Bela Bridge
Not restoredThis activity provides a detailed overview of the operational status of the Bridge Bela Bridge, recorded on 15 August, 2026. The affected site is situated within the Kohistan Upper district, operating under the administrative jurisdiction of XEN KOHISTAN UPPER. The infrastructure has been primarily affected by Culvert, encompassing a total span of 3.3 Meters.
The affected area has been mapped using geographic coordinates. The section starts at 73.246145, 35.186772 and ends at 73.249708, 35.189839. For location reference and navigation, view the route on Google Maps.
Comprehensive efforts are currently underway to arrange additional resources and manpower to ensure that the road is restored to a safe and usable condition as soon as possible.
The following photographs provide a visual record of the site conditions before and after the activity, illustrating the extent of the affected area and the improvements achieved through the executed operations.