Tochi river Bridge

Tochi river Bridge

Not restored
8 April, 2026 Bannu XEN H/W Bannu

This activity provides a detailed overview of the operational status of the Bridge Tochi river Bridge, recorded on 8 April, 2026. The affected site is situated within the Bannu district, operating under the administrative jurisdiction of XEN H/W Bannu. The infrastructure has been primarily affected by Embankment Damages, encompassing a total span of 30 Meters.

Restoration and clearance efforts were facilitated by the deployment of Concrete Mixer , which remained in active operation for a duration of 20 hours . In a formal assessment of the situation, the reporting officer noted with remarks: Fund required on emergency base for restoration.

The affected area has been mapped using geographic coordinates. The section starts at 70.530108, 32.886016 and ends at 70.527097, 32.884966. For location reference and navigation, view the route on Google Maps.

Comprehensive efforts are currently underway to arrange additional resources and manpower to ensure that the road is restored to a safe and usable condition as soon as possible.

The following photographs provide a visual record of the site conditions before and after the activity, illustrating the extent of the affected area and the improvements achieved through the executed operations.

Before Images (3)
After Images (3)