Stories
Loading...

Schemes

Reset
S.No ADP Number Scheme Code Year Scheme Name Sector Name Local Cost Previous Expenditure Revenue Allocation Total Allocation Views Detail
4691 1922 210769 2026 F/S and Construction of Buner Karakar Tunnel District Buner-(A) /PDWP /31-10-2022 Roads 9582.900 2623.000 0.000 310.000 28 View
4692 1923 220397 2026 Construction of Road from Patrack to Thall Kumrat District Upper Dir (44-KMs)-(A) /PDWP /30-04-2026 Roads 9201.279 1967.900 0.000 572.400 15 View
4693 1924 220406 2026 Construction of Shaheeda Sar to Etay Khwar, Sar Kala to Bar Teraj Road and improvement of Btara to Shangra Road District Buner-(A) /PDWP /07-02-2025 Roads 1424.800 135.000 0.000 50.000 22 View
4694 1925 220606 2026 Construction of RCC bridge on DI Khan Darya Khan Road.-(A) /PDWP /03-09-2025 Roads 5186.102 200.000 0.000 150.000 16 View
4695 1926 220638 2026 Feasibility Study, Detailed Engineering Design and construction of dualization of road from Indus Highway to Bannu City (26-KM)-(A) /PDWP /31-10-2022 Roads 9958.240 10.000 0.000 55.000 13 View
4696 1927 220642 2026 Acquisition of land for Dir Motorway-(A) /PDWP /22-04-2022 Roads 3227.700 1948.800 0.000 96.800 21 View
4697 1928 220942 2026 Construction of RCC Bridge on River Indus near Kotkay Kandar, District Torghar.-(A) /PDWP /01-12-2022 Roads 9948.200 2770.000 0.000 126.000 31 View
4698 1929 220943 2026 F/S detailed Engineering design for construction of Inter District road from Torghar to Buner District (length =25 km)-(A) /PDWP /31-10-2022 Roads 4723.200 1616.000 0.000 200.000 15 View
4699 1930 221119 2026 Widening and Rehabilitation of road from Baryam Chowk to Wanai, Matta District Swat (10.3 KM)-(A) /PDWP /18-10-2023 Roads 987.100 482.800 0.000 88.000 26 View
4700 1931 240193 2026 Rehabilitation Of Batkhela Totakan Qulangy Section (Km 00-22) P-H/Way (S-3), District Malakand-(A) /PDWP /27-02-2026 Roads 1265.363 100.000 0.000 88.000 17 View
CWD