matta
|
||||||
81
|
Chail road & shalikyar
|
8.8
(KM) |
Partially restored |
0.2
(KM) |
No damage coordinates |
Jul 02, 2025
12:29 PM |
Remarks:
The road, which is presently open to all types of traffic, necessitates urgent rehabilitation. Work will commence shortly upon approval from the competent forum.
Reported by:
XEN Swat II Matta
|
||||||
82
|
Ghuprial Balasoor Road
No coordinates available
|
11
(KM) |
Partially restored |
0.1
(KM) |
Jul 02, 2025
12:28 PM |
|
Remarks:
Nil
Reported by:
XEN Swat II Matta
|
||||||
83
|
Miandam road bela
|
2
(KM) |
Partially restored |
0.05
(KM) |
No damage coordinates |
Jul 02, 2025
12:23 PM |
Remarks:
The road, which is presently open to all types of traffic, necessitates urgent rehabilitation. Work will commence shortly upon approval from the competent forum.
Reported by:
XEN Swat II Matta
|
||||||
84
|
rorya road
|
4
(KM) |
Partially restored |
0.01
(KM) |
No damage coordinates |
Jul 02, 2025
12:18 PM |
Remarks:
The road, which is presently open to all types of traffic, necessitates urgent rehabilitation. Work will commence shortly upon approval from the competent forum.
Reported by:
XEN Swat II Matta
|
||||||
85
|
Terat dara road
|
6
(KM) |
Fully restored |
1
(KM) |
No damage coordinates |
Jul 02, 2025
12:10 PM |
Remarks:
The road, which is presently open to all types of traffic, necessitates urgent rehabilitation. Work will commence shortly upon approval from the competent forum.
Reported by:
XEN Swat II Matta
|
||||||
86
|
peya chanchary road
|
4
(KM) |
Partially restored |
0.015
(KM) |
No damage coordinates |
Jul 02, 2025
12:05 PM |
Remarks:
The road, which is presently open to all types of traffic, necessitates urgent rehabilitation. Work will commence shortly upon approval from the competent forum.
Reported by:
XEN Swat II Matta
|
||||||
87
|
Dando zowalay road
|
2
(KM) |
Fully restored |
0.09
(KM) |
No damage coordinates |
Jul 02, 2025
11:46 AM |
Remarks:
The road, which is presently open to all types of traffic, necessitates urgent rehabilitation. Work will commence shortly upon approval from the competent forum.
Reported by:
XEN Swat II Matta
|